From: Ann Marie Stone
NRC/RGN-III/DRS/EB2
To: Pardee C
Exelon Generation Co
References
GL-04-002, IR-08-003
Download: ML080630241 (6)


Text

March 3, 2008 Mr. Charles G. Pardee Chief Nuclear Officer and Senior Vice President Exelon Generation Company, LLC 4300 Winfield Road Warrenville IL 60555

SUBJECT:

BRAIDWOOD STATION INFORMATION REQUEST FOR AN NRC INSPECTION ASSOCIATED WITH CONTAINMENT SUMP 05000456/2008003(DRS); 05000457/2008003(DRS)

Dear Mr. Pardee:

On March 31, 2008, the NRC will begin an inspection at Braidwood Station. One inspector will perform this 1 week inspection in accordance with NRC Temporary Instruction (TI) 2525/166, Pressurized Water Reactor Containment Sump Blockage. This inspection focuses on commitments made by Braidwood Station in response to Generic Letter (GL) 2004-02, Potential Impact of Debris Blockage on Emergency Sump Recirculation at Pressurized Water Reactors (PWRs).

In order to minimize the inspection impact on the site, and to ensure a productive inspection for both parties, we have enclosed a request for documents needed for the inspection. These documents have been divided into two groups. The first group is required prior to the inspection to ensure that the inspector is adequately prepared. This information should be provided to the Regional Office no later than March 24, 2008.

The second group of requested documents contains additional items that the inspector will review, or need access to, during the inspection, and should be available on the first day of the on-site inspection. It is important that all of these documents are up to date and complete in order to minimize the number of additional documents requested during the preparation and/or the on-site portions of the inspection.

The inspector for this inspection is Caroline E. Acosta Acevedo. If there are any questions about the inspection or the materials requested, please contact the inspector at (630) 829-9718 or via e-mail at caroline.acosta@nrc.gov.

C. Pardee In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Ann Marie Stone, Chief Engineering Branch 2 Division of Reactor Safety Docket Nos. 50-456; 50-457 License Nos. NPF-72; NPF-77

Enclosure:

INFORMATION REQUEST FOR GENERIC NUCLEAR POWER PLANT Temporary Instruction (TI) 2525/166 Inspection cc w/encl: Site Vice President - Braidwood Station Plant Manager - Braidwood Station Regulatory Assurance Manager - Braidwood Station Chief Operating Officer and Senior Vice President Senior Vice President - Midwest Operations Senior Vice President - Operations Support Vice President - Licensing and Regulatory Affairs Director - Licensing and Regulatory Affairs Manager Licensing - Braidwood, Byron and LaSalle Associate General Counsel Document Control Desk - Licensing Assistant Attorney General Illinois Emergency Management Agency J. Klinger, State Liaison Officer Chairman, Illinois Commerce Commission

C. Pardee In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely, Ann Marie Stone, Chief Engineering Branch 2 Division of Reactor Safety Docket Nos. 50-456; 50-457 License Nos. NPF-72; NPF-77

Enclosure:

INFORMATION REQUEST FOR GENERIC NUCLEAR POWER PLANT Temporary Instruction (TI) 2525/166 Inspection cc w/encl: Site Vice President - Braidwood Station Plant Manager - Braidwood Station Regulatory Assurance Manager - Braidwood Station Chief Operating Officer and Senior Vice President Senior Vice President - Midwest Operations Senior Vice President - Operations Support Vice President - Licensing and Regulatory Affairs Director - Licensing and Regulatory Affairs Manager Licensing - Braidwood, Byron and LaSalle Associate General Counsel Document Control Desk - Licensing Assistant Attorney General Illinois Emergency Management Agency J. Klinger, State Liaison Officer Chairman, Illinois Commerce Commission DISTRIBUTION See next page DOCUMENT NAME: G:\DRS\Work in Progress\Ltr 02__08 Braidwood RFI NAF.doc 9 Publicly Available 9 Non-Publicly Available 9 Sensitive 9 Non-Sensitive To receive a copy of this document, indicate in the concurrence box C = Copy without attach/encl; E = Copy with attach/encl N = No copy OFFICE RIII RIII RIII RIII NAME CEAcostaAcevedo: ls AMStone DATE 03/03/08 03/03/08 OFFICIAL RECORD COPY

Letter to Mr. Charles G. Pardee from Ms. Ann Marie Stone dated March 3, 2008

SUBJECT:

BRAIDWOOD STATION INFORMATION REQUEST FOR AN NRC INSPECTION ASSOCIATED WITH CONTAINMENT SUMP 05000456/2008003(DRS); 05000457/2008003(DRS)

DISTRIBUTION:

RAG1 TEB MMT RidsNrrDirsIrib MAS KGO JKH3 RML2 SRI Braidwood DRPIII DRSIII CAA1 PLB1 TXN ROPreports@nrc.gov

INFORMATION REQUEST FOR GENERIC NUCLEAR POWER PLANT TEMPORARY INSTRUCTION (TI) 2525/166 INSPECTION Inspection Report: 05000456/2008003(DRS); 0500457/2008003(DRS)

Inspection Dates: March 31, 2008 - April 4, 2008 Inspection Procedures: TI 2525/166, Pressurized Water Reactor Containment Sump Blockage IP 71111.17, Changes, Tests, or Experiments, and Permanent Plant Modifications Inspector: Caroline E Acosta Acevedo, Reactor Engineer (630) 829-9718 (caroline.acosta@nrc.gov)

I. Information Requested for Our In-office Preparation Week The following information is requested by March 24, 2008, or sooner, to facilitate inspection preparation. If you have any questions regarding this information, please call the inspector as soon as possible. (Please provide the information electronically in pdf files, Excel, or other searchable formats, preferably on CDROM. The CDROM should contain descriptive names to facilitate ease of use.)

1. A list of all correspondences to/from the site related to GL 2004-02. This list should include the addressor, addressee, subject matter, and date of correspondence.
2. A list of modifications, procedure changes or other commitments made in response to GL 2004-02 as documented in the Item 1 responses. (For the purpose of this inspection, modifications include permanent plant changes, design changes, set point changes, equivalency evaluations, suitability analyses, and commercial grade dedications.)
3. Name(s) and phone numbers for the regulatory and technical contacts.

II. Information Requested to be Available on First Day of Inspection (March 31, 2008)

1. Copies of the modifications and procedure changes made in response to GL 2004-02 or committed to in the documents from Item I. Modification documents should include a design description, records showing date of completion and 10 CFR 50.59 applicability determination, screening, or evaluation.
2. Please ensure that other supporting documents for the selected items have been located and are readily retrievable, as the inspector will likely be requesting these documents during the inspections. Examples of supporting documents are:

1 ENCLOSURE

INFORMATION REQUEST FOR GENERIC NUCLEAR POWER PLANT TEMPORARY INSTRUCTION (TI) 2525/166 INSPECTION

a. Drawings supporting the modifications;
b. Calculations related to the modifications;
c. Procedures affected by the modifications; and
d. UFSAR change papers generated due to a 10 CFR 50.59 evaluation.
3. List of related calculation changes that have been issued for use.
4. List of any related corrective action documents (open and closed).
5. Copies of procedures addressing the following: modifications, design changes, set point changes, equivalency evaluations or suitability analyses, commercial grade dedications, post-modification testing, 10 CFR 50.59 evaluation and screenings, and UFSAR updates.
6. Copy of the UFSAR change log (or a synopsis of changes). This should include all of the changes made to the UFSAR that were incorporated in the last 10 CFR 50.71(e)(4) submittal and any approved changes to the current UFSAR.

If you have questions regarding the information requested, please contact the lead inspector.