Individual Notice of Consideration of Issuance of Amendments to Facility Operating License, Proposed No Significant Hazards Consideration Determination, and Opportunity for Hearing Steam Generator Pr
ML080500582
Person / Time
Site: Vogtle  
Issue date: 02/19/2008
From: Siva Lingam
NRC/NRR/ADRO/DORL/LPLII-1
To: Tynan T
Southern Nuclear Operating Co
Lingam, Siva NRR/DORL 415-1564
References
TAC MD7450, TAC MD7451
Download: ML080500582 (3)


Text

February 19, 2008 Mr. Tom E. Tynan Vice President - Vogtle Vogtle Electric Generating Plant 7821 River Road Waynesboro, GA 30830

SUBJECT:

VOGTLE ELECTRIC GENERATING PLANT, UNITS 1 AND 2 - INDIVIDUAL NOTICE OF CONSIDERATION OF ISSUANCE OF AMENDMENTS TO FACILITY OPERATING LICENSE, PROPOSED NO SIGNIFICANT HAZARDS CONSIDERATION DETERMINATION, AND OPPORTUNITY FOR HEARING RE: STEAM GENERATOR PROGRAM (TAC NOS. MD7450 AND MD7451)

Dear Mr. Tynan:

The U.S. Nuclear Regulatory Commission has forwarded the enclosed ANotice of Consideration of Issuance of Amendments to Renewed Facility Operating Licenses, Proposed No Significant Hazards Consideration Determination, and Opportunity for a Hearing,@ to the Office of the Federal Register for publication.

This notice relates to your application dated February 13, 2008, to revise the Vogtle Electric Generating Plant, Units 1 and 2 (Vogtle 1 and 2) Technical Specification (TS) 5.5.9, "Steam Generator (SG) Program, and TS 5.6.10, Steam Generator Tube Inspection Report." For TS 5.5.9, the amendments would replace the existing alternate repair criteria (ARC) in TS 5.5.9.c.1 for SG tube inspections that were approved in Amendment Nos. 146 and 126 issued September 12, 2006, for refueling outage 13 and the subsequent operating cycle for Vogtle 1, and for refueling outage 12 and the subsequent operating cycle for Vogtle 2. The new interim ARC would be for the upcoming refueling outage 14 and the subsequent operating cycle for Vogtle 1; and for the upcoming refueling outage 13 and subsequent 18-month SG tubing eddy current inspection interval and subsequent 36-month SG tubing eddy current inspection interval for Vogtle 2; and would apply to service-induced crack-like flaws found below 17 inches from the top of the tubesheet. For TS 5.6.10, three new reporting requirements are proposed to be added the existing seven requirements.

If you have any questions, please contact me at 301-415-1564 or via e-mail at SPL@nrc.gov.

Sincerely,

/RA/

Siva P. Lingam, Project Manager Plant Licensing Branch II-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-424 and 50-425

Enclosure:

Notice of Consideration cc w/encl: See next page

February 19, 2008 Mr. Tom E. Tynan Vice President - Vogtle Vogtle Electric Generating Plant 7821 River Road Waynesboro, GA 30830

SUBJECT:

VOGTLE ELECTRIC GENERATING PLANT, UNITS 1 AND 2 - INDIVIDUAL NOTICE OF CONSIDERATION OF ISSUANCE OF AMENDMENTS TO FACILITY OPERATING LICENSE, PROPOSED NO SIGNIFICANT HAZARDS CONSIDERATION DETERMINATION, AND OPPORTUNITY FOR HEARING RE: STEAM GENERATOR PROGRAM (TAC NOS. MD7450 AND MD7451)

Dear Mr. Tynan:

The U.S. Nuclear Regulatory Commission has forwarded the enclosed ANotice of Consideration of Issuance of Amendments to Renewed Facility Operating Licenses, Proposed No Significant Hazards Consideration Determination, and Opportunity for a Hearing,@ to the Office of the Federal Register for publication.

