From: Kimberly Green To: <dtyner@entergy.com>,"MICHAEL D STROUD" <MSTROUD@entergy.com>
Date: 1/16/2008 5:10:58 PM
Subject:
RAI Set 7 Scoping and Screening Methodology cc: "Bo Pham" <BMP@nrc.gov>,<IPNonPublicHearingFile@nrc.gov>
- Donna, The attached RAIs were signed out on January 14, 2008, and will be released in ADAMs soon. Attached for your use is a Word version of the document.
Please let me know if you have any questions.
- Regards, Kim Green U.S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Mail Stop O11 F1 Rockville, Maryland 20852-2738 phone: 301-415-1627 fax: 301-415-3313 email: kjg1@nrc.gov
Hearing Identifier: IndianPointUnits2and3NonPublic Email Number: 371 Mail Envelope Properties (479762F0.HQGWDO01.OWGWPO04.200.2000008.1.167689.1)
Subject:
RAI Set 7 Scoping and Screening Methodology Creation Date: 1/16/2008 5:10:58 PM From: Kimberly Green Created By: KJG1@nrc.gov Recipients "Bo Pham" <BMP@nrc.gov>
<IPNonPublicHearingFile@nrc.gov>
<dtyner@entergy.com>
"MICHAEL D STROUD" <MSTROUD@entergy.com>
Post Office Route OWGWPO04.HQGWDO01 nrc.gov Files Size Date & Time MESSAGE 428 1/16/2008 5:10:58 PM RAI Set 7 - Scoping and Screening Methodology ML080100645.doc 96768 1/23/2008 3:53:20 PM Options Priority: Standard Reply Requested: No Return Notification: None None Concealed
Subject:
No Security: Standard
January 14, 2008 Mr. Michael A. Balduzzi Senior Vice President and COO Entergy Nuclear Operations, Inc.
Regional Operations, NE 440 Hamilton Avenue White Plains, NY 10601
SUBJECT:
REQUEST FOR ADDITIONAL INFORMATION FOR THE REVIEW OF THE INDIAN POINT NUCLEAR GENERATING UNIT NOS. 2 AND 3, LICENSE RENEWAL APPLICATION - SCOPING AND SCREENING METHODOLOGY
Dear Mr. Balduzzi:
By letