MONTHYEARML24213A2602024-07-31031 July 2024 Request for Additional Information LAR to Support Implementation of Framatome Gaia Fuel ML24116A0112024-04-25025 April 2024 Acceptance Review Determination for Proposed Alternative Request IR-4-13 Regarding Steam Generator Channel Head Drain Modification ML24115A2622024-04-24024 April 2024 Acceptance Review Determination for Proposed Alternative Request IR-4-14 Regarding Pressurizer and Steam Generator Pressure-Retaining Welds and Full-Penetration Welded Nozzles ML24114A3192024-04-23023 April 2024 Acceptance Review Determination LAR to Extend Inspection Interval for Reactor Coolant Pump Flywheels (TSTF-421) Using the CLIIP ML24113A2502024-04-22022 April 2024 Request for Additional Information (e-mail 4/22/2024) License Renewal Commitment for Aging Management Program of Alloy 600 Components ML24092A1082024-04-0101 April 2024 3R22 RFO ISI Owners Activity Report Extension - NRC Staff Acknowledgement Email (4/1/2024) ML24065A3112024-03-0505 March 2024 Request for Additional Information (Redacted) (03/05/2025 E-mail from R. Guzman to S. Sinha) Framatome Gaia Fuel LOCA LAR ML24058A2322024-02-27027 February 2024 2/27/2024 E-mail from S. Sinha to R. Guzman P-8 Instrument Uncertainty in Support of LAR Framatome Gaia Fuel ML24032A4702024-02-0101 February 2024 Change in Estimated Review Schedule Revision to TS Design Features Section to Remove the Nine Mile Point Unit 3 Nuclear Project, LLC ML24024A2452024-01-24024 January 2024 1/24/2024 E-mail from R.Guzman to S.Sinha - Acknowledgement of Error in SE for Amendment No. 288 - Revision to Applicability Term for RCS Heatup and Cooldown Pressure-Temperature Limitations Figures ML24024A0202024-01-24024 January 2024 Correction to Safety Evaluation Associated Wit Amendment No. 288 - Revision to Applicability Term for RCS Heat-Up and Cooldown Pressure-Temperature Limitations Figures ML23326A0132023-11-22022 November 2023 Acceptance Review Determination LAR to Support Implementation of Framatome Gaia Fuel ML23318A0952023-11-14014 November 2023 Request for Additional Information (E-mail Dated 11/14/2023) LAR to Revise TSs Related to Framatome Gaia Fuel ML23317A0732023-11-13013 November 2023 Acceptance Review Determination - License Amendment Request Modification of TS SR 4.3.6.a ML23297A2312023-10-24024 October 2023 E-mail to File - Summary of September 13, 2023, Meeting with Dominion to Discuss Proposed LAR to Support Cycle Reloads Using Framatome Gaia Fuel ML23265A2302023-09-22022 September 2023 Acceptance Review Determination - License Amendment Request Revision to TS Design Features Section to Remove the Nine Mile Point Unit 3 Nuclear Project, LLC ML23258A0552023-08-31031 August 2023 Setup of Online Reference Portal and Audit Plan for the NRC Staff'S Review of LAR to Use Framatome Small Break and Realistic Large Break LOCA Methodologies (08/31/2023 e-mail) ML23199A2832023-07-18018 July 2023 Request for Additional Information (E-mail Dated 7/18/2023) LAR to Revise the Pressure-Temperature Limits ML23172A0752023-06-21021 June 2023 Acceptance Review Determination LAR to Revise TSs for Reactor Core Safety Limits, Fuel Assemblies, and COLR Related to Framatome Gaia Fuel ML23171B0522023-06-20020 June 2023 NRR E-mail Capture - RAI for Review of Appendix F to DOM-NAF-2-P (Redacted) ML23145A0052023-05-25025 May 2023 Acceptance Review Determination Exemption to Use Framatome Gaia Fuel Assemblies Containing Fuel Rods Fabricated with M5 Fuel Rod Cladding ML23145A0042023-05-25025 May 2023 Acceptance Review Determination LAR to Use Framatome Small Break and Realistic Large Break LOCA Methodologies ML23115A3022023-04-24024 