Requalification Program Inspection - FitzPatrick Nuclear Power Plant
ML080630412
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 03/03/2008
From: Hansell S
Operations Branch I
To: Peter Dietrich
Entergy Nuclear Northeast
Shared Package
ML080630412 List:
References
Download: ML080630412 (5)


Text

March 3, 2008 Mr. Peter T. Dietrich Site Vice President Entergy Nuclear Northeast James A. FitzPatrick Nuclear Power Plant Post Office Box 110 Lycoming, NY 13093

SUBJECT:

REQUALIFICATION PROGRAM INSPECTION - FITZPATRICK NUCLEAR POWER PLANT

Dear Mr. Dietrich:

In a telephone conversation on February 25, 2008, Mr. Joseph DAntonio, Senior Operations Engineer, and Mr. Gary Fronk, Requal Lead Examiner, made arrangements for the U. S.

Nuclear Regulatory Commission (NRC) to inspect the licensed operator requalification program at the FitzPatrick Nuclear Power Plant facility. The inspection is planned for the week of April 28, 2008, which coincides with your regularly scheduled requalification examination cycle.

The staff at your facility should prepare and conduct the requalification examinations in accordance with your NRC-approved requalification program.

In accordance with 10 CFR 55.59(c), the NRC may request facility licensees to submit their biennial comprehensive requalification written examinations or annual operating tests as necessary to support the NRC's inspection program needs. In order for the NRC to adequately prepare for this inspection, please furnish: 1) an index or summary of condition reports written in the past two years in which licensed operator errors were determined to be the root or contributing cause; 2) an index or summary of deficiency reports written in the past two years on simulator performance problems, and 3) the examination schedule, sample plan, written examinations (if any) and operating test scheduled for the week of the inspection to the NRC by April 21, 2008. Mr. Fronk has been advised of this request and provided with the name and address of the NRC lead inspector assigned to this inspection.

This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number 3150-0018, which expires on June 30, 2009.

The public reporting burden for this collection of information is estimated to average 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the Information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission, Washington, D.C. 20555-0001, or by Internet electronic mail at BJS1@NRC.GOV ; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0101), Office of Management and Budget, Washington, D.C. 20503-0001.

Mr. P. Dietrich The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number. In accordance with 10 CFR 2.390 of the NRC=s ARules of Practice,@ a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC=s document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (The Public Electronic Reading Room).

Thank you for your cooperation in this matter. If you have any questions regarding this inspection, please contact Mr. Joseph DAntonio at (610) 337-5085.

Sincerely,

/RA/

Samuel L. Hansell, Jr., Chief Operations Branch Division of Reactor Safety Docket No. 50-333 License No. DPR-59

Mr. P. Deitrich The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number. In accordance with 10 CFR 2.390 of the NRC=s ARules of Practice,@ a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC=s document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (The Public Electronic Reading Room).

Thank you for your cooperation in this matter. If you have any questions regarding this inspection, please contact Mr. Joseph DAntonio at (610) 337-5085.

Sincerely,

/RA/

Samuel L. Hansell, Jr., Chief Operations Branch Division of Reactor Safety Docket No. 50-333 License No. DPR-59 SUNSI Review Complete: JMD (Reviewer=s Initials)

ADAMS PKG: ML080280020 ADAMS ACC#ML080630412 DOCUMENT NAME: G:\DRS\Operations Branch\DANTONIO\Requal FY08 - Fitz Apr08\60dayrpi.doc After declaring this document AAn Official Agency Record@ it will be released to the Public.

To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRS/OB RI/DRS/OB RI/DRS/OB NAME CJBixler/CJB JMDAntonio/JMD SLHansell/SLH DATE 03/03/08 02/28/08 03/03/08 OFFICIAL RECORD COPY

Mr. P. Dietrich cc w/encl:

Senior Vice President, Entergy Nuclear Operations Vice President, Oversight, Entergy Nuclear Operations Senior Manager, Nuclear Safety and Licensing, Entergy Nuclear Operations Assistant General Counsel, Entergy Nuclear Operations Manager, Licensing, Entergy Nuclear Operations P. Tonko, President and CEO, New York State Energy Research and Development Authority P. Eddy, New York State Department of Public Service S. Lyman, Oswego County Administrator Supervisor, Town of Scriba C. Donaldson, Esquire, Assistant Attorney General, New York Department of Law S. Lousteau, Treasury Department, Entergy Services J. Spath, Program Director, New York State Energy Research and Development Authority D. Johnson, Manager, Training and Development

Mr. P. Dietrich Distribution:

DRS Master Exam File (C. Bixler) (w/concurrences)

DRS File Distribution w/encl: (VIA E-MAIL)

S. Collins, RA M. Dapas, DRA M. Gamberoni, DRS S. Hansell, DRS J. DAntonio, Chief Examiner, DRS E. Cobey, DRP D. Jackson, DRP B. Welling, DRP G. West, RI OEDO (Acting)

M. Kowal, NRR J. Boska, PM NRR J. Hughey, NRR N. Salgado, NRR/ADRO/DIRS/IO G. Hunegs, DRP, Senior Resident Inspector S. Rutenkroger, DRP, Resident Inspector K. Kolek, Resident OA