ML080630370
| ML080630370 | |
| Person / Time | |
|---|---|
| Site: | Point Beach |
| Issue date: | 03/03/2008 |
| From: | Ann Marie Stone NRC/RGN-III/DRS/EB2 |
| To: | Mccarthy J Florida Power & Light Energy Point Beach |
| References | |
| IR-08-003 | |
| Download: ML080630370 (6) | |
See also: IR 05000266/2008003
Text
March 3, 2008
Mr. James McCarthy
Site Vice President
6610 Nuclear Road
Two Rivers, WI 54241
SUBJECT:
POINT BEACH NUCLEAR PLANT
REQUEST FOR INFORMATION NRC INSPECTION ASSOCIATED WITH
CONTAINMENT SUMP 05000266/2008003(DRS); 05000301/2008003(DRS)
Dear Mr. McCarthy:
On April 07, 2008, the NRC will begin an inspection at the Point Beach Nuclear Power Station.
One inspector will perform this 1-week inspection in accordance with NRC Temporary
Instruction (TI) 2525/166, Pressurized Water Reactor Containment Sump Blockage. This
inspection focuses on commitments made by Point Beach Nuclear Power Station in response to
Generic Letter (GL) 2004-02, Potential Impact of Debris Blockage on Emergency Sump
Recirculation at Pressurized Water Reactors (PWRs).
In order to minimize the inspection impact on the site and to ensure a productive inspection for
both parties, we have enclosed a request for documents needed for the inspection. These
documents have been divided into two groups. The first group is required prior to the inspection
to ensure that the inspector is adequately prepared. This information should be provided to the
Regional Office no later than March 24, 2008.
The second group of requested documents contains additional items that the inspector will
review, or need access to, during the inspection, and should be available by the first day of the
on-site inspection. It is important that all of these documents are up to date and complete in
order to minimize the number of additional documents requested during the preparation and/or
the on-site portions of the inspection.
The inspector for this inspection is Caroline E. Acosta Acevedo. If there are any questions
about the inspection or the material requested, please contact the inspector at (630) 829-9718
or via e-mail at caroline.acosta@nrc.gov.
J. McCarthy
-2-
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and
its enclosure will be available electronically for public inspection in the NRC Public Document
Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide
Documents Access and Management System (ADAMS), accessible from the NRC Web site at
http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
Ann Marie Stone, Chief
Engineering Branch 2
Division of Reactor Safety
Docket Nos. 50-266; 50-301
License Nos. DRP-24; DRP-27
Enclosure:
INFORMATION REQUEST FOR GENERIC NUCLEAR POWER PLANT
TEMPORARY INSTRUCTION (TI) 2525/166 INSPECTION
cc w/encl:
M. Nazar, Senior Vice President and Nuclear
Chief Operating Officer
J. Stall, Senior Vice President and
Chief Nuclear Officer
R. Kundalkar, Vice President, Nuclear Technical Services
Licensing Manager, Point Beach Nuclear Plant
M. Ross, Managing Attorney
A. Fernandez, Senior Attorney
K. Duveneck, Town Chairman
Town of Two Creeks
Chairperson
Public Service Commission of Wisconsin
J. Kitsembel, Electric Division
Public Service Commission of Wisconsin
P. Schmidt, State Liaison Officer
J. McCarthy
-2-
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and
its enclosure will be available electronically for public inspection in the NRC Public Document
Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide
Documents Access and Management System (ADAMS), accessible from the NRC Web site at
http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
Ann Marie Stone, Chief
Engineering Branch 2
Division of Reactor Safety
Docket Nos. 50-266; 50-301
License Nos. DRP-24; DRP-27
Enclosure:
INFORMATION REQUEST FOR GENERIC NUCLEAR POWER PLANT
TEMPORARY INSTRUCTION (TI) 2525/166 INSPECTION
cc w/encl:
M. Nazar, Senior Vice President and Nuclear
Chief Operating Officer
J. Stall, Senior Vice President and
Chief Nuclear Officer
R. Kundalkar, Vice President, Nuclear Technical Services
Licensing Manager, Point Beach Nuclear Plant
M. Ross, Managing Attorney
A. Fernandez, Senior Attorney
K. Duveneck, Town Chairman
Town of Two Creeks
Chairperson
Public Service Commission of Wisconsin
J. Kitsembel, Electric Division
Public Service Commission of Wisconsin
P. Schmidt, State Liaison Officer
DOCUMENT NAME: G:\\DRS\\Work in Progress\\Ltr 02__08 Point Beach RFI NAF.doc
9 Publicly Available
9 Non-Publicly Available 9 Sensitive 9 Non-Sensitive
To receive a copy of this document, indicate in the concurrence box C = Copy without attach/encl; E = Copy with attach/encl N = No copy
OFFICE RIII
RIII
RIII
RIII
NAME
CEAcostaAcevedo: ls
AMStone
DATE
03/03/08
03/03/08
OFFICIAL RECORD COPY
Letter to Mr. James McCarthy from Ms. Ann Marie Stone dated March 3, 2008.
