MONTHYEARIR 05000305/20240022024-08-22022 August 2024 NRC Inspection Report 05000305/2024002 IR 05000305/20240012024-05-0202 May 2024 NRC Inspection Report No. 05000305/2024001 IR 05000305/20230022023-12-27027 December 2023 NRC Inspection Report 05000305/2023002 (Drss); 07200064/2023001 (Drss) IR 05000305/20230012023-08-17017 August 2023 NRC Inspection Report No. 05000305/2023001-Kewaunee Power Station IR 05000305/20220022023-01-0303 January 2023 NRC Inspection Report Nos. 05000305/2022002(DRSS) – Kewaunee Power Station IR 05000305/20220012022-08-0101 August 2022 NRC Inspection Report Nos. 05000305/2022001(DNMS) - Kewaunee Power Station IR 05000305/20210012021-12-27027 December 2021 NRC Inspection Report Nos. 05000305/2021001 (Dnms); 07200064/2021001 (DNMS) IR 07200064/20214012021-04-30030 April 2021 Decomissioning Power Station - Independent Spent Fuel Storage Installation Security Inspection Report 07200064/2021401 IR 05000305/20200012021-01-0707 January 2021 NRC Inspection Report No. 05000305/2020001(DNMS) Kewaunee Power Station IR 05000305/20020062020-05-12012 May 2020 Final ASP Analysis - Kewuanee (IR 050003052002006) IR 05000305/20190012020-01-29029 January 2020 NRC Inspection Report Nos. 05000305/2019001 and 07200064/2019001 - Kewaunee Power Station IR 05000305/20180012019-01-15015 January 2019 NRC Inspection Report No. 05000305/2018001(DNMS) - Kewaunee Power Station IR 05000305/20184012018-05-10010 May 2018 (Permanently Shutdown) Independent Spent Fuel Storage Installation - Security Inspection Report 05000305/2018401; 07200064/2018401 (DRS-E.Bonano) IR 05000305/20170022018-02-20020 February 2018 NRC Inspection Report No. 05000305/2017002(DNMS) - Kewaunee Power Station IR 05000305/20170012017-07-21021 July 2017 NRC Inspection Report Nos. 05000305/2017001(DNMS) and 07200064/2017001 IR 05000305/20164012017-01-19019 January 2017 (Permanently Shut Down) - NRC Security Inspection Report 05000305/2016401 (Dnms); 07200064/2016401 (DNMS) IR 05000305/20160012017-01-17017 January 2017 NRC Inspection Report 05000305/2016001 (Dnms); 07200064/2016001, Kewaunee Power Station IR 05000305/20150042016-08-19019 August 2016 NRC Inspection Report 05000305/2015004 (Dnms); 07200064/2015002 (Dnms), October 27, 2015, Through August 10, 2016 IR 05000305/20150032016-02-0808 February 2016 NRC Inspection Report 05000305/2015003 (DNMS) and 07200064/2015001(DNMS) Kewaunee Power Station IR 05000305/20154012016-01-15015 January 2016 Re-Issued Kewaunee Power Station (Permanently Shut Down) - NRC Security Inspection Report Nos. 05000305/2015401 (DNMS) and 07200064/2015402(DNMS) Cover Letter IR 05000305/20150022015-08-13013 August 2015 IR 05000305/2015002 (Dnms), April 1, 2015, Through June 30, 2015, Kewaunee Power Station IR 05000305/20150012015-05-12012 May 2015 IR 05000305/2015-001; January 1, 2015 Through March 31, 2015; Kewaunee Power Station, NRC Inspection Report IR 05000305/20144012015-03-31031 March 2015 EA-14-231; Notice of Violation and Proposed Imposition of Civil Penalty - $17,500 - Kewaunee Power Station (Permanently Shut Down); NRC Security Inspection Report Nos. 05000305/2014401(DNMS) and 07200064/2014401(DNMS) (Cover Letter & Enc. 1 IR 05000305/20140042015-02-0404 February 2015 IR 05000305/2014004(DNMS)Kewaunee Power Station IR 05000305/20140032014-11-13013 November 2014 IR 05000305/2014003 (DNMS) and 07200064/2014001 (Dnms), 07/01/2014 Through 09/30/2014, Kewaunee Power Station IR 05000305/20140022014-09-16016 September 