ML080430215

From kanterella
Jump to navigation Jump to search
Acknowledgment of Receipt of Responses Required by Confirmatory Order
ML080430215
Person / Time
Site: Beaver Valley, Davis Besse, Perry
Issue date: 02/20/2008
From: Carpenter C
NRC/OE
To: Hagan J
FirstEnergy Nuclear Operating Co
Starkey D, OE, 415-3456
References
EA-07-199
Download: ML080430215 (3)


Text

February 20, 2008 EA-07-199 Mr. Joseph J. Hagan President and Chief Nuclear Officer FirstEnergy Nuclear Operating Company 76 South Main Street Akron, OH 44308

SUBJECT:

ACKNOWLEDGEMENT OF RECEIPT OF RESPONSES REQUIRED BY CONFIRMATORY ORDER

Dear Mr. Hagan:

This acknowledges receipt of your letter dated December 31, 2007, in which you provided an update on the status of your compliance with the terms of the NRC Confirmatory Order issued to FirstEnergy Nuclear Operating Company (FENOC) on August 15, 2007. Our evaluation of the steps FENOC has taken thus far to implement the Order continues. The NRC will document its evaluation in a series of inspection reports for Davis Besse, Perry, and Beaver Valley during this calendar year.

The NRC will finalize its evaluation after you have completed the second external effectiveness review, required by the Section IV, Paragraph 2 of the order, which is to be completed in January 2009, and will inform you of the results of our final evaluation under separate correspondence.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS),

accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Cynthia A. Carpenter, Director Office of Enforcement Docket Nos. 50-346; 50-440; 50-334; 50-412 License Nos. NPF-3; NPF-58; DPR-66; NPF-73 cc: Attached page

February 20, 2008 EA-07-199 Mr. Joseph J. Hagan President and Chief Nuclear Officer FirstEnergy Nuclear Operating Company 76 South Main Street Akron, OH 44308

SUBJECT:

ACKNOWLEDGEMENT OF RECEIPT OF RESPONSES REQUIRED BY CONFIRMATORY ORDER

Dear Mr. Hagan:

This acknowledges receipt of your letter dated December 31, 2007, in which you provided an update on the status of your compliance with the terms of the NRC Confirmatory Order issued to FirstEnergy Nuclear Operating Company (FENOC) on August 15, 2007. Our evaluation of the steps FENOC has taken thus far to implement the Order continues. The NRC will document its evaluation in a series of inspection reports for Davis Besse, Perry, and Beaver Valley during this calendar year.

The NRC will finalize its evaluation after you have completed the second external effectiveness review, required by the Section IV, Paragraph 2 of the order, which is to be completed in January 2009, and will inform you of the results of our final evaluation under separate correspondence.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS),

accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Cynthia A. Carpenter, Director Office of Enforcement Docket Nos. 50-346; 50-440; 50-334; 50-412 License Nos. NPF-3; NPF-58; DPR-66; NPF-73 cc: Attached page DISTRIBUTION:

ADAMS (PARS)

C. Carpenter, OE S. Magruder, OE N. Hilton, OE D. Starkey, OE D. Holody, RI R. Summers, RI B. Burgess, RIII J. Heck, RIII A. DeFrancisco, RI R. Gibbs, NRR T. Wengert, NRR S. Richards, NRR M. Ashley, NRR R. Correia, NSIR D. Furst, NSIR B. Jones, OGC R. Bellamy, RI Resident Inspectors (Beaver Valley, Davis-Besse, Perry ML080430215 Publicly Available Non-Sensitive OFFICE OE RIII OE:BC OE:DD OE:D NAME DStarkey JHeck NHilton SMagruder CCarpenter DATE 02/12/08 2/14/08 02/19/08 02/19/08 02/20/08 OFFICIAL RECORD COPY

cc: Letter to Joseph J. Hagan, dated: February 20, 2008 J. Lash, Senior Vice President of Operations and Chief Operating Officer Richard Anderson, Vice President, Nuclear Support Mark Bezilla, Site Vice President, Davis-Besse Barry S. Allen, Site Vice President, Perry Manager - Site Regulatory Compliance (Beaver Valley, Davis-Besse, Perry)

D. Pace, Senior Vice President of of Fleet Engineering J. Rinckel, Vice President, Fleet Oversight D. Jenkins, Attorney, FirstEnergy Director, Fleet Regulatory Affairs Manager, Fleet Licensing Ohio State Liaison Officer R. Owen, Administrator, Ohio Department of Health Public Utilities Commission of Ohio President, Lucas County Board of Commissioners President, Ottawa County Board of Commissioners C. OClaire, Chief, Radiological Branch, Ohio Emergency Management Agency Z. Clayton, Ohio Environmental Protection Agency S. Helmer, Bureau of Radiation Protection, Ohio Department of Health Director, Ohio Department of Commerce Chairman, Perry Township Board of Trustees