Dominion Resources Services, Inc.
~()()() [)orninion Boulevard, Glen Allen. VA ")()(),,
\\Vd, i\\ddress: www.dorn.com February 11, 2008 United States Nuclear Regulatory Commission Attention: Document Control Desk Washington, D. C. 20555-0001 DOMINION ENERGY KEWAUNEE, INC.
DOMINION NUCLEAR CONNECTICUT, INC.
VIRGINIA ELECTRIC AND POWER COMPANY KEWAUNEE POWER STATION UNIT 1 MILLSTONE POWER STATION UNITS 1, 2 AND 3 SURRY POWER STATION UNITS 1 AND 2 NORTH ANNA POWER STATION UNITS 1 AND 2 FITNESS-FOR-DUTY PROGRAM SEMI-ANNUAL PERFORMANCE DATA REPORT Serial No.
NLOS/vlh Docket Nos.
License Nos.
08-0060 50-305 50-245/336/423 50-280/281 50-338/339 DPR-43 DPR-21/65 NPF-49 DPR-32/37 NPF-4/7 Enclosed is the Dominion Energy
- Kewaunee, Inc.
(DEK),
Dominion Nuclear Connecticut, Inc. (DNC) and Virginia Electric and Power Company (Dominion) Semi-Annual Fitness-For-Duty (FFD) Program Performance Data report for July 1, 2007 through December 31, 2007. This report is submitted pursuant to 10 CFR 26.71 (d).
Attachment 1
includes summaries of management sanctions
- imposed, actions completed to improve the program, events reported to the NRC, and our random testing rate. contains the standard FFD data forms for Innsbrook Technical Center (Corporate), Kewaunee Power Station, Millstone Power Station, North Anna Power Station, Surry Power Station, Westinghouse Electric Company and Institute of Nuclear Power Operations (INPO).
Serial No. 08-0060 Semi-Annual FFD Report page 2 of 3 If you have any questions, please contact Mr. Dave Sommers at (804) 273-2823.
Very truly yours,
(:;;<'>: /7---...
\\,
- c. L. Funderburk, Director Nuclear Licensing and Operations Support Dominion Resources Services, Inc. for Dominion Energy Kewaunee, Inc.,
Dominion Nuclear Connecticut, Inc., and Virginia Electric and Power Company Enclosure Commitments made in this letter: None cc:
U. S. Nuclear Regulatory Commission Attn: Regional Administrator Region I 475 Allendale Road King of Prussia, PA 19406-1415 U. S. Nuclear Regulatory Commission Attn: Regional Administrator Region II Sam Nunn Atlanta Federal Center 61 Forsyth Street, S.W.
Suite 23T85 Atlanta, GA 30303-8931 U. S. Nuclear Regulatory Commission Attn: Regional Administrator Region III 2443 Warrenville Road Suite 210 Lisle, Illinois 60532-4352
cc:
Mr. R. A. Jervey U. S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Rockville, MD 20852-2738 Ms. C. J. Sanders U. S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Rockville, MD 20852-2738 Mr. S. P. Lingam U. S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Rockville, MD 20852-2738 Mr. P. D. Milano U. S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Rockville, MD 20852-2738 Mr. J. B. Hickman U. S. Nuclear Regulatory Commission Two White Flint North 11545 Rockville Pike Rockville, MD 20852-2738 NRC Senior Resident Inspector Kewaunee Power Station NRC Senior Resident Inspector Millstone Power Station NRC Senior Resident Inspector Surry Power Station NRC Senior Resident Inspector North Anna Power Station Serial No. 08-0060 Semi-Annual FFD Report page 3 of 3
ATTACHMENT 1
SUMMARY
OF EVENTS AND MANAGEMENT ACTIONS Serial No. 08-0060 Semi-Annual FFD Report Page 1 of6
Serial No. 08-0060 Semi-Annual FFD Report Page 2 of6
SUMMARY
OF MANAGEMENT SANCTIONS IMPOSED JULY 1 THROUGH DECEMBER 31, 2007 DOMINION EMPLOYEES RANDOM TESTS (Resulted in suspension of unescorted access authorization, referral to EAP for treatment, and placement in follow-up testing program.)
