March 19, 2008 Mr. James J. Sheppard President and Chief Executive Officer STP Nuclear Operating Company South Texas Project Electric Generating Station P.O. Box 289 Wadsworth, TX 77483
SUBJECT:
SOUTH TEXAS PROJECT, UNITS 1 AND 2 - REQUEST FOR ADDITIONAL INFORMATION RE: LICENSE AMENDMENT REQUEST RELATED TO TSTF-448, REVISION 3 (TAC NOS. MD5942 AND MD5943)
Dear Mr. Sheppard:
By application dated June 26, 2007, STP Nuclear Operating Company (the licensee) requested the U.S. Nuclear Regulatory Commission (NRC) staff approval of an amendment to the South Texas Project, Units 1 and 2, technical specifications related to control room envelope habitability, in accordance with Technical Specifications Task Force (TSTF) Traveler TSTF-448, Revision 3.
The NRC staff has reviewed the information provided in your submittal and determined that additional information is required in order to complete its review. Please provide a response to the enclosed questions by May 2, 2008.
The NRC staff considers that timely responses to requests for additional information help ensure sufficient time is available for staff review and contribute toward the NRCs goal of efficient and effective use of staff resources. If circumstances result in the need to revise the requested response date, please contact me at (301) 415-1476.
Sincerely,
/RA by Carl F. Lyon for/
Mohan C. Thadani, Senior Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-498 and 50-499
Enclosure:
Request for Additional Information cc w/encl: See next page
(*) memo dated OFFICE NRR/LPL4/PM NRR/LPL4/LA DSS/SCVB/BC NRR/LPL4/BC NAME MThadani, CFL for JBurkhardt RDennig (*)
THiltz DATE 3/18/08 3/18/08 3/6/08 3/19/08
South Texas Project, Units 1 and 2 12/5/2007 cc:
Senior Resident Inspector U.S. Nuclear Regulatory Commission P.O. Box 289 Wadsworth, TX 77483 C. M. Canady City of Austin Electric Utility Department 721 Barton Springs Road Austin, TX 78704 J. J. Nesrsta/R. K. Temple E. Alercon/Kevin Pollo CPS Energy P.O. Box 1771 San Antonio, TX 78296 INPO Records Center 700 Galleria Parkway Atlanta, GA 30339-3064 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011 Steve Winn/Christie Jacobs Eddy Daniels/Marty Ryan NRC Energy, Inc.
211 Carnegie Center Princeton, NJ 08540 Mr. Nate McDonald County Judge for Matagorda County
\\1700 7th Street, Room 301 Bay City, TX 77414 A. H. Gutterman, Esq.
Morgan, Lewis & Bockius 1111 Pennsylvania Avenue, NW Washington, DC 20004 E. D. Halpin, Site Vice President STP Nuclear Operating Company South Texas Project Electric Generating Station P.O. Box 289 Wadsworth, TX 77483 S. M. Head, Manager, Licensing STP Nuclear Operating Company P.O. Box 289, Mail Code: N5014 Wadsworth, TX 77483 C. T. Bowman, General Manager, Oversight STP Nuclear Operating Company P.O Box 289 Wadsworth, TX 77483 Ms. Marilyn Kistler Senior Staff Specialist, Licensing STP Nuclear Operating Company P.O. Box 289, Mail Code 5014 Wadsworth, TX 77483 Environmental and Natural Resources Policy Director P.O. Box 12428 Austin, TX 78711-3189 Mr. Jon C. Wood Cox, Smith, & Matthews 112 East Pecan, Suite 1800 San Antonio, TX 78205 Director, Division of Compliance & Inspection Bureau of Radiation Control Texas Department of State Health Services 1100 West 49th Street Austin, TX 78756 Mr. Ted Enos 4200 South Hulen Suite 422 Ft. Worth, TX 76109 Mr. Brian Almon Public Utility Commission of Texas P.O. Box 13326 Austin, TX 78711-3326
2 South Texas Project, Units 1 and 2 12/5/2007 Ms. Susan M. Jablonski Office of Permitting, Remediation and Registration Texas Commission on Environmental Quality MC-122 P.O. Box 13087 Austin, TX 78711-3087 Mr. Ken Coates, Plant General Manager STP Nuclear Operating Company South Texas Project Electric Generating Station P.O. Box 289 Wadsworth, TX 77483 Mr. Anthony P. Jones, Chief Boiler Inspector Texas Department of Licensing and Regulation Boiler Division E.O. Thompson State Office Building P.O. Box 12157 Austin, TX 78711
OFFICE OF NUCLEAR REACTOR REGULATION REQUEST FOR ADDITIONAL INFORMATION RELATED TO LICENSE AMENDMENT REQUEST STP NUCLEAR OPERATING COMPANY SOUTH TEXAS PROJECT, UNITS 1 AND 2 DOCKET NOS. 50-498 AND 499 The Nuclear Regulatory Commission (NRC) staff has reviewed the STP Nuclear Operating Company (STPNOC) request dated June 26, 2007 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML071870252), for approval of an amendment to the South Texas Project, Units 1 and 2, technical specifications (TS) related to control room envelope habitability, in accordance with TS Task Force (TSTF) Traveler TSTF-448, Revision 3.
The staff has determined that additional information is necessary to complete its review of the request. Please provide a response which addresses the following request for additional information questions from the Containment and Ventilation Branch.
- 1.
In Section 2.2, page 1 of 5 of Attachment 1 to your letter dated June 26, 2007 (NOC-AE-07002165), it is stated that STPNOC proposes to reference NEI [Nuclear Energy Institute] 99-03, Revision 0, dated June 2001, in the TS basis for TS 3.7.7, instead of Revision 1, dated March 2003 because the NRC has not formally endorsed Revision 1. The staff understands this to mean that because the NRC has not endorsed Revision 1, STPNOC will not reference this document at any point. However, in Section 6.8.3.p.3, page 3 of 5 of Attachment 2, you identified under item 1) a general exception to Section C of Regulatory Guide (RG) 1.197, Revision 0, by stating that Section 4.3.2 Periodic CRH [Control Room Habitability] Assessment from NEI 99-03 Revision 1 will be used as input to a site specific Self Assessment procedure. Please clarify this inconsistency, keeping in mind that the NRC has neither formally endorsed NEI 99-03, Revision 1 nor has it reviewed this document.
- 2.
In Section 2.2, page 2 of 5 (second paragraph) of Attachment 2, it is stated that [n]o inleakage test is required to determine unfiltered in-leakage from hazardous chemical since this would be a value much less than that currently assumed in the hazardous chemical analyses. Note that NRC RG 1.197 refers to RG 1.78 for guidance on meeting a hazardous chemical challenge. In general, the staff finds it acceptable for licensees to commit to the guidance of RG 1.78 to address hazardous chemical challenges. In the discussion you provided to address chemical hazardous challenges, it is not clear that you are in agreement with the staff position on this issue. Please provide a discussion indicating that your position is consistent with the staff position as outlined in RG 1.78, or provide justification for the differences.