2014 IR 05000305/2014002 (Dnms), April 1, 2014 Through June 30, 2014, Kewaunee Power Station IR 05000305/20140012014-04-24024 April 2014 NRC Inspection Report No. 05000305-14-001(DNMS) - Kewaunee Power Station IR 05000305/20130112014-03-10010 March 2014 IR 05000305-13-011, on 12/31/2014, Kewaunee Power Station, NRC Inspection Report IR 05000305/20132012014-01-24024 January 2014 IR 05000305-13-201; 12/10/2013 - 12/11/2013; Kewaunee Power Station; Target Set Inspection (Cover Letter) IR 05000305/20130102014-01-23023 January 2014 IR 05000305-13-010 on 10/28/2013 - 12/16/2013; Kewaunee Power Station; Emergency Preparedness Biennial Exercise Inspection IR 05000305/20135042013-11-0707 November 2013 Kewaunne Power Station, Response to NRC Inspection Report 05000305-13-504 Request IR 05000305/20130042013-10-31031 October 2013 IR 05000305-13-004 & 05000305-13-009; 06/01/2013 - 09/30/2013; Kewaunee Power Station IR 05000305/20130032013-07-12012 July 2013 IR 05000305-13-003; 04/01/2013 - 05/31/203; Kewaunee Power Station, NRC Integrated Inspection IR 05000305/20134052013-07-10010 July 2013 IR 05000305-13-405; 06/03/2013 - 06/07/2013; Kewaunee Power Station; Routine Security Inspection (Cover Letter Only) IR 05000305/20130022013-05-14014 May 2013 IR 05000305-13-002, on 01/01/2013 - 03/31/2013, Kewaunee Power Station (Kps); Equipment Alignment, Maintenance Risk Assessments and Emergent Work Control, and Identification and Resolution of Problems IR 05000305/20134032013-05-0303 May 2013 IR 05000305-13-403, on 04/01/2013 - 04/05/2013, Kewaunee Power Station; Routine Security Baseline Inspection (Cover Letter Only) IR 05000305/20130082013-04-30030 April 2013 EA-12-266; Final Significance Determination of a White Finding with Proposed Followup; Notice of Violation and Proposed Imposition of Civil Penalty - $70,000; NRC Inspection Report No. 05000305/2013008; Kewaunee Power Station/Letter IR 05000305/20130072013-03-0404 March 2013 IR 05000305-13-007, 01/03/2012, Kewaunee Power Station, Preliminary White Finding, and Results of NRC Office of Investigation Report No. 3-012-010 IR 05000305/20120012013-03-0404 March 2013 Annual Assessment Letter for Kewaunee Power Station (Report 05000305/2012001) IR 05000305/20134042013-02-20020 February 2013 IR 05000305-13-404; 01/14/2013 - 01/24/2013; Kewaunee Power Station; Routine Security Baseline Inspection. (Cover Letter Only) IR 05000305/20120052013-02-0808 February 2013 IR 05000305-12-005, 10/01/2012 - 13/31/2012, Kewaunee Power Station; Adverse Weather Protection, Equipment Alignment, and Maintenance of Emergency Preparedness IR 05000305/20125032013-01-24024 January 2013 IR 05000305-12-503; 12/10/2012 - 12/17/2012, Kewaunee Power Station (Kps), Emergency Preparedness Focused Baseline Inspection IR 05000305/20124032013-01-0909 January 2013 NRC Material Control and Accounting Program Inspection Report 05000305/2012403 - Cover Letter Only IR 05000305/20125012013-01-0707 January 2013 IR 05000305-12-501 and 05000305-12-502, on 12/31/2012, for Kewaunee Power Station, NRC Emergency Preparedness Annual Report IR 05000305/20120092012-12-21021 December 2012 IR 05000305-12-009 on 10/01/2012 - 11/02/2012; Kewaunee Power Station; Component Design Bases Inspection (CDBI) IR 05000305/20120042012-11-0505 November 2012 IR 05000305-12-004, 07/01/12 - 09/30/2012, Kewaunee Power Station NRC Integrated Inspection Report IR 05000305/20120082012-11-0101 November 2012 IR 05000305-12-008, 09/10/2012-09/28/012, Kewaunee