Confirmed positive for alcohol Confirmed positive test for illegal drug FOR-CAUSE TESTS (Resulted in suspension of unescorted access authorization, referral to EAP for treatment, and placement in follow-up testing program.)
Confirmed positive test for alcohol PRE-ACCESS TESTS (Resulted in denial of unescorted access authorization) This was an Individual tested as a perspective new employee.
Confirmed positive test for illegal drug CONTRACTOR EMPLOYEES RANDOM TESTS (Resulted in denial of unescorted access authorization.)
Confirmed positive test for illegal drug 1
2 1
1 2
RE-ACCESS TESTS (Resulted in denial of unescorted access authorization.)
Confirmed positive test for illegal drug Failure to cooperate / Refusal to test Serial No. 08-0060 Semi-Annual FFD Report Page 3 of6 18 1
Serial No. 08-0060 Semi-Annual FFD Report Page 4 of6
SUMMARY
OF MANAGEMENT ACTIONS COMPLETED TO IMPROVE THE FFD PROGRAM JULY 1 THROUGH DECEMBER 31,2007 No significant changes were made to the Fitness for Duty Program during this reporting period.
Serial No. 08-0060 Semi-Annual FFD Report Page 5 of6
SUMMARY
OF EVENTS REPORTED TO THE NRC BY DOMINION JULY 1 THROUGH DECEMBER 31, 2007 No events were reported to the NRC during this reporting period
Serial No. 08-0060 Semi-Annual FFD Report Page 6 of6 DOMINION RANDOM TESTING RATE JULY 1 THROUGH DECEMBER 31, 2007 Dominion Random Testing Rate:
26.43%
Employees Contractors Innsbrook Technical Center 28.25%
30.77%
Kewaunee Power Station 26.70%
26.67%
Millstone Power Station 25.95%
25.05%
North Anna Power Station 26.43%
27.97%
Surry Power Station 25.48%
28.24%
Serial No. 08-0060 Semi-Annual FFD Report ATTACHMENT 2 FFD DATA FORMS INNSBROOK TECHNICAL CENTER KEWAUNEE POWER STATION MILLSTONE POWER STATION NORTH ANNA POWER STATION SURRY POWER STATION WESTINGHOUSE ELECTRIC COMPANY INSTITUTE OF NUCLEAR POWER OPERATIONS
Page: 1 Fitness for Duty Program Performance Data Personnel Subject to 10 CFR 26 Dominion Resources Services, Inc.
Between Jul 1, 2007 and Dec 31, 2007 INNSBROOK Report Period Date: 02/11/2008 Time: 11 :44 AM 50115 300/150 300/300 Cutoffs: Screen 1Confirmation (ng/ml)
Marijuana Cocaine Opiates Testing Results Average Number with Unescorted Access Categories FOLLOW-UP FOR-CAUSE OBSERVED BEHAVIOR FOR-CAUSE POST EVENT OTHER PRE-ACCESS PRE-ACCESS RANDOM RANDOM FFD RETURN TO DUTY Total Appendix A to 10 CFR 26 Amphetamines 1000/500 Phencyclidine 25/25 Alcohol (%BAC) 0.04%10.04%
Licensee Employees Contractor Personnel 400 26 Number DHHS/NRC Number DHHS/NRC Tested Positive Tested Positive 15 0
0 0
0 0
0 0
0 0
0 0
6 0
1 0
44 0
13 0
0 0
0 0
113 0
8 0
0 0
a a
178 0
22 0
Breakdown of Confirmed Positive Tests for Specific Page: 2 Substances INNSBROOK Between Jul 1, 2007 and Dec 31, 2007 ALCOHOL AMPHETAMINE COCAINE MARIJUANA OPIATES PHENCYCLIDINE REFUSAL Contractor 0