April 2023 4/24/2023 E-mail from R.Guzman to S.Sinha - Acknowledgement of Error in Issuance of Amendments Adoption of TSTF-359, Increase Flexibility in Mode Restraints ML23089A1882023-03-29029 March 2023 Request for Additional Information (E-mail Dated 3/29/2023) Spring 2022 Steam Generator Tube Inspection Report ML23067A2162023-03-0707 March 2023 NRR E-mail Capture - RAI for North Anna, 1 & 2, Surry 1 & 2, Millstone, 2 & 3, Request for Approval of App. F Fleet Report DOM-NAF-2-P, Qual of the Framatome ORFEO-GAIA and ORFEO-NMGRID CHF Correlations in the Dominion VIPRE-D Computer Code ML23038A0152023-02-0707 February 2023 Acceptance Review Determination LAR to Revise the Applicability Term for RCS Heatup and Cooldown Pressure-Temperature Limitations Figures ML23024A1522023-01-24024 January 2023 Acceptance Review Determination LAR to Supplement Burnup Credit of Criticality Safety Analysis ML23018A0352023-01-17017 January 2023 NRR E-mail Capture - Acceptance Review for Fleet Report Re Appendix F of DOM-NAF-2-P (L-2022-LLT-0003) ML22320A5752022-11-16016 November 2022 E-mail to File - Summary of October 18, 2022, Meeting with Dominion to Discuss Requested Actions for Implementing Framatome Gaia Fuel ML22298A2052022-10-25025 October 2022 Acceptance Review Determination for Alternative Request for Extension of Examination Interval for Reactor Pressure Vessel Head Penetration Nozzles ML22292A3212022-10-19019 October 2022 Acceptance Review Determination for Alternative Request for Containment RSS Pump Periodic Verification Testing Program ML22297A1802022-10-0707 October 2022 Email Acknowledgement to Dominion Energy Nuclear Decommissioning Trust Fund Disbursement 30 Day Notification for Millstone Power Station Unit 1: Docket No 50-245 ML22278A0932022-10-0505 October 2022 E-mail to File - Summary of September 7, 2022, Meeting with Dominion to Discuss Proposed Supplement to the Spent Fuel Pool Criticality Safety Analysis (EPID L-2022-LRM-0059 ML22272A0332022-09-29029 September 2022 Memo E-mail to File - Summary of August 29, 2022, Meeting with Dominion to Discuss Proposed Alternative Request Post-peening follow-up Volumetric Exam of RPV Head Penetration Nozzle ML22252A1772022-09-0909 September 2022 Memo E-mail to File - Summary of August 9, 2022, Meeting with Dominion to Discuss Proposed Alternative Reqeust Recirculation Spray Pump Flow Testing (EPID L:2022-LRM-0057) ML22242A0452022-08-23023 August 2022 NRR E-mail Capture - Dominion GL 04-02 Response Draft RAIs (L-2017-LRC-0000) ML22174A3552022-06-23023 June 2022 NRR E-mail Capture - Acceptance Review for Dominion Fleet LAR to Implement TSTF-554 (L-2022-LLA-0078) ML22123A0812022-05-0303 May 2022 Acceptance Review Determination for Proposed LAR for TS Change Applicable to TSTF-359, Increase Flexibility in Mode Restraints ML22069A7192022-03-10010 March 2022 E-mail from R. Guzman to S. Sinha - Millstone Unit 3 Steam Generator Outage Conference Call ML22020A4122022-01-11011 January 2022 1/11/2022 State Consultation E-mail, R. Guzman to J. Semancik Millstone Power Station, Unit 3 Planned Issuance of Amendment to Clarify Shutdown Bank TS and Add Alternate Control Rod Position Monitoring Requirements ML21348A7392021-12-14014 December 2021 E-mail - Acceptance Review Determination Alternative Request IR-4-09 for Use Alternative Brazed Joint Assessment Methodology for Class 3 Moderate Energy Piping ML21347A9412021-12-13013 December 2021 E-mail from R.Guzman to S.Sinha - Acknowledgement of Error in Safety Evaluation for Amendment No. 280 Measurement Uncertainy Recapture Power Uprate ML21334A1922021-11-30030 November 2021 NRR E-mail Capture - Audit