ML080280580

From kanterella
Jump to navigation Jump to search
Assignment Report 00173510 CAPR to Revise Procedure and Initiate New Procedure
ML080280580
Person / Time
Site: Byron  Constellation icon.png
Issue date: 10/17/2003
From:
- No Known Affiliation
To:
Office of Nuclear Reactor Regulation
References
FOIA/PA-2008-0046 AR 00173510
Download: ML080280580 (2)


Text

tW

-AR - Assignment Report Page 1 of 2 Go Back Print I New Search IHome Assignment Report Assign #: 47 AR #: 00173510 Aft Fac: Byron Assign Type: RCMT Status: ACC/ASG Priority: CAPR Assigned To: BYRZE Due Date: 01/30/2004 Schedule Ref: Prim Grp: A8830NESTT Original Date: 10/17/2003 Unit Condition: Sec Grp:

Assignment Request Subject/Description: CAPR to revise procedure and initiate new procedure Assignment Completion In Progress Notes: 173510-47 12/19/03 - M.Page - Due date extended to 01/30/04 as approved by the Plant Manager.

Due date extended as approved by Plant Manger (ADB 10/13/03)

CAPRI Action: Revise BVP 800-44 and initiate a new procedure BVP 800-47 for the common header, to include in a step to check AMAG for noise. If noise exists that contaminates the signal, do not use AMAG to establish new correction factors (CFs). Include in the procedure an acceptance criteria for determining if the AMAG signal contains noise that adversely affects the AMAG results.

Responsible Organization: Byron PED (A8830NESTT)

Due Date: 10/17/03 NOTEPer LS-AA-125 (revision 5) Step 4.5.6.1 If the intent of a CA cannot be performed as defined in Action Tracking, the assignee shall review and gain approval for the change with the "CR Owed To's" Senior Manager. If the intent of a CAPR cannot be performed as defined in Action Tracking, the responsible manager shall bring the changed issue back to MRC for review and approval of the change.

If additional CA's are identified, create the CA using the below format.

New CAI:

Description of Corrective Action To Be Taken:

Assignee:

Due Date:

New CA2:

Description of Corrective Action To Be Taken:

Assignee:

Due Date:

  • k http://cccmva0 1:6123/servlet/ReportAssignment?ar=00 17351 0&assign=47&sub= 12/31/2003

-NAR - Assignment Report Page 2 of 2 I . , I New CA3:

Description of Corrective Action To Be Taken:

Assignee:

Due Date:

Completion Notes:

http://cccmva01:6123/servlet/ReportAssignment?ar=00173510&assign=47&sub= 12/31/2003