0 0
0 0
0 0
Employee 0
0 0
0 0
0 0
Total 0
0 0
0 0
0 0
Breakdown of Confirmed Positive Tests for Marijuana (initial screen cut-off level =50 ng/ml)
>=50 nglml <100 nglml
>=100 nglml Contractor Employee Total o
o o
a a
o
Page: 3 Fitness for Duty Program Performance Data Personnel Subject to 10 CFR 26 Dominion Energy Kewaunee Between Jul 1, 2007 and Dec 31, 2007 KEWAUNEE Report Period Date: 02/11/2008 Time: 11:44 AM Cutoffs: Screen / Confirmation (ng/ml)
Marijuana 100/15 Cocaine 300/150 Opiates 300/300 Testing Results Average Number with Unescorted Access Categories FOLLOW-UP FOR-CAUSE OBSERVED BEHAVIOR FOR-CAUSE POST EVENT OTHER PRE-ACCESS PRE-ACCESS RANDOM RANDOM FFD RETURN TO DUTY Total Appendix A to 10 CFR 26 Amphetamines 1000/500 Phencyclidine 25/25 Alcohol (%BAC) 0.04%/0.04%
Licensee Employees Contractor Personnel 542 389 Number DHHS/NRC Number DHHS/NRC Tested Positive Tested Positive 23 0
24 0
0 0
0 0
7 0
6 0
0 0
0 0
34 0
149 0
1 0
1 0
145 0
104 0
0 0
0 0
210 0
284 0
Breakdown of Confirmed Positive Tests for Specific Page: 4 Substances KEWAUNEE Between Jul 1, 2007 and Dec 31, 2007 ALCOHOL AMPHETAMINE COCAINE MARIJUANA OPIATES PHENCYCLIDINE REFUSAL Contractor 0
0 0
0 0
0 0
Employee 0
0 0
0 0
0 0
Total 0
0 0
0 0
0 0
Breakdown of Confirmed Positive Tests for Marijuana (initial screen cut-off level =100 nglml)
>=50 nglml <100 nglml
>=100 nglml Contractor a
a Employee Total a
o a
o
Page: 5 Date: 02/11/2008 Time: 11:44 AM Fitness for Duty Program Performance Data Personnel Subject to 10 CFR 26 Dominion Nuclear Connecticut, Inc.
Between Jul 1, 2007 and Dec 31, 2007 MILLSTONE Report Period 50/15 300/150 300/300 Cutoffs: Screen / Confirmation (ng/ml)
Marijuana Cocaine Opiates Testing Results Average Number with Unescorted Access Categories FOLLOW-UP FOR-CAUSE OBSERVED BEHAVIOR FOR-CAUSE POST EVENT OTHER PRE-ACCESS PRE-ACCESS RANDOM RANDOM FFD RETURN TO DUTY Total Appendix A to 10 CFR 26 Amphetamines 1000/500 Phencyclidine 25/25 Alcohol (%BAC) 0.04%/0.04%
Licensee Employees Contractor Personnel 1,283 551 Number DHHS/NRC Number DHHS/NRC Tested Positive Tested Positive 42 0
12 0
1 1
0 0
2 0
5 0
0 0
5 0
35 1
231 3
0 0
4 0
333 2
138 1
4 0
0 0
417 4
395 4
Breakdown of Confirmed Positive Tests for Specific Substances ALCOHOL AMPHETAMINE COCAINE MILLSTONE Contractor Employee Total o
o o
o 2
3 Page: 6 Between Jul1, 2007 and Dec 31, 2007 MARIJUANA OPIATES PHENCYCLIDINE REFUSAL 2
0 0
0 2
0 0
0 4
a a
0 Breakdown of Confirmed Positive Tests for Marijuana (initial screen cut-off level =50 nglml)
>=50 nglml <100 nglml
>=100 nglml Contractor 1
Employee Total 2
3 a
Page: 7 Fitness for Duty Program Performance Data Personnel Subject to 10 CFR 26 Virginia Electric and Power Company Between Jul 1, 2007 and Dec 31, 2007 NORTH ANNA Report Period Date: 02/11/2008 Time: 11 :44 AM 50115 300/150 300/300 Cutoffs: Screen I Confirmation (ng/ml)