Plan for Reactor Core Thermal-Hydraulics Using the VIPRE-D Appendix E Review ML21326A1502021-11-22022 November 2021 NRR E-mail Capture - Acceptance Review for Relocation of Unit Staff Requirements to the QAPD LAR (L-2021-LLA-0195) ML21306A3302021-11-0202 November 2021 NRR E-mail Capture - Acceptance Review for TSTF-569 LAR ML21297A0072021-10-19019 October 2021 E-mail from R. Guzman to S. Sinha - Acknowledgemnt of Error in SE for Millstone Power Station, Unit 3, Amendment No. 279 Addition of Analytical Methodology to the COLR for LBLOCA ML21286A7372021-10-13013 October 2021 Additional Element Included in the Implementation Plan for the Surry Fuel Melt Safety Limit (SL) LAR ML21223A3042021-08-11011 August 2021 Request for Withholding Information from Public Disclosure Proposed LAR to Add an Analytical Methodology to the COLR for a Large Break LOCA ML21200A2562021-07-19019 July 2021 7/19/2021 E-mail Pressurizer Steam Space Line Classification ML21195A2442021-07-13013 July 2021 NRR E-mail Capture - Draft RAI Appendix E to Topical Report DOM-NAF-2 Qualification of the Framatome BWU-I CHF Correlation in the Dominion Energy VIPRE-D Computer Code 2024-07-31
[Table view] |
Text
>>> Joseph Schoppy 01/03/2008 2:32 PM >>>
- Gary, Listed below is a request for support for our upcoming PI&R inspection. Attached is an initial request for information for the inspection. If you have any questions or comments please don't hesitate to reply. In general, Im easier to reach by e-mail. If you youd prefer to talk, just let me know and Ill give you a call.
Bagman Trip I plan to come up for a quick bagman visit sometime during the week of January 21. At this point, I have some flexibility in my schedule during that week. I was thinking of spending Wednesday, January 23, onsite. I would need very little support from your staff (perhaps meet the technical & licensing POCs, refresh my badge, discuss logistics with you, check out our assigned conference room, and pick up any available information). I would like the requested information (see attached) by January 29 so that our team can adequately prepare for this important inspection. I will happily gather any info available during my bagman trip.
Logistics Onsite weeks: 2/11 & 2/25.
Please set up an Entrance for Monday afternoon, 2/11 (approximately 15 minutes) and an Exit for Friday morning, 2/29 (approximately 45 minutes). In addition, Id like to have a daily debrief with you and any other interested members of your staff at a convenient time for you in the morning (approximately 30 minutes or less on 2/12-15 & 2/26-28). Id also like to have a mid-inspection debrief with your interested managers on Friday morning, 2/15 (approximately 30 minutes).
Please have three sets of PPE (safety glasses, ear plugs, hard hats, gloves - if required) delivered to our conference room for our onsite weeks.
Prior to January 29, please provide info on (1) directions to badging, (2) parking, (3) conference room location
& phone numbers, (4) cafeteria hours, and (5) your staffs normal working hours.
Im sure that well need some support for plant walkdowns during the first few days onsite. More to follow on this topic.
Team Composition Joe Schoppy (team leader, NRC Region I, DRS)
Jamie Benjamin (NRC Region I, DRP)
Sammy McCarver (NRC Region I, DRP)*
Jennifer (Bobiak) Tifft (NRC Region I, DRS)*
Please bounce these names off of security access/badging to ensure that everyone is on NRC Region Is Good Guy Letter. Please provide me with a list of exceptions and I will take action to address.
Thank you. I look forward to working with you.
Please acknowledge receipt of this e-mail.
