ML080920607

From kanterella
Jump to navigation Jump to search
Independent Spent Fuel Storage Installation - Regulatory Guide 1.16 Annual Exposure Report
ML080920607
Person / Time
Site: Rancho Seco, 07200011
Issue date: 03/25/2008
From: Rosalyn Jones
Sacramento Municipal Utility District (SMUD)
To:
Office of Nuclear Regulatory Research
References
NQA 08-011, RG-1.016
Download: ML080920607 (3)


Text

  • SMUD SACRAMENTO MUNICIPAL UTILITY DISTRICT The Power To Do More.

P.O. Box 15830, Sacramento, CA 95852-1830; 1-888-742-SMUD (7683)

NQA 08-011 March 25, 2008 REIRS Project Manager Office of Nuclear Regulatory Research U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Docket No. 50-312 Rancho Seco Nuclear Generating Station License No. DPR-54 Docket No. 72-11 Rancho Seco Independent Spent Fuel Storage Installation License SNM-25 10 REGULATORY GUIDE 1.16 ANNUAL EXPOSURE REPORT Attention: REIRS Project Manager In accordance with Rancho Seco Quality Manual Appendix A, Section 1.5.2.2 and the guidance in Regulatory Guide 1.16, we are submitting the enclosed annual exposure report for individuals who receive greater than 100 mrem during 2007. Individuals exposed to greater than 100 mrem accounted for more than 80% of the total exposure at Rancho Seco.

If you, or members of your staff, have questions requiring additional information or clarification, please contact me at (916) 732-4843.

Sincerely, q~oer EEones Superv ing Quality Engineer.

Cc: NRC Region IV RANCHO SECO NUCLEAR PLANT

  • 14440 Twin Cities Road, Herald, CA 95638-9799; (209) 333-2935

SACRAMENTO MUNI UTILITY DIST / SACRAMENTO MUNI UTILITY DIST 03-24-2008 Page 1 ANNUAL REPORT Year of 2007 NUMBER OF PERSONNEL AND MAN-REM BY WORK AND JOB FUNCTION I All Personnel (> 100 mRem) II Total Man-Rem I Station I Utility I Contractors I1 Station I Utility I Contractors IWork & Job Function I Emvlovees I Emzlovees I and Others II Emplovees I Employees I and Others REACTOR OPERATION + SURVEIL

-MAINTENANCE 0 0 0 0.000 0.000 0.000

-OPERATIONS PERSONNEL 0 0 0 0.000 0.000 0.000

-HEALTH PHYSICS 0 0 0 0.000 0.000 0.000

-SUPERVISORY PERSONNEL 0 0 0 0.000 0.000 0.000

-ENGINEERING PERSONNEL 0 0 0 0.000 .0.000 0.000 ROUTINE MAINTENANCE

-MAINTENANCE 0 0 0 0.000 0.000 0.000

-OPERATIONS PERSONNEL 0 0 0 0.000 0.000 0.000

-HEALTH PHYSICS 0 0 0 0.000 0.000 0.000

-SUPERVISORY PERSONNEL 0 0 0 0.000 0.000 .0.000

-ENGINEERING PERSONNEL 0 0 0 0.000 0.000 0.000 INSERVICE INSPECTION

-MAINTENANCE 0 0 0 0.000 0.000 .0.000

-OPERATIONS PERSONNEL 0 0 0 0.000 0.000 0.000

-HEALTH PHYSICS 0 0. 0 0.000 0.000 0.000

-SUPERVISORY PERSONNEL 0 0 0 0.000 0.000 0.000

-ENGINEERING PERSONNEL 0 0 0 0.000 0.000 0.000 SPECIAL MAINTENANCE

-MAINTENANCE 0 0 0 0.000 0.000 0.000

-OPERATIONS PERSONNEL 0 0 0 0.000 0.000 0.000

-HEALTH PHYSICS 0 0 0 0.000 0.000 0.000

-SUPERVISORY PERSONNEL 0 0 0 0.000 0.000 0.000

-ENGINEERING PERSONNEL 0 0 0 0.000 0.000 0.000 WASTE PROCESSING

-MAINTENANCE 0 0 19 0.000 0.000 7.019

-OPERATIONS PERSONNEL 0 0 0 0.000 0.000 0.000

-HEALTH PHYSICS. 2 0 8 0.355 0.000 2.313

-SUPERVISORY PERSONNEL 0 0 0 0.000 0.000 0.000

-ENGINEERING PERSONNEL 3 0 0 0.727 0.000 0.000 REFUELING

-MAINTENANCE 0 0 0 0.000 0.000 0.000

-OPERATIONS PERSONNEL 0 0 0 0.000 0.000 0.000

-HEALTH PHYSICS 0 0 0 0.000 0.000 0.000

-SUPERVISORY PERSONNEL 0 0 0 0.000 0.000 0.000

-ENGINEERING PERSONNEL 0 0 0 0.000 0.000 0.000

SACRAMENTO MUNI UTILITY DIST / SACRAMENTO MUNI UTILITY DIST 03-24-2008 Page 2 ANNUAL REPORT Year of 2007 NUMBER OF PERSONNEL AND MAN-REM BY WORK AND JOB FUNCTION All Personnel (> 100 mRem) 11 Total Man-Rem Station Utility i Contractors Station i Utility I Contractors I Work & Job Function I. Emplovees I Emplovees I and Others I Emtlovees I Emplovees I and Others TOTALS

-MAINTENANCE 0 0 19 0.000 0.C00 7';019

-OPERATIONS PERSONNEL 0 0 0 0.000 0.000 0.000

-HEALTH PHYSICS 2 0 8 0.355 0.000 2.313

-SUPERVISORY PERSONNEL 0 0 0 0.000 0.000 0.000

-ENGINEERING PERSONNEL 3 0 0 0.727 0.000 0.000 GRAND TOTALS 5 0 27 1.083 0.000 9.331