Marijuana Cocaine Opiates Testing Results Average Number with Unescorted Access Categories FOLLOW-UP FOR-CAUSE OBSERVED BEHAVIOR FOR-CAUSE POST EVENT OTHER PRE-ACCESS PRE-ACCESS RANDOM RANDOM FFD RETURN TO DUTY Total Appendix A to 10 CFR 26 Amphetamines 1000/500 Phencyclidine 25/25 Alcohol (%BAC) 0.04%/0.04%
Licensee Employees Contractor Personnel 999 381 Number DHHS/NRC Number DHHS/NRC Tested Positive Tested Positive 42 0
34 0
1 0
3 0
2 0
7 0
6 0
21 0
52 0
1,022 9
1 0
2 0
264 0
106 1
0 0
0 0
368 0
1,195 10
Breakdown of Confirmed Positive Tests for Specific Page: 8 Substances NORTH ANNA Between Jul 1, 2007 and Dec 31, 2007 ALCOHOL AMPHETAMINE COCAINE MARIJUANA OPIATES PHENCYCLIDINE REFUSAL Contractor 0
0 4
6 0
0 0
Employee 0
0 0
0 0
0 0
Total 0
0 4
6 0
0 0
Breakdown of Confirmed Positive Tests for Marijuana (initial screen cut-off level = 50 nglml)
>=50 ng/ml <100 ng/ml
>=100 ng/ml Contractor 3
3 Employee 0
0 Total 3
3
Page: 9 Fitness for Duty Program Performance Data Personnel Subject to 10 CFR 26 Virginia Electric and Power Company Between Jul 1, 2007 and Dec 31, 2007 SURRY Report Period Date: 02/11/2008 Time: 11 :44 AM 50115 300/150 300/300 Cutoffs: Screen 1Confirmation (ng/ml)
Marijuana Cocaine Opiates Testing Results Average Number with Unescorted Access Categories FOLLOW-UP FOR-CAUSE OBSERVED BEHAVIOR FOR-CAUSE POST EVENT OTHER PRE-ACCESS PRE-ACCESS RANDOM RANDOM FFD RETURN TO DUTY Total Appendix A to 10 CFR 26 Amphetamines 1000/500 Phencyclidine 25/25 Alcohol (%BAC) 0.04%10.04%
Licensee Employees Contractor Personnel 1,032 394 Number DHHS/NRC Number DHHS/NRC Tested Positive Tested Positive 46 0
73 0
3 0
4 0
0 0
2 0
2 0
4 0
83 0
413 7
1 0
21 0
263 1
111 0
1 0
0 0
399 1
628 7
Breakdown of Confirmed Positive Tests for Specific Substances Page: 10 SURRY Between Jul 1, 2007 and Dec 31, 2007 ALCOHOL AMPHETAMINE COCAINE MARIJUANA OPIATES PHENCYCLIDINE REFUSAL Contractor Employee Total o
o o
o 4
o 4
2 o
2 o
o o
o o
o o
Breakdown of Confirmed Positive Tests for Marijuana (initial screen cut-off level = 50 nglml)
>=50 nglml <100 nglml
>=100 nglml Contractor Employee Total o
o o
2 o
2
Mr. Peter A. Marchese Fitness for Duty Administrator f)
E
~ ommlOn nergy Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060
Dear Mr. Marchese:
Institute of Nuclear Power Operations January 7, 2008 Suite 100 700 Galleria Parkway, Sf Atlanta, GA 30339-5957 770-644-8000 FAX 770-644-8549 We are enclosing a copy of the performance data for INPO's Fitness for Duty Program (FFD) for the period of July 2007 through December 2007. It is our understanding that you will include this information with Dominion Energy information and send in to the Nuclear Regulatory Commission (NRC). This will serve as a vehicle for sending INPO's FFD performance data to the NRC.