This notice relates to your application dated February 13, 2008, to revise the Vogtle Electric Generating Plant, Units 1 and 2 (Vogtle 1 and 2) Technical Specification (TS) 5.5.9, "Steam Generator (SG) Program, and TS 5.6.10, Steam Generator Tube Inspection Report." For TS 5.5.9, the amendments would replace the existing alternate repair criteria (ARC) in TS 5.5.9.c.1 for SG tube inspections that were approved in Amendment Nos. 146 and 126 issued September 12, 2006, for refueling outage 13 and the subsequent operating cycle for Vogtle 1, and for refueling outage 12 and the subsequent operating cycle for Vogtle 2. The new interim ARC would be for the upcoming refueling outage 14 and the subsequent operating cycle for Vogtle 1; and for the upcoming refueling outage 13 and subsequent 18-month SG tubing eddy current inspection interval and subsequent 36-month SG tubing eddy current inspection interval for Vogtle 2; and would apply to service-induced crack-like flaws found below 17 inches from the top of the tubesheet. For TS 5.6.10, three new reporting requirements are proposed to be added the existing seven requirements.

If you have any questions, please contact me at 301-415-1564 or via e-mail at SPL@nrc.gov.

Sincerely,

/RA/

Siva P. Lingam, Project Manager Plant Licensing Branch II-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-424 and 50-425

Enclosure:

Notice of Consideration cc w/encl: See next page DISTRIBUTION:

PUBLIC LPLII-1 R/F RidsAcrsAcnwMailCenter RidsNrrDorlLpl2-1 RidsNrrLAMOBrien RidsNrrPMJDonohew RidsNrrPMSLingam RidsOgcRp RidsRgn2MailCenter(SShaeffer)

RidsNrrDorlLpl2-1 (MWong)

ADAMS Accession Nos.: Ltr: ML080500306 Package: ML080500597 FRN: ML080500306 OFFICE NRR/LPL2-1/PM NRR/LPL2-1/LA NRR/LPL2-1/BC (A)

NAME SLingam MO=Brien MWong DATE 02/19/08 02/19/08 02/19/08 OFFICIAL AGENCY RECORD

Vogtle Electric Generating Plant, Units 1 & 2 cc:

Mr. Tom E. Tynan Vice President - Vogtle Vogtle Electric Generating Plant 7821 River Road Waynesboro, GA 30830 Mr. N. J. Stringfellow Manager, Licensing Southern Nuclear Operating Company, Inc.

P.O. Box 1295 Birmingham, AL 35201-1295 Mr. Jeffrey T. Gasser Executive Vice President Southern Nuclear Operating Company, Inc.

P.O. Box 1295 Birmingham, AL 35201-1295 Mr. Steven M. Jackson Senior Engineer - Power Supply Municipal Electric Authority of Georgia 1470 Riveredge Parkway, NW Atlanta, GA 30328-4684 Mr. Reece McAlister Executive Secretary Georgia Public Service Commission 244 Washington St., SW Atlanta, GA 30334 Mr. Harold Reheis, Director Department of Natural Resources 205 Butler Street, SE, Suite 1252 Atlanta, GA 30334 Attorney General Law Department 132 Judicial Building Atlanta, GA 30334 Mr. Laurence Bergen Oglethorpe Power Corporation 2100 East Exchange Place P.O. Box 1349 Tucker, GA 30085-1349 Arthur H. Domby, Esquire Troutman Sanders Nations Bank Plaza 600 Peachtree Street, NE Suite 5200 Atlanta, GA 30308-2216 Resident Inspector Vogtle Plant 8805 River Road Waynesboro, GA 30830 Office of the County Commissioner Burke County Commission Waynesboro, GA 30830 Mr. Bob Masse Resident Manager Oglethorpe Power Corporation Vogtle Electric Generating Plant 7821 River Road Waynesboro, GA 30830