Annual Summary of Commitment Changes Implemented Without Prior NRC Notification for Calendar Year 2007
ML080660084
Person / Time
Site: Saint Lucie  
Issue date: 02/21/2008
From: Johnston G
Florida Power & Light Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
L-2008-025, RIS-00-017
Download: ML080660084 (2)


Text

Florida Power & Light Company, 6501 S. Ocean Drive, Jensen Beach, FL 34957 February 21, 2008 I=PL L-2008-025 10 CFR 50.4 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 RE:

St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389 Annual Summary of Commitment Changes Implemented Without Prior NRC Notification for Calendar Year 2007 Pursuant to the guidance of NRC Regulatory Issue Summary (RIS) 2000-17, Managing Regulatory Commitments Made by Power Reactor Licensees to the NRC Staff and NRC endorsed Nuclear Energy Institute (NEI) 99-04, Guidefines for Managing NRC Commitment Changes, attached is a summary of commitments that were changed during calendar year 2007 without prior NRC approval but requiring NRC notification in an annual report.

Please contact us if there are any questions regarding this submittal.

Very truly yours, Stdn. olnst Gordon L. Johnst n Site Vice Presidern" St. Lucie Plant GLJ/tlt Attachment

,4oo/

an FPL Group company

St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389 L-2008-025 Attachment Page 1 Ik NIK(U (3en L-85-277 PM Unit 2 reactor trip circuit breakers (RTCB) every 6 months.

Subject molded case circuit breakers - GE reactor trip circuit breakers (RTCB) - no longer stocked at PSL and replaced with industry accepted Masterpact RTCBs. PM Unit 2 RTCBs every 6 years, which is the industry standard.

NRC Inspection Report Replace the existing non-functional The Halon system was restored to operable status.

2006010 / FPL letter Halon system with a pre-action The proposed schedule for the new suppression L-2007-001 sprinkler system in approximately one system to be functional is in long-range planning.

year.