If you have any questions about the information, call John Nielsen at 770-644-8808 for clarification. Thank you for your assistance in this matter.
Sincerely,
~
p<rfor, Katherine S. Timberlake Manager, HR Services Enclosure
- .Jan PerformanceDataLtr 12-2007 01/07/08 FITNESS-FOR-DUTY PROGRAM Performance Data Personnel Subject to 10CFR 26 Institute ofNuclear Power Operations 12/31/07 COMPANY 6 MONTHS ENDING Atlanta, Georgia LOCATION John Nielsen 770/644-8808 CONTACT NAME PHONE (INCLUDING AREA CODE)
CUTOFFS: SCREEN/CONFIRMATION (ng/ml)
TESTING RATE: 50%
ALCOHOL (% BAC) 0.04%
COCAINE 300/150 PHENCYCLIDINE 25/25 AMPHETAMINES 1000/500 MARIJUANA 100/15 OPIATES 300/300 50/15 TESTING RESULTS PERMANENT EMPLOYEES LOANED EMPLOYEES AVERAGE NUMBER WITH 199.5 64.8 UNESCORTED ACCESS CATEGORIES TESTED POSITIVE TESTED POSITIVE PRE-ACCESS 24 0
33 0
"Tl POST 0
0 0
0 0
- 0 ACCIDENT 0>>
OBSERVED 0
0 0
0 c
(j)
BEHAVIOR m
RANDOM 61 0
15 0
FOLLOW-UP 0
0 0
0 OTHER 0
0 0
0 TOTAL 85 0
48 0
Pa2:e 1 of 2 RANDOM TEST PROGRAM RESULTS INDIVIDUALS 2003 2004 2005 2006 2007 TESTED Number 1
0 1
0 0
0 0
0 0
N/A Positive Number 74 83 78 78 78 78 89 81 Negative 76 N/A
% POSITIVE N/A N/A 1.35%
N/A N/A N/A N/A N/A N/A N/A GRAPH OF 4
% POSITIVE 3
2 1
lllll llii:
111111 11111111111 nillllill[tJlllllljj[
0
~
11111111111 11111 1111 11111111111 11111111111 11111111111 BREAKDOWN OF CONFIRMED POSITIVE TESTS FOR SPECIFIC SUBSTANCES PERMANENT LOANED EMPLOYEES EMPLOYEES TOTAL ALCOHOL 0
0 0
AMPHETAMINES 0
0 0
COCAINE 0
0 0
MARIJUANA 0
0 0
OPIATES 0
0 0
PHENCYCLIDINE 0
0 0
Page 2 of 2
Westinghouse Westinghouse Proprietary Class 2 Westinghouse Electric Company Access Programs Bin 38-ED221 P.O. Box 158 Madison, Pennsylvania 15663 USA William F. Renz Director Nuclear Security & Emergency Preparedness Dominion Generation Innsbrook Technical Center Innsbrook 2-SE Glen Allen, Virginia 23060
Dear Mr. Renz:
Direct tel:
724-722-5721/5718 Direct fax:
724-722-5732 e-mail:
Your ref:
Our ref: S2008-002 January 21,2008 The attached reports regarding the Westinghouse Fitness for Duty Program Performance Data are being supplied to you. These reports represent all the pre-access drug/alcohol testing that was conducted by Westinghouse for personnel requested for unescorted access authorization at Dominion Generation nuclear stations - North Anna, Surry and Kewaunee; and Dom inion Nuclear - Millstone for the second six month reporting period ending on Decem ber 31, 2007.
