Request for Information Associated with Containment Sump IR 05000266-08-003 (DRS) and 05000301-08-003 (DRS)
ML080630370
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 03/03/2008
From: Ann Marie Stone
NRC/RGN-III/DRS/EB2
To: Mccarthy J
Florida Power & Light Energy Point Beach
References
IR-08-003
Download: ML080630370 (6)


See also: IR 05000266/2008003

Text

March 3, 2008

Mr. James McCarthy

Site Vice President

FPL Energy Point Beach, LLC

6610 Nuclear Road

Two Rivers, WI 54241

SUBJECT:

POINT BEACH NUCLEAR PLANT

REQUEST FOR INFORMATION NRC INSPECTION ASSOCIATED WITH

CONTAINMENT SUMP 05000266/2008003(DRS); 05000301/2008003(DRS)

Dear Mr. McCarthy:

On April 07, 2008, the NRC will begin an inspection at the Point Beach Nuclear Power Station.

One inspector will perform this 1-week inspection in accordance with NRC Temporary

Instruction (TI) 2525/166, Pressurized Water Reactor Containment Sump Blockage. This

inspection focuses on commitments made by Point Beach Nuclear Power Station in response to

Generic Letter (GL) 2004-02, Potential Impact of Debris Blockage on Emergency Sump

Recirculation at Pressurized Water Reactors (PWRs).

In order to minimize the inspection impact on the site and to ensure a productive inspection for

both parties, we have enclosed a request for documents needed for the inspection. These

documents have been divided into two groups. The first group is required prior to the inspection

to ensure that the inspector is adequately prepared. This information should be provided to the

Regional Office no later than March 24, 2008.

The second group of requested documents contains additional items that the inspector will

review, or need access to, during the inspection, and should be available by the first day of the

on-site inspection. It is important that all of these documents are up to date and complete in

order to minimize the number of additional documents requested during the preparation and/or

the on-site portions of the inspection.

The inspector for this inspection is Caroline E. Acosta Acevedo. If there are any questions

about the inspection or the material requested, please contact the inspector at (630) 829-9718

or via e-mail at caroline.acosta@nrc.gov.

J. McCarthy

-2-

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and

its enclosure will be available electronically for public inspection in the NRC Public Document

Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide

Documents Access and Management System (ADAMS), accessible from the NRC Web site at

http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Ann Marie Stone, Chief

Engineering Branch 2

Division of Reactor Safety

Docket Nos. 50-266; 50-301

License Nos. DRP-24; DRP-27

Enclosure:

INFORMATION REQUEST FOR GENERIC NUCLEAR POWER PLANT

TEMPORARY INSTRUCTION (TI) 2525/166 INSPECTION

cc w/encl:

M. Nazar, Senior Vice President and Nuclear

Chief Operating Officer

J. Stall, Senior Vice President and

Chief Nuclear Officer

R. Kundalkar, Vice President, Nuclear Technical Services

Licensing Manager, Point Beach Nuclear Plant

M. Ross, Managing Attorney

A. Fernandez, Senior Attorney

K. Duveneck, Town Chairman

Town of Two Creeks

Chairperson

Public Service Commission of Wisconsin

J. Kitsembel, Electric Division

Public Service Commission of Wisconsin

P. Schmidt, State Liaison Officer

J. McCarthy

-2-

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and

its enclosure will be available electronically for public inspection in the NRC Public Document

Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide

Documents Access and Management System (ADAMS), accessible from the NRC Web site at

http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Ann Marie Stone, Chief

Engineering Branch 2

Division of Reactor Safety

Docket Nos. 50-266; 50-301

License Nos. DRP-24; DRP-27

Enclosure:

INFORMATION REQUEST FOR GENERIC NUCLEAR POWER PLANT

TEMPORARY INSTRUCTION (TI) 2525/166 INSPECTION

cc w/encl:

