Notice of Meeting with Detroit Edison Company to Present the Licensee the Results of the End-of-Cycle Assessment
ML080860237
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 03/26/2008
From: Christine Lipa
Reactor Projects Region 3 Branch 4
To:
C. A. Lipa,630-829-9619
References
Download: ML080860237 (4)


Text

March 26, 2008 NOTICE OF SIGNIFICANT LICENSEE MEETING THIS MEETING IS OPEN TO PUBLIC ATTENDANCE Name of Licensee: Detroit Edison Company Name of Facility: Fermi Power Plant, Unit 2 Docket No: 50-341 Date and Time of Meeting: Wednesday, April 9, 2008, at 6:00 P.M. (EDT)

Location of Meeting: Monroe County Board of Commissioners' Chambers County Courthouse 125 E. Second Street Monroe, MI 48161 Purpose of Meeting: Discuss NRC End-of-Cycle assessment of Fermi Nuclear Power Plant performance for the 2007 calendar year.

Category: This is a Category 1 Meeting. The public is invited to observe this meeting and will have an opportunity to speak with the NRC after the business portion of the meeting, but before the meeting is adjourned.

NRC Attendees:

C. Lipa, Chief, Branch 4, Division of Reactor Projects R. Morris, Senior Resident Inspector, Fermi T. Steadham, Resident Inspector, Fermi Licensee Attendees:

J. Davis, Chief Nuclear Officer K. Hlavaty, Director, Nuclear Production R. Gaston, Manager, Licensing Others as assigned

Notice of Significant Licensee Meeting NOTE: Attendance at this meeting by NRC personnel, other than those listed above, should be made known to Christine Lipa at 630-829-9619 by COB on Wednesday, April 2, 2008. The NRC provides reasonable accommodation to individuals with disabilities where appropriate. If you need a reasonable accommodation to participate in this meeting, or need this meeting notice or the transcript or other information from the meeting in another format (e.g., braille, large print), please notify the NRCs meeting contact. Determinations on requests for reasonable accommodation will be made on a case-by-case basis.

Approved by: __/RA/____________________________

Christine A. Lipa, Chief Branch 4 Division of Reactor Projects Meeting

Contact:

Christine A. Lipa, Chief Branch 4 (630) 829-9619 Christine.Lipa@nrc.gov

Notice of Significant Licensee Meeting NOTE: Attendance at this meeting by NRC personnel, other than those listed above, should be made known to Christine Lipa at 630-829-9619 by COB on Wednesday, April 2, 2008. The NRC provides reasonable accommodation to individuals with disabilities where appropriate. If you need a reasonable accommodation to participate in this meeting, or need this meeting notice or the transcript or other information from the meeting in another format (e.g., braille, large print), please notify the NRCs meeting contact. Determinations on requests for reasonable accommodation will be made on a case-by-case basis.

Approved by: __/RA/____________________________

Christine A. Lipa, Chief Branch 4 Division of Reactor Projects Meeting

Contact:

Christine A. Lipa, Chief Branch 4 (630) 829-9619 Christine.Lipa@nrc.gov DOCUMENT NAME: G:\BRANCH TSS\ALL EOC\EOC CY 2007\EOC MEETING NOTICES - LETTERS\FERMI PUBLIC MEETING NOTICE.DOC G Publicly Available G Non-Publicly Available G Sensitive G Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII RIII RIII NAME AWilson:dtp CLipa DATE 3/26/08 3/25/08 OFFICIAL RECORD COPY

Notice of Significant Licensee Meeting Distribution:

J. Adams (JTA.EXPO.Exchange), Region III Coordinator, OEDO T. McGinty (TJM1), Deputy Director, Division of Operating Reactor Licensing (DORL), NRR C. Haney, Director, Division of Operating Reactor Licensing (DORL), NRR L. James, Chief, DORL, NRR M. Chernoff, Project Manager, DORL, NRR J. Poole, Project Manager, DORL, NRR C. Pederson (CDP1), Director, Division of Reactor Projects, RIII G. Shear (GLS), Deputy Director, Division of Reactor Projects, RIII S. West (KSW), Director, Division of Reactor Safety, RIII A. Boland (ATB), Deputy Director, Division of Reactor Safety, RIII C. Lipa, Branch Chief M. Morris, SRI, Fermi DRS Branch Chiefs (JFL, DEH, ERD, AMS1, SKO, HXP1)

R. Lickus (RML2), Regional State Liaison Officer, RIII PMNS RIII Public Affairs (VTM, PSC1)

T. Tomczak (TXN), ORA P. Buckley (PLB1), ORA S. Sarna (SLS), DRP