The average num ber of employees specified in Number 7 of the attac hed forms is the total Westinghouse average populati on having the potenti al for access authorization. Also, as you are aware some Westinghouse employees requesting access authorization may have received pre-access testing conducted by Dominion Generation.
If you have any questions or comments, please call Ms. Vicki Pancurak at 724-722-5718 or me.
Sincerely, (electronic signature)
Peter J. Defilippi Supervisor, Westinghouse Access Programs Enclosures (3)
Customer:
Westinghouse Fitness for Duty Program Performance Data Personnel Subject to 10CFR26 Dominion Generation - North Anna and Surry Power Plants Westinghouse 1
Westinghouse Electric Company LLC 2
December 31, 2007 Company Six months ending 3
P.o. Box 158, BIN 38, Madison, PA 15663 Location 4
Peter J. Defilippi / Victoria R. Pancurak 5
724-722-5721 /5718 Contact Name Phone (include area code) 6 Cutoffs: Screen/Confirmation (ng/ml)
Appendix A to 10CFR26 Marijuana 20/15 Amphetamines 300/300 Barbiturates 300/300 Cocaine 300/150 Phencyclidine 25/25 Benzodiazepines 300/300 Opiates 300/300 Alcohol (% BAC) 0.04%
Methadone 300/300 Methaqualone 300/300 Westinghouse Long-Term Short-Term Testing Results Employees Contractor Personnel Contractor Personnel Average Number with 7
700 0
840 Unescorted Access Categories 8
- Tested
- Positive
- Tested
- Positive
- Tested
- Positive Pre-Access 2
0 0
0 0
0 For Post accident 0
0 0
0 0
0 Cause Observed behavior £ 0
0 0
0 0
0 Random 0
0 0
0 0
0 Follow-up 0
0 a
0 0
a Other a
0 0
0 0
0 Total 2
0 0
0 0
0 Semi-Annual FFD Report-Dominion Generation / North Anna-Surry - 2nd Period 2007 1/21/2008
Breakdown of Confirmed Positive Tests for Specific Substances 9
Amphe-Phency-Refusal Adulterants Marijuana Cocaine Opiates tamines clidine Alcohol to Test 1
2 3
4 Employees 0
0 0
0 0
0 0
0 0
0 0
0 Long-Term Contractors 0
0 0
0 0
0 0
0 0
0 0
0 Short-Term Contractors 0
0 0
0 0
0 0
0 0
0 0
0 TOTAL 0
0 0
0 0
0 0
0 0
0 0
0 o II LEGEND 1 =Barbiturates 2 =Benzodiazepines 3 = Methadone 4 = Methaqualone
£ - These were tests repeated due to specimen suitability (specific gravity and creatinine concentrations) - they were NOT for observed behavior issues.
- - includes "return to work" tests.
Testing anomalies or unusual occurrences: There were no testing anomalies or unusual occurrences noted during this period.
