March 3, 2008

Mr. Mark B. Bezilla

Site Vice President

FirstEnergy Nuclear Operating Company

Davis-Besse Nuclear Power Station

5501 North State Route 2

Oak Harbor, OH 43449-9760

SUBJECT: DAVIS BESSE NUCLEAR POWER STATION

INFORMATION REQUEST FOR AN NRC INSPECTION ASSOCIATED WITH

CONTAINMENT SUMP 05000346/2008003(DRS)

Dear Mr. Bezilla:

On April 21, 2008, the NRC will begin an inspection at the Davis Besse Nuclear Power Station.

One inspector will perform this 1-week inspection in accordance with NRC Temporary

Instruction (TI) 2525/166, Pressurized Water Reactor Containment Sump Blockage. This

inspection focuses on commitments made by Davis Besse Nuclear Power Station in response

to Generic Letter (GL) 2004-02, Potential Impact of Debris Blockage on Emergency Sump

Recirculation at Pressurized Water Reactors (PWRs).

In order to minimize the inspection impact on the site and to ensure a productive inspection for

both parties, we have enclosed a request for documents needed for the inspection. These

documents have been divided into two groups. The first group is required prior to the inspection

to ensure that the inspector is adequately prepared. This information should be provided to the

Regional Office no later than April 14, 2008.

The second group of requested documents contains additional items that the inspector will

review, or need access to, during the inspection, and should be available by the first day of the

on-site inspection. It is important that all of these documents are up to date and complete in

order to minimize the number of additional documents requested during the preparation and/or

the on-site portions of the inspection.

The inspector for this inspection is Mr. Gerard ODwyer. If there are any questions about the

inspection or the material requested, please contact the inspector at (630) 829-9624 or via e-

mail at GFO@nrc.gov.

M. Bezilla -2-

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and

its enclosure will be available electronically for public inspection in the NRC Public Document

Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide

Documents Access and Management System (ADAMS), accessible from the NRC Web site at

http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Ann Marie Stone, Chief

Engineering Branch 2

Division of Reactor Safety

Docket Nos. 50-346

License Nos. NPF-3

Enclosure: INFORMATION REQUEST FOR GENERIC NUCLEAR POWER PLANT

TEMPORARY INSTRUCTION (TI) 2525/166 INSPECTION

cc w/encl: The Honorable Dennis Kucinich

J. Hagan, President and Chief

Nuclear Officer - FENOC

J. Lash, Senior Vice President of

Operations and Chief Operating Officer - FENOC

Manager - Site Regulatory Compliance - FENOC

D. Pace, Senior Vice President of

Fleet Engineering - FENOC

J. Rinckel, Vice President, Fleet Oversight - FENOC

D. Jenkins, Attorney, FirstEnergy Corp.

Director, Fleet Regulatory Affairs - FENOC

Manager - Fleet Licensing - FENOC

C. OClaire, Chief, Ohio Emergency Management Agency

R. Owen, Administrator, Ohio Department of Health

Public Utilities Commission of Ohio

President, Lucas County Board of Commissioners

President, Ottawa County Board of Commissioners

M. Bezilla -2-

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and

its enclosure will be available electronically for public inspection in the NRC Public Document

Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide

Documents Access and Management System (ADAMS), accessible from the NRC Web site at

