ML080840111

From kanterella
Jump to navigation Jump to search
Lr Hearing - Draft Telecon Summary of March 18, 2008
ML080840111
Person / Time
Site: Indian Point  Entergy icon.png
Issue date: 03/19/2008
From:
Office of Nuclear Reactor Regulation
To:
Division of License Renewal
References
Download: ML080840111 (8)


Text

From:

Kimberly Green To:

"MICHAEL D STROUD" <MSTROUD@entergy.com>

Date:

3/19/2008 2:20:43 PM

Subject:

Draft Telecon Summary of March 18, 2008 cc:

<dtyner@entergy.com>,<IPNonPublicHearingFile@nrc.gov>

Mike, Attached is the draft telecon summary of March 18, 2008. Please review and let me know if you have any questions or clarifications.
Thanks, Kim

Hearing Identifier:

IndianPointUnits2and3NonPublic Email Number:

436 Mail Envelope Properties (47E78011.HQGWDO01.OWGWPO04.200.2000008.1.180752.1)

Subject:

Draft Telecon Summary of March 18, 2008 Creation Date:

3/19/2008 2:20:43 PM From:

Kimberly Green Created By:

KJG1@nrc.gov Recipients

<dtyner@entergy.com>

<IPNonPublicHearingFile@nrc.gov>

"MICHAEL D STROUD" <MSTROUD@entergy.com>

Post Office Route OWGWPO04.HQGWDO01 nrc.gov Files Size Date & Time MESSAGE 158 3/19/2008 2:20:43 PM Telecon Summary 03-18-08 Thermography Continued.doc 55808 3/24/2008 10:18:57 AM Options Priority:

Standard Reply Requested:

No Return Notification:

None None Concealed

Subject:

No Security:

Standard

LICENSEE: Entergy Nuclear Operations, Inc.

FACILITY: Indian Point Nuclear Generating Unit Nos. 2 and 3

SUBJECT:

SUMMARY

OF TELEPHONE CONFERENCE CALL HELD ON MARCH 18, 2008, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND ENTERGY NUCLEAR OPERATIONS, INC., CONCERNING RESPONSE TO AUDIT ITEM RELATED TO THE INDIAN POINT NUCLEAR GENERATING UNIT NOS. 2 AND 3, LICENSE RENEWAL APPLICATIONBOLTED CONNECTIONS The U.S. Nuclear Regulatory Commission (NRC or the staff) and representatives of Entergy Nuclear Operations, Inc. held a telephone conference call on March 18, 2008. The purpose of the call was to discuss new information regarding thermography. This telephone conference was subsequent to a telephone conference held on February 8, 2008 (ADAMS accession number ML080420629). After the call on February 8, 2008, the staff determined that it may not be possible to perform thermography through an enclosure of an energized circuit. During the call on March 18, 2008, the staff informed Entergy of this recent determination, but stated that the Division of Engineering has indicated that visual inspection alone cannot detect a degraded condition, and that visual inspection should be a supplement to thermography or contact resistance testing. Entergy reiterated its position that the opening of an enclosure to an energized circuit was against its policies and safety procedures, and that resistance testing cannot be done on some components because the portions required for the testing are inaccessible. Because the program requires a one-time inspection and sampling, Entergy would not disassemble components for a resistance test. As such, Entergy said that it would submit its response to audit item 63 as previously written, but at the request of the staff would include a listing of the busses that would subject to the relevant aging management program.

The Enclosure provides a listing of the participants.

The applicant had an opportunity to comment on this summary.

Kimberly Green, Safety Project Manager Projects Branch 2 Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-247 and 50-286

Enclosure:

List of Participants

cc w/encl: See next page

LICENSEE: Entergy Nuclear Operations, Inc.

FACILITY: Indian Point Nuclear Generating Unit Nos. 2 and 3

SUBJECT:

SUMMARY

OF TELEPHONE CONFERENCE CALL HELD ON MARCH 18, 2008, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND ENTERGY NUCLEAR OPERATIONS, INC., CONCERNING RESPONSE TO AUDIT ITEM RELATED TO THE INDIAN POINT NUCLEAR GENERATING UNIT NOS. 2 AND 3, LICENSE RENEWAL APPLICATIONBOLTED CONNECTIONS The U.S. Nuclear Regulatory Commission (NRC or the staff) and representatives of Entergy Nuclear Operations, Inc. held a telephone conference call on March 18, 2008. The purpose of the call was to discuss new information regarding thermography. This telephone conference was subsequent to a telephone conference held on February 8, 2008 (ADAMS accession number ML080420629). After the call on February 8, 2008, the staff determined that it may not be possible to perform thermography through an enclosure of an energized circuit. During the call on March 18, 2008, the staff informed Entergy of this recent determination, but stated that the Division of Engineering has indicated that visual inspection alone cannot detect a degraded condition, and that visual inspection should be a supplement to thermography or contact resistance testing. Entergy reiterated its position that the opening of an enclosure to an energized circuit was against its policies and safety procedures, and that resistance testing cannot be done on some components because the portions required for the testing are inaccessible. Because the program requires a one-time inspection and sampling, Entergy would not disassemble components for a resistance test. As such, Entergy said that it would submit its response to audit item 63 as previously written, but at the request of the staff would include a listing of the busses that would subject to the relevant aging management program.

The Enclosure provides a listing of the participants.

The applicant had an opportunity to comment on this summary.

Kimberly Green, Safety Project Manager Projects Branch 2 Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-247 and 50-286

Enclosure:

List of Participants cc w/encl: See next page DISTRIBUTION: See next page ADAMS Accession No.: G:\\ADRO\\DLR\\RPB2\\Indian Point\\Safety Review\\Telecon Summaries\\Telecon Summary 03-18-08 Thermography Continued.doc

OFFICE LA:DLR PM:RPB2:DLR BC:RPB2:DLR NAME KGreen RFranovich DATE 03/ /08 03/ /08 03/ /08 OFFICIAL RECORD COPY

ENCLOSURE TELEPHONE CONFERENCE CALL INDIAN POINT NUCLEAR GENERATING UNIT NOS. 2 AND 3 LICENSE RENEWAL APPLICATION LIST OF PARTICIPANTS MARCH 18, 2008 PARTICIPANTS AFFILIATIONS Kim Green U.S. Nuclear Regulatory Commission (NRC)

Duc Nguyen NRC Mike Stroud Entergy Nuclear Operations, Inc. (Entergy)

Roger Rucker Entergy