Semi-Annual FFD Report-Dominion Generation 1North Anna-Surry - 2nd Period 2007 1/21/2008
Customer:
Westinghouse Fitness for Duty Program Performance Data Personnel Subject to 10CFR26 Dominion Generation - Kewaunee Power Station Westinghouse 1
Westinghouse Electric Company LLC 2
December 31, 2007 Company Six months ending 3
P.o. Box 158, BIN 38, Madison, PA 15663 Location 4
Peter J. Defilippi / Victoria R. Pancurak 5
724-722-5721/5718 Contact Name Phone (include area code) 6 Cutoffs:
Screen/Confirmation (ng/ml)
Appendix A to 10CFR26 Marijuana 20/15 Amphetamines 300/300 Barbiturates 300/300 Cocaine 300/150 Phencyclidine 25/25 Benzodiazepines 300/300 Opiates 300/300 Alcohol (% BAC) 0.04%
Methadone 300/300 Methaqualone 300/300 Westinghouse Long-Term Short-Term Testing Results Employees Contractor Personnel Contractor Personnel Average Number with 7
700 a
840 Unescorted Access Categories 8
- Tested
- Positive
- Tested
- Positive
- Tested
- Positive Pre-Access a
a a
a a
a For Post accident a
a a
a a
a Cause Observed behavior £ 0
0 0
a a
0 Random 0
0 a
0 0
0 Follow-up 0
a a
a a
a Other a
a a
a a
a Total a
a a
a a
a Semi-Annual FFD Report-Dominion Generation / Kewaunee - 2 nd Period 2007 1/21/2008
Breakdown of Confirmed Positive Tests for Specific Substances 9
Amphe-Phency-Refusal Adulterants Marijuana Cocaine Opiates tamines clidine Alcohol to Test 1
2 3
4 Employees 0
0 0
0 0
0 0
0 0
0 0
0 Long-Term Contractors 0
0 0
0 0
0 0
0 0
0 0
0 Short-Term Contractors 0
0 0
0 0
0 0
0 0
0 0
0 TOTAL 0
0 0
0 0
0 0
0 0
0 0
0 o II LEGEND 1 = Barbiturates 2 = Benzodiazepines 3 = Methadone 4 = Methaqualone
£ - These were tests repeated due to specimen sUitability (specific gravity and creatinine concentrations) - they were NOT for observed behavior issues.
- - includes "return to work" tests.
Testing anomalies or unusual occurrences: There were no testing anomalies or unusual occurrences noted during this period.
Semi-Annual FFD Report-Dominion Generation 1Kewaunee - 2,d Period 2007 1/21/2008
Customer:
Westinghouse Fitness for Duty Program Performance Data Personnel Subject to 10CFR26 Dominion Nuclear Generation - Millstone Power Station Westinghouse 1
Westinghouse Electric Company LLC 2
December 31,2007 Company Six months ending 3
P.O. Box 158, BIN 38, Madison, PA 15663 Location 4
Peter J. Defilippi 1Victoria R. Pancurak 5
724-722-5721 15718 Contact Name Phone (include area code) 6 Cutoffs:
Screen/Confirmation (ng/ml)
Appendix A to 10CFR26 Marijuana 20/15 Amphetamines 300/300 Barbiturates 300/300 Cocaine 300/150 Phencyclidine 25/25 Benzodiazepines 300/300 Opiates 300/300 Alcohol (% BAC) 0.04%
Methadone 300/300 Methaqualone 300/300 Westinghouse Long-Term Short-Term Testing Results Employees Contractor Personnel Contractor Personnel Average Number with 7
700 a
840 Unescorted Access Categories 8
- Tested
- Positive
- Tested
- Positive
- Tested
- Positive Pre-Access a
a a
a a
a For Post accident a
a a
a a
a Cause Observed behavior £ a
a a
a a
a Random a
a a
a a
a Follow-up a
a a
a a
a Other a
a a
a a
a Total a
a a
a a
a Semi-Annual FFD Report-Dominion Generation 1Millstone - 2nd Period 2007 1/21/2008
Breakdown of Confirmed Positive Tests for Specific Substances 9
Amphe-Phency-Refusal Adulterants Marijuana Cocaine Opiates tamines clidine Alcohol to Test 1
2 3
4 EmDlovees 0
0 0
0 0
0 0
0 0
0 0
0 Lona-Term Contractors 0
0 0
0 0
0 0
0 0
0 0
0 Short-Term Contractors 0
0 0
0 0
0 0
0 0
0 0
0 TOTAL 0
0 0
0 0
0 0
0 0
0 0
0 o "
LEGEND 1 =Barbiturates 2 = Benzodiazepines 3 = Methadone 4 = Methaqualone
£ - These were tests repeated due to specimen suitability (specific gravity and creatinine concentrations) - they were NOT for observed behavior issues.
- - includes "return to work" tests.
Testing anomalies or unusual occurrences: There were no testing anomalies or unusual occurrences noted during this period.
Semi-Annual FFD Report-Dominion Generation 1Millstone - 2nd Period 2007 1121/2008