http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

Ann Marie Stone, Chief

Engineering Branch 2

Division of Reactor Safety

Docket Nos. 50-346

License Nos. NPF-3

Enclosure: INFORMATION REQUEST FOR GENERIC NUCLEAR POWER PLANT

TEMPORARY INSTRUCTION (TI) 2525/166 INSPECTION

cc w/encl: The Honorable Dennis Kucinich

J. Hagan, President and Chief

Nuclear Officer - FENOC

J. Lash, Senior Vice President of

Operations and Chief Operating Officer - FENOC

Manager - Site Regulatory Compliance - FENOC

D. Pace, Senior Vice President of

Fleet Engineering - FENOC

J. Rinckel, Vice President, Fleet Oversight - FENOC

D. Jenkins, Attorney, FirstEnergy Corp.

Director, Fleet Regulatory Affairs - FENOC

Manager - Fleet Licensing - FENOC

C. OClaire, Chief, Ohio Emergency Management Agency

R. Owen, Administrator, Ohio Department of Health

Public Utilities Commission of Ohio

President, Lucas County Board of Commissioners

President, Ottawa County Board of Commissioners

DOCUMENT NAME: G:\DRS\Work in Progress\Ltr 02__08 DAV-BESSE RFI NAF.doc

Publicly Available Non-Publicly Available Sensitive Non-Sensitive

To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy

OFFICE RIII RIII RIII RIII

NAME GODwyer: ls AMStone

DATE 03/03/08 03/03/08

OFFICIAL RECORD COPY

Letter to Mr. Mark B. Bezilla from Ms. Ann Marie Stone dated March 3, 2008.

SUBJECT: DAVIS BESSE NUCLEAR POWER STATION

INFORMATION REQUEST FOR AN NRC INSPECTION ASSOCIATED WITH

CONTAINMENT SUMP 05000346/2008003(DRS)

DISTRIBUTION:

RAG1

TEB

TJW2

RidsNrrDirsIrib

MAS

KGO

JKH3

JER7

CAA1

DRPIII

DRSIII

PLB1

TXN

ROPreports@nrc.gov

INFORMATION REQUEST FOR GENERIC NUCLEAR POWER PLANT

TEMPORARY INSTRUCTION (TI) 2525/166 INSPECTION

Inspection Report: 05000346/2008003(DRS)

Inspection Dates: April 21, 2008 - April 25, 2008

Inspection Procedures: TI 2525/166, Pressurized Water Reactor Containment Sump

Blockage

IP 71111.17, Changes, Tests, or Experiments, and Permanent

Plant Modifications (reference)

Inspector: Gerard ODwyer, Reactor Engineer

(630) 829-9624 (GFO@nrc.gov)

I. Information Requested for Our In-office Preparation Week

The following information is requested by April 14, 2008, or sooner, to facilitate

inspection preparation. If you have any questions regarding this information, please call

the inspector as soon as possible. (Please provide the information electronically in pdf

files, Excel, or other searchable formats, preferably on CDROM. The CDROM should

contain descriptive names to facilitate ease of use.)

1. A list of all correspondences to and from the site related to GL 2004-02. This list

should include the addressor, addressee, subject matter, and date of

correspondence.

2. A list of modifications, procedure changes or other commitments made in response

to GL 2004-02 as documented in the Item 1 responses. (For the purpose of this

inspection, modifications include permanent plant changes, design changes, set

point changes, equivalency evaluations, suitability analyses, and commercial grade

dedications.)

3. Name(s) and phone numbers for the regulatory and technical contacts.

II. Information Requested to be Available on First Day of Inspection (April 21, 2008)

1. Copies of the modifications and procedure changes made in response to GL 2004-02

or committed to in the documents from Item I. Modification documents should include

a design description, records showing date of completion and 10 CFR 50.59

applicability determination, screening, or evaluation.

1 Enclosure

INFORMATION REQUEST FOR GENERIC NUCLEAR POWER PLANT

TEMPORARY INSTRUCTION (TI) 2525/166 INSPECTION

2. Please ensure that other supporting documents for the selected items have been

located and are readily retrievable as the inspector will likely be requesting these

documents during the inspections. Examples of supporting documents are:

a. Drawings supporting the modifications;

b. Calculations related to the modifications;

c. Procedures affected by the modifications; and

d. UFSAR change papers generated due to a 10 CFR 50.59 evaluation.

3. List of related calculation changes that have been issued for use.

4. List of any related corrective action documents (open and closed).

5. Copies of procedures addressing the following: modifications, design changes, set

point changes, equivalency evaluations or suitability analyses, commercial grade

dedications, post-modification testing, 10 CFR 50.59 evaluation and screenings, and

UFSAR updates.

6. Copy of the UFSAR change log (or a synopsis of changes). This should

include all of the changes made to the UFSAR that were incorporated in the last

10 CFR 50.71(e)(4) submittal and any approved changes to the current UFSAR.

If you have questions regarding the information requested, please contact the lead inspector.

2 Enclosure