- Regards, Joe
Information Requested:
General:
- 1. Organization charts and phone list (hard copy)
- 2. List of system numbers/designations (hard copy)
- 3. FSAR and TS/TRM, including the bases (electronic copy - CD format preferred)
Corrective Action Program Material:
- 4. Procedures related to the identification and resolution of problems - initiation, evaluation, correction: including root cause evaluations, operability determinations, work requests, engineering requests, fix-it-now, operating experience, employee concerns program, etc. (hard and electronic copy-CD format preferred) 4a. Scheduled date/time/location of all meetings associated with implementation of the corrective action program, such as Condition Report (CR) screening meetings, corrective action review board meetings, etc. (hard and electronic copy-CD format preferred)
- 5. List of all deficiency documents (CRs, WRs, DERs, etc.) since the last PI&R inspection (3/1/06) - in electronic spreadsheet format if possible - include date initiated and closed, significance level, status, title/short description (electronic copy - CD format preferred) 5a. List of CRs generated as a result of identified trends (either by station or department) since 3/1/06. Include a brief description of the trend, how identified (internal or external), when it was identified, and whether the CR is open or closed. (hard copy)
- 6. For all NRC non-cited violations (NCVs) and findings (FINs) issued since the last PI&R inspection (including the PI&R) - hard copy of the associated CR for each NCV/FIN (including all sections and attachments)
- 7. List of open temporary modifications, operability determinations, control room deficiencies and operator workarounds (hard and electronic copy-CD format preferred)
- 8. List of rework and repeat items / maintenance metrics (hard copy) 8a. Copy of engineering metrics, backlog (hard copy)
- 9. Copy of last 2 CAP trend reports and CAP performance indicators used by management (hard copy) 9a. The total number of CRs generated annually and by department going back to 1/1/06 (hard copy)
Operating Experience (OE) Material:
- 10. List of OE issues screened by your OE program (e.g. NRC INs / GLs / Bulletins
/ Part 21 reports/ NSSS vendor reports) since last PI&R (hard copy) 10a. Copy of all LERs initiated since March 1, 2006 (hard copy)
Maintenance Rule Material:
- 11. Risk-ranking of systems (hard copy)
- 12. Maintenance Rule procedure(s) / scoping document identifying risk ranking of SSCs (hard and electronic copy-CD format preferred)
- 13. List of Maintenance Rule (a)(1) systems and list of SSCs that transitioned from (a)(1) to (a)(2) since March 1, 2006 (hard copy) 13a. List of all Maintenance Rule Functional Failure (MPFF) evaluations and repetitive MPFFs since March 1, 2006 (hard copy)
- 14. Copy of the system health reports for the (a)(1) systems (include the history and current status if not in the health report), and copy of the system health report for the top 5 high risk systems (electronic copy-CD format preferred)
Audits and Assessments:
- 15. Copy of all QA reviews and self-assessments of the corrective action program since last PI&R (hard copy)
- 16. Copies of all safety culture survey results and self-assessments since last PI&R (electronic copy-CD format preferred)
- 17. List of all QA audits and self-assessments since last PI&R, list by functional area if possible (operations, engineering, maintenance, etc) (electronic copy-CD format preferred)
- 18. CAP Trend Reports - previous two quarters or last two occurrences (hard and electronic copy-CD format preferred)
- 19. Site-wide Metric Reports - previous two quarters or last two occurrences (hard and electronic copy-CD format preferred)
Miscellaneous:
- 20. Copy of meeting minutes from onsite safety review committee meeting minutes, if applicable, since March 1, 2006 (hard copy)
- 21. Listing of any other document or source that can assist us in assessing the health of your corrective action program.
Mail Envelope Properties (47A0CFFF.560 : 3 : 55758)
Subject:
Fwd: Millstone PI&R inspection Creation Date 01/30/2008 2:29:03 PM From: Joseph Schoppy Created By: JGS@nrc.gov Recipients nrc.gov kp1_po.KP_DO KMT1 (Kelly Toukatly)
Post Office Route kp1_po.KP_DO nrc.gov Files Size Date & Time MESSAGE 4420 01/30/2008 2:29:03 PM NRC info req 010308.doc 28160 01/03/2008 2:32:14 PM Options Expiration Date: None Priority: Standard ReplyRequested: No Return Notification: None Concealed
Subject:
No Security: Standard Junk Mail Handling Evaluation Results Message is not eligible for Junk Mail handling Message is from an internal sender Junk Mail settings when this message was delivered Junk Mail handling disabled by User Junk List is not enabled Junk Mail using personal address books is not enabled Block List is not enabled