M. Nazar, Senior Vice President and Nuclear

Chief Operating Officer

J. Stall, Senior Vice President and

Chief Nuclear Officer

R. Kundalkar, Vice President, Nuclear Technical Services

Licensing Manager, Point Beach Nuclear Plant

M. Ross, Managing Attorney

A. Fernandez, Senior Attorney

K. Duveneck, Town Chairman

Town of Two Creeks

Chairperson

Public Service Commission of Wisconsin

J. Kitsembel, Electric Division

Public Service Commission of Wisconsin

P. Schmidt, State Liaison Officer

DOCUMENT NAME: G:\\DRS\\Work in Progress\\Ltr 02__08 Point Beach RFI NAF.doc

9 Publicly Available

9 Non-Publicly Available 9 Sensitive 9 Non-Sensitive

To receive a copy of this document, indicate in the concurrence box C = Copy without attach/encl; E = Copy with attach/encl N = No copy

OFFICE RIII

RIII

RIII

RIII

NAME

CEAcostaAcevedo: ls

AMStone

DATE

03/03/08

03/03/08

OFFICIAL RECORD COPY

Letter to Mr. James McCarthy from Ms. Ann Marie Stone dated March 3, 2008.

SUBJECT:

POINT BEACH NUCLEAR PLANT

REQUEST FOR INFORMATION NRC INSPECTION ASSOCIATED WITH

CONTAINMENT SUMP 05000266/2008003(DRS); 05000301/2008003(DRS)

DISTRIBUTION:

TEB

CFL

EMH1

LXR1

RidsNrrDirsIrib

MAS

KGO

JKH3

CAA1

RGK

DRPIII

DRSIII

PLB1

TXN

ROPreports@nrc.gov

INFORMATION REQUEST FOR GENERIC NUCLEAR POWER PLANT

TEMPORARY INSTRUCTION (TI) 2525/166 INSPECTION

1

Enclosure

Inspection Report: 05000266/2008003; 05000301/2008003(DRS)

Inspection Dates:

April 07, 2008 - April 11, 2008

Inspection Procedures: TI 2525/166, Pressurized Water Reactor Containment Sump

Blockage

IP 71111.17, Changes, Tests, or Experiments, and Permanent

Plant Modifications (reference)

Inspector:

Caroline E. Acosta Acevedo, Reactor Engineer

(630) 829-9718 (caroline.acosta@nrc.gov)

I.

Information Requested for Our In-office Preparation Week

The following information is requested by March 24, 2008, or sooner, to facilitate

inspection preparation. If you have any questions regarding this information, please call

the inspector as soon as possible. (Please provide the information electronically in pdf

files, Excel, or other searchable formats, preferably on CDROM. The CDROM should

contain descriptive names to facilitate ease of use.)

1. A list of all correspondences to/from the site related to GL 2004-02. This list should

include the addressor, addressee, subject matter, and date of correspondence.

2. A list of modifications, procedure changes or other commitments made in response

to GL 2004-02 as documented in the Item 1 responses. (For the purpose of this

inspection, modifications include permanent plant changes, design changes, set

point changes, equivalency evaluations, suitability analyses, and commercial grade

dedications.)

3. Name(s) and phone numbers for the regulatory and technical contacts.

II.

Information Requested to be Available on First Day of Inspection (April 07, 2008)

1. Copies of the modifications and procedure changes made in response to GL 2004-02

or committed to in the documents from Item I. Modification documents should include

a design description, records showing date of completion and 10 CFR 50.59

applicability determination, screening, or evaluation.

INFORMATION REQUEST FOR GENERIC NUCLEAR POWER PLANT

TEMPORARY INSTRUCTION (TI) 2525/166 INSPECTION

2

Enclosure

2. Please ensure that other supporting documents for the selected items have been

located and are readily retrievable as the inspector will likely be requesting these

documents during the inspections. Examples of supporting documents are:

a. Drawings supporting the modifications;

b. Calculations related to the modifications;

c. Procedures affected by the modifications; and

d. UFSAR change papers generated due to a 10 CFR 50.59 evaluation.

3. List of related calculation changes that have been issued for use.

4. List of any related corrective action documents (open and closed).

5. Copies of procedures addressing the following: modifications, design changes, set

point changes, equivalency evaluations or suitability analyses, commercial grade

dedications, post-modification testing, 10 CFR 50.59 evaluation and screenings, and

UFSAR updates.

6. Copy of the UFSAR change log (or a synopsis of changes). This should

include all of the changes made to the UFSAR that were incorporated in the last

10 CFR 50.71(e)(4) submittal and any approved changes to the current UFSAR.

If you have questions regarding the information requested, please contact the lead inspector.