Power Station, NRC Problem Identification and Resolution IR 05000305/20120032012-08-0909 August 2012 IR 05000305-12-003, 04/01/2012 - 06/30/2012, Kewaunee Power Station; Plant Modifications, Outage Activities, Identification and Resolution of Problems, and Follow Up of Events and Notices of Enforcement Discretion IR 05000305/20124042012-08-0606 August 2012 IR 05000305-12-404(DRS); 07/09/2012 - 07/19/2012, Kewaunee Power Station; Routine Security Baseline Inspection - Cover Letter IR 05000305/20120072012-05-16016 May 2012 IR 05000305-12-007, 04/09/2012 - 04/18/2012, Kewaunee Power Station Post-Approval Site Inspection for License Renewal 2024-08-22
[Table view] Category:Letter
MONTHYEARML24240A1692024-09-18018 September 2024 Cy 2023 Summary of Decommissioning Trust Fund Status IR 05000305/20240022024-08-22022 August 2024 NRC Inspection Report 05000305/2024002 ML24151A6482024-06-0303 June 2024 Changes in Reactor Decommissioning Branch Project Management Assignments for Some Decommissioning Facilities ML24136A1952024-05-14014 May 2024 2023 Annual Radiological Environmental Operating Report ML24130A0022024-05-0909 May 2024 Summary of Facility Changes, Tests and Experiments and Commitment Changes IR 05000305/20240012024-05-0202 May 2024 NRC Inspection Report No. 05000305/2024001 ML24121A2472024-04-29029 April 2024 And Three Mile Island, Unit 2 - 2023 Occupational Radiation Exposure Annual Report ML24101A0422024-04-22022 April 2024 Solutions Inc. – Exemption from Select Requirements of 10 CFR Part 73 ((Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML24106A0492024-04-15015 April 2024 2023 Annual Radioactive Effluent Release Report ML24080A0702024-03-20020 March 2024 Decommissioning Trust Fund Annual Report ML24079A0162024-03-19019 March 2024 Annual Property Insurance Status Report ML24073A2312024-03-13013 March 2024 And Three Mile Island Nuclear Station, Unit 2 - Management Change ML24061A0202024-02-15015 February 2024 (Ksp) ISFSI, Submittal of Security Plan, Training and Qualification Plan and Safeguards Contingency Plan, Revision 6 ML23339A1332024-01-26026 January 2024 Exemption from the Req of 10 CFR Part 50.82(a)(8)(i)(A) to Use the Kewaunee Decommissioning Trust Fund for the Management of Site Restoration Activities IR 05000305/20230022023-12-27027 December 2023 NRC Inspection Report 05000305/2023002 (Drss); 07200064/2023001 (Drss) ML23332A1922023-11-28028 November 2023 Solutions, Inc., Request for Exemptions from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23278A1002023-10-0505 October 2023 Response to Request for Additional Information (RAI) Application for Kewaunee Solutions (Ks) Site Restoration Activities ML23222A1522023-08-29029 August 2023 Letter RAI KPS Exemption Site Restoration Final Repaired IR 05000305/20230012023-08-17017 August 2023 NRC Inspection Report No. 05000305/2023001-Kewaunee Power Station ML23171B0822023-07-0505 July 2023 Letter - Kewaunee Power Station - Issuance of Exemption from Certain Requirements from 10 CFR Part 20, Appendix G, Section Iii.E ML23132A0012023-05-11011 May 2023 2022 Annual Radiological Environmental Operating Report ML23116A2182023-04-26026 April 2023 2022 Annual Radioactive Effluent Release Report ML23089A3042023-03-30030 March 2023 Decommissioning Fund Status Report ML23088A2752023-03-29029 March 2023 Solutions, Inc., Request for Exemption from 10 CFR 20, Appendix G, Section Iii.E ML23093A0312023-03-29029 March 2023 Solutions, Inc., Request for Exemptions from 10 CFR 50.82(a)(8)(i)(A) and 50.75(h)(1)(iv) for Site Restoration Activities ML23087A0292023-03-27027 March 2023 2022 Annual Report of Occupational Radiation Exposure ML23087A0402023-03-27027 March 2023 Annual Property Insurance Status Report ML23066A3232023-03-0707 March 2023 Energysolutions, LLC, Notification of Closing of Transaction ML22361A1022023-02-24024 February 2023 Reactor Decommissioning Branch Project Management Changes for Some Decommissioning Facilities and Establishment of Backup Project Manager for All Decommissioning Facilities ML23024A0122023-01-26026 January 2023 Letter to Energysolutions Transmitting Threshold Determination for Merger/Restructuring IR 05000305/20220022023-01-0303 January 2023 NRC Inspection Report Nos. 05000305/2022002(DRSS) – Kewaunee Power Station ML22292A2302022-11-25025 November 2022 U.S. Nuclear Regulatory Commission’S Analysis of Dominion Energy Kewaunee‘S Decommissioning Funding Status Report for Kewaunee Power Station, Docket No. 50-305 ML22290A0052022-10-13013 October 2022 Resubmittal of Kewaunee Power Station Independent Spent Fuel Storage Installation (ISFSI) Only Emergency Plan (Ioep) and IOEP- Emergency Action Level (EAL) Basis Document, Revision 0KS ML24061A0182022-08-25025 August 2022 (Ksp) ISFSI Submittal of Security Pla11, Training and Qualification Plan and Safeguards Contingency Plan Revision 5 ML22241A0302022-08-25025 August 2022 (Ksp) ISFSI Submittal of Security Plan, Training and Qualification Plan and Safeguards Contingency Plan, Revision 5 IR 05000305/20220012022-08-0101 August 2022 NRC Inspection Report Nos. 05000305/2022001(DNMS) - Kewaunee Power Station ML22215A1512022-07-27027 July 2022 Executed Financial Assurance Instruments for the Kewaunee License Transfer License No. DPR-43 (Docket Nos. 50-305, 72-64) ML22209A1252022-07-26026 July 2022 Amendment No. 11 to Indemnity Agreement No. B-53 for Kewaunee Power Station (KPS) - Signed by Kewaunee Solutions, Inc ML22175A1132022-06-30030 June 2022 Solutions, Inc. - Letter for Review and Acceptance of the Energysolutions, LLC Decommissioning Quality Assurance Program with Enclosure ML22160A5262022-06-28028 June 2022 Letter - KPS - Issuance of Conforming License Amendment Regarding Indirect Transfer of License from DEK, Inc. to Kewaunee Solutions, Inc ML22160A5282022-06-28028 June 2022 Enclosure 2 - Amendment No. 11 to Indemnity Agreement B-53 ML22160A5272022-06-28028 June 2022 Enclosure 1 - Amendment No. 221 to Renewed Facility Operating License No. DPR-43 ML22188A0812022-06-23023 June 2022 ISFSI, Virgil C. Summer Nuclear Station, Unit 1 & ISFSI, North Anna Power Station, Units 1 & 2 & ISFSI, Surry Power Station, Units 1 & 2 & ISFSI - Submission of Revision 32 of the Quality Assurance Topical Report ML22172A2452022-06-22022 June 2022 Notification of Planned Closing Date and Required Regulatory Approvals for the Kewaunee License Transfer Transaction ML22175A0662022-06-17017 June 2022 Designation of Additional Reviewing Official for ISFSI and 10 CFR Part 37 Program Security Background Investigations ML22166A3392022-06-13013 June 2022 Notification of Nuclear Insurance ML22138A2552022-05-10010 May 2022 Submittal of 2021 Annual Radiological Environmental Operating Report ML22158A2112022-05-10010 May 2022 Summary of Facility Changes, Tests and Experiments and Summary of Commitment Changes ML22091A1892022-04-0101 April 2022 Independent Spent Fuel Storage Installation - Annual Radioactive Effluent Release Report ML22108A0352022-04-0101 April 2022 License Transfer to Kewaunee Solutions, Inc 2024-09-18
