ML080440259

From kanterella
Jump to navigation Jump to search
Notification That Effective February 1, 2008 Reactor Administrator for the USGS Triga Facility Has Been Transferred from Dr. Warren Day to Dr. Tamara Dickinson
ML080440259
Person / Time
Site: U.S. Geological Survey
Issue date: 02/05/2008
From: Day W
US Dept of Interior, Geological Survey (USGS)
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML080440259 (1)


Text

, ;:**. '! ,. 'science fora changing woldd Department of the Interior

.'.U,-... ib US ological Survey

~. Box25046MSý-974C

"- De ve'r 0 0O,802 * "" '*;*. ....... . j,'

  • ... - Februar 66- 52008 . ..

Re: Docket 50'-274:

License R'11-3:

U.S. Nuclear Regulatory Commission Document Control Room Washington DC 20555 sirs:

The position of Reactor Administrator for the USGS TRIGA facility has been transferred from Dr. Warren Day to Dr. Tamara Dickinson effective. February 1, 2008. A realignment of research facilities within the U.S. Geo-glical Survey (USGS) on that date transferred administrative control of the TRIGA facility from the Central Region to USGS Headquarters in Reston, VA. Dr. Dickitný6o:'is!the' Pr'ogram Coordinator for the USGS National Data Preservation Program; lnformatiesi,'.aind Laboratories. Please address all future correspondence for the Reator Administrator'to her. The mailing address and contact information for Dr. Dickin'son'r-e given, belowIi.'ý Tamara Dickinson

-.12201 Sunrise Valley Dr., MS 911 Reston, VA 20192 Office: (703) 648-6603 Blackberry: (703) 226-9814 Email: tdickinson@usgs.gov Sincerely, Warren Day USGS Reactor Administrator Copy to:

Tamara Dickinson, Reston MS 911 Tim DeBey,' MS 974 A 02-0 A1d~$~

A 02.-C