SUBJECT:
POINT BEACH NUCLEAR PLANT
REQUEST FOR INFORMATION NRC INSPECTION ASSOCIATED WITH
CONTAINMENT SUMP 05000266/2008003(DRS); 05000301/2008003(DRS)
DISTRIBUTION:
TEB
CFL
EMH1
LXR1
RidsNrrDirsIrib
MAS
KGO
JKH3
CAA1
RGK
DRPIII
DRSIII
PLB1
TXN
ROPreports@nrc.gov
INFORMATION REQUEST FOR GENERIC NUCLEAR POWER PLANT
TEMPORARY INSTRUCTION (TI) 2525/166 INSPECTION
1
Enclosure
Inspection Report: 05000266/2008003; 05000301/2008003(DRS)
Inspection Dates:
April 07, 2008 - April 11, 2008
Inspection Procedures: TI 2525/166, Pressurized Water Reactor Containment Sump
Blockage
IP 71111.17, Changes, Tests, or Experiments, and Permanent
Plant Modifications (reference)
Inspector:
Caroline E. Acosta Acevedo, Reactor Engineer
(630) 829-9718 (caroline.acosta@nrc.gov)
I.
Information Requested for Our In-office Preparation Week
The following information is requested by March 24, 2008, or sooner, to facilitate
inspection preparation. If you have any questions regarding this information, please call
the inspector as soon as possible. (Please provide the information electronically in pdf
files, Excel, or other searchable formats, preferably on CDROM. The CDROM should
contain descriptive names to facilitate ease of use.)
1. A list of all correspondences to/from the site related to GL 2004-02. This list should
include the addressor, addressee, subject matter, and date of correspondence.
2. A list of modifications, procedure changes or other commitments made in response
to GL 2004-02 as documented in the Item 1 responses. (For the purpose of this
inspection, modifications include permanent plant changes, design changes, set
point changes, equivalency evaluations, suitability analyses, and commercial grade
3. Name(s) and phone numbers for the regulatory and technical contacts.
II.
Information Requested to be Available on First Day of Inspection (April 07, 2008)
1. Copies of the modifications and procedure changes made in response to GL 2004-02
or committed to in the documents from Item I. Modification documents should include
a design description, records showing date of completion and 10 CFR 50.59
applicability determination, screening, or evaluation.
INFORMATION REQUEST FOR GENERIC NUCLEAR POWER PLANT
TEMPORARY INSTRUCTION (TI) 2525/166 INSPECTION
2
Enclosure
2. Please ensure that other supporting documents for the selected items have been
located and are readily retrievable as the inspector will likely be requesting these
documents during the inspections. Examples of supporting documents are:
a. Drawings supporting the modifications;
b. Calculations related to the modifications;
c. Procedures affected by the modifications; and
d. UFSAR change papers generated due to a 10 CFR 50.59 evaluation.
3. List of related calculation changes that have been issued for use.
4. List of any related corrective action documents (open and closed).
5. Copies of procedures addressing the following: modifications, design changes, set
point changes, equivalency evaluations or suitability analyses, commercial grade
dedications, post-modification testing, 10 CFR 50.59 evaluation and screenings, and
UFSAR updates.
6. Copy of the UFSAR change log (or a synopsis of changes). This should
include all of the changes made to the UFSAR that were incorporated in the last
10 CFR 50.71(e)(4) submittal and any approved changes to the current UFSAR.
If you have questions regarding the information requested, please contact the lead inspector.