[Table view] |
Text
March 3, 2008 Mr. David A. Christian President and Chief Nuclear Officer Virginia Electric and Power Company Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711
SUBJECT:
KEWAUNEE POWER STATION REQUEST FOR INFORMATION NRC INSPECTION ASSOCIATED WITH CONTAINMENT SUMP 05000305/2008002(DRS)
Dear Mr. Christian:
On March 24, 2008, the NRC will begin an inspection at the Kewaunee Power Station. One inspector will perform this 1-week inspection in accordance with NRC Temporary Instruction (TI) 2525/166, Pressurized Water Reactor Containment Sump Blockage. This inspection focuses on commitments made by Kewaunee Power Station in response to Generic Letter (GL) 2004-02, Potential Impact of Debris Blockage on Emergency Sump Recirculation at Pressurized Water Reactors (PWRs).
In order to minimize the inspection impact on the site and to ensure a productive inspection for both parties, we have enclosed a request for documents needed for the inspection. These documents have been divided into two groups. The first group is required prior to the inspection to ensure that the inspector is adequately prepared. This information should be provided to the Regional Office no later than March 17, 2008.
The second group of requested documents contains additional items that the inspector will review, or need access to, during the inspection, and should be available by the first day of the on-site inspection. It is important that all of these documents are up to date and complete in order to minimize the number of additional documents requested during the preparation and/or the on-site portions of the inspection.
The inspector for this inspection is Ronald Langstaff. If there are any questions about the inspection or the material requested, please contact the inspector at (630) 829-9747 or via e-mail at RAL4@nrc.gov.
D. Christian In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
Ann Marie Stone, Chief Engineering Branch 2 Division of Reactor Safety Docket Nos. 50-305 License Nos. DPR-43
Enclosure:
INFORMATION REQUEST FOR GENERIC NUCLEAR POWER PLANT TEMPORARY INSTRUCTION (TI) 2525/166 INSPECTION cc w/encl: S. Scace, Site Vice President T. Webb, Director, Nuclear Safety and Licensing C. Funderburk, Director, Nuclear Licensing and Operations Support T. Breene, Manager, Nuclear Licensing L. Cuoco, Esq., Senior Counsel D. Zellner, Chairman, Town of Carlton J. Kitsembel, Public Service Commission of Wisconsin P. Schmidt, State Liaison Officer, State of Wisconsin
D. Christian In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely, Ann Marie Stone, Chief Engineering Branch 2 Division of Reactor Safety Docket Nos. 50-305 License Nos. DPR-43
Enclosure:
INFORMATION REQUEST FOR GENERIC NUCLEAR POWER PLANT TEMPORARY INSTRUCTION (TI) 2525/166 INSPECTION cc w/encl: S. Scace, Site Vice President T. Webb, Director, Nuclear Safety and Licensing C. Funderburk, Director, Nuclear Licensing and Operations Support T. Breene, Manager, Nuclear Licensing L. Cuoco, Esq., Senior Counsel D. Zellner, Chairman, Town of Carlton J. Kitsembel, Public Service Commission of Wisconsin P. Schmidt, State Liaison Officer, State of Wisconsin DISTRIBUTION:
DXC1 TEB PDM RidsNrrDirsIrib MAS KGO JKH3 SXB3 CAA1 DRPIII DRSIII PLB1 TXN ROPreports@nrc.gov DOCUMENT NAME: G:\DRS\Work in Progress\Ltr 02__08 Kewaunee Generic TI RFI NAF.doc 9 Publicly Available 9 Non-Publicly Available 9 Sensitive 9 Non-Sensitive To receive a copy of this document, indicate in the concurrence box C = Copy without attach/encl; E = Copy with attach/encl N = No copy OFFICE RIII RIII RIII RIII NAME RLangstaff: ls AMStone DATE 03/03/08 03/03/08 OFFICIAL RECORD COPY
INFORMATION REQUEST FOR GENERIC NUCLEAR POWER PLANT TEMPORARY INSTRUCTION (TI) 2525/166 INSPECTION Inspection Report: 05000305/2008002(DRS)
Inspection Dates: March 24, 2008 - March 28, 2008 Inspection Procedures: TI 2525/166, Pressurized Water Reactor Containment Sump Blockage IP 71111.17, Changes, Tests, or Experiments, and Permanent Plant Modifications (reference)
Inspector: Ronald Langstaff, Reactor Inspector (630) 829-9747 (RAL4@nrc.gov)
I. Information Requested for Our In-office Preparation Week The following information is requested by March 17, 2008, or sooner, to facilitate inspection preparation. If you have any questions regarding this information, please call the inspector as soon as possible. (Please provide the information electronically in pdf files, Excel, or other searchable formats, preferably on CDROM. The CDROM should contain descriptive names to facilitate ease of use.)
- 1. A list of all correspondences to/from the site related to GL 2004-02. This list should include the addressor, addressee, subject matter, and date of correspondence.
- 2. A list of modifications, procedure changes or other commitments made in response to GL 2004-02 as documented in the Item 1 responses. (For the purpose of this inspection, modifications include permanent plant changes, design changes, set point changes, equivalency evaluations, suitability analyses, and commercial grade dedications.)
- 3. Name(s) and phone numbers for the regulatory and technical contacts.
II. Information Requested to be Available on First Day of Inspection (March 24, 2008)
- 1. Copies of the modifications and procedure changes made in response to GL 2004-02 or committed to in the documents from Item I. Modification documents should include a design description, records showing date of completion and 10 CFR 50.59 applicability determination, screening, or evaluation.
1 Enclosure
INFORMATION REQUEST FOR GENERIC NUCLEAR POWER PLANT TEMPORARY INSTRUCTION (TI) 2525/166 INSPECTION
- 2. Please ensure that other supporting documents for the selected items have been located and are readily retrievable as the inspector will likely be requesting these documents during the inspections. Examples of supporting documents are:
- a. Drawings supporting the modifications;
- b. Calculations related to the modifications;
- c. Procedures affected by the modifications; and
- d. UFSAR change papers generated due to a 10 CFR 50.59 evaluation.
- 3. List of related calculation changes that have been issued for use.
- 4. List of any related corrective action documents (open and closed).
- 5. Copies of procedures addressing the following: modifications, design changes, set point changes, equivalency evaluations or suitability analyses, commercial grade dedications, post-modification testing, 10 CFR 50.59 evaluation and screenings, and UFSAR updates.
- 6. Copy of the UFSAR change log (or a synopsis of changes). This should include all of the changes made to the UFSAR that were incorporated in the last 10 CFR 50.71(e)(4) submittal and any approved changes to the current UFSAR.
If you have questions regarding the information requested, please contact the lead inspector.