ML080530421
| ML080530421 | |
| Person / Time | |
|---|---|
| Site: | Indian Point |
| Issue date: | 02/07/2008 |
| From: | Office of Nuclear Reactor Regulation |
| To: | Division of License Renewal |
| References | |
| Download: ML080530421 (8) | |
Text
From:
Kimberly Green To:
<dtyner@entergy.com>,"MICHAEL D STROUD" <MSTROUD@entergy.com>
Date:
2/7/2008 2:07:30 PM
Subject:
Draft Telecon Summary Response to RAI B.1.8-1 cc:
"Bo Pham" <bo.pham@1993.usna.com>,"John Burke"
<JPB3@nrc.gov>,<IPNonPublicHearingFile@nrc.gov>
Donna and Mike, Attached is the draft telecon summary of 2/7/08 regarding our discussion of the response to RAI B.1.8-1. Please look over and notify me of any discrepancies or inaccuracies.
- Thanks, Kim
Hearing Identifier:
IndianPointUnits2and3NonPublic Email Number:
404 Mail Envelope Properties (47BEFE31.HQGWDO01.OWGWPO04.200.2000008.1.175521.1)
Subject:
Draft Telecon Summary Response to RAI B.1.8-1 Creation Date:
2/7/2008 2:07:30 PM From:
Kimberly Green Created By:
KJG1@nrc.gov Recipients "Bo Pham" <bo.pham@1993.usna.com>
"John Burke" <JPB3@nrc.gov>
<IPNonPublicHearingFile@nrc.gov>
<dtyner@entergy.com>
"MICHAEL D STROUD" <MSTROUD@entergy.com>
Post Office Route OWGWPO04.HQGWDO01 nrc.gov Files Size Date & Time MESSAGE 210 2/7/2008 2:07:30 PM Telecon Summary 02-07-08 Coatings.doc 56320 2/22/2008 4:54:09 PM Options Priority:
Standard Reply Requested:
No Return Notification:
None None Concealed
Subject:
No Security:
Standard
LICENSEE: Entergy Nuclear Operations, Inc.
FACILITY: Indian Point Nuclear Generating Unit Nos. 2 and 3
SUBJECT:
SUMMARY
OF TELEPHONE CONFERENCE CALL HELD ON FEBRUARY 7, 2008, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND ENTERGY NUCLEAR OPERATIONS, INC., CONCERNING RESPONSES TO REQUEST FOR ADDITIONAL INFORMATION PERTAINING TO THE INDIAN POINT NUCLEAR GENERATING UNIT NOS. 2 AND 3, LICENSE RENEWAL APPLICATIONCONTAINMENT COATINGS The U.S. Nuclear Regulatory Commission (NRC or the staff) and representatives of Entergy Nuclear Operations, Inc. held a telephone conference call on February 7, 2008, to obtain clarification on Entergys response to the staffs request for additional information (RAI) concerning the Indian Point Nuclear Generating Unit Nos. 2 and 3, license renewal application.
By letter dated January 4, 2008, Entergy responded to RAI B.1.8-1. The staff requested clarification on the response. The response stated that, The condition of the protective coatings on metal surfaces at IP, other than the containment liner, is monitored by Structures Monitoring Program (SMP). The SMP governs monitoring the condition of structures or components of structures, including the condition of their protective coatings, as required by 10 CFR 50.65, the maintenance rule. However, LRA Section B.1.36 states, Since protective coatings are not relied upon to manage the effects of aging for structures included in the Structures Monitoring Program, the program does not address protective coating monitoring and maintenance. Entergy clarified that the monitoring of coatings is performed as part of its compliance with the Maintenance Rule, and will continue to be monitored as part of that effort.
However, since coatings are not relied upon for managing aging, the Structures Monitoring Aging Management Program does not monitor coatings. Entergy again stated that coatings will continue to be monitored as part of the Maintenance Rule.
The Enclosure provides a listing of the participants.
The applicant had an opportunity to comment on this summary.
Kimberly Green, Safety Project Manager Projects Branch 2 Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-247 and 50-286
Enclosure:
List of Participants cc w/encl: See next page
LICENSEE: Entergy Nuclear Operations, Inc.
FACILITY: Indian Point Nuclear Generating Unit Nos. 2 and 3
SUBJECT:
SUMMARY
OF TELEPHONE CONFERENCE CALL HELD ON FEBRUARY 7, 2008, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND ENTERGY NUCLEAR OPERATIONS, INC., CONCERNING RESPONSES TO REQUEST FOR ADDITIONAL INFORMATION PERTAINING TO THE INDIAN POINT NUCLEAR GENERATING UNIT NOS. 2 AND 3, LICENSE RENEWAL APPLICATIONCONTAINMENT COATINGS The U.S. Nuclear Regulatory Commission (NRC or the staff) and representatives of Entergy Nuclear Operations, Inc. held a telephone conference call on February 7, 2008, to obtain clarification on Entergys response to the staffs request for additional information (RAI) concerning the Indian Point Nuclear Generating Unit Nos. 2 and 3, license renewal application.
By letter dated January 4, 2008, Entergy responded to RAI B.1.8-1. The staff requested clarification on the response. The response stated that, The condition of the protective coatings on metal surfaces at IP, other than the containment liner, is monitored by Structures Monitoring Program (SMP). The SMP governs monitoring the condition of structures or components of structures, including the condition of their protective coatings, as required by 10 CFR 50.65, the maintenance rule. However, LRA Section B.1.36 states, Since protective coatings are not relied upon to manage the effects of aging for structures included in the Structures Monitoring Program, the program does not address protective coating monitoring and maintenance. Entergy clarified that the monitoring of coatings is performed as part of its compliance with the Maintenance Rule, and will continue to be monitored as part of that effort.
However, since coatings are not relied upon for managing aging, the Structures Monitoring Aging Management Program does not monitor coatings. Entergy again stated that coatings will continue to be monitored as part of the Maintenance Rule.
The Enclosure provides a listing of the participants.
The applicant had an opportunity to comment on this summary.
Kimberly Green, Safety Project Manager Projects Branch 2 Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-247 and 50-286
Enclosure:
List of Participants cc w/encl: See next page DISTRIBUTION: See next page
G:\\ADRO\\DLR\\RPB2\\Indian Point\\Safety Review\\Telecon Summaries\\Telecon Summary 02-XX-08 BOP FP and Nickel Alloy.doc OFFICE LA:DLR PM:RPB2:DLR BC:RPB2:DLR NAME KGreen RFranovich DATE 02/ /08 02/ /08 02/ /08
ENCLOSURE TELEPHONE CONFERENCE CALL INDIAN POINT NUCLEAR GENERATING UNIT NOS. 2 AND 3 LICENSE RENEWAL APPLICATION LIST OF PARTICIPANTS FEBRUARY 7, 2008 PARTICIPANTS AFFILIATIONS Kim Green U.S. Nuclear Regulatory Commission (NRC)
John Burke NRC Mike Stroud Entergy Nuclear Operations, Inc. (Entergy)
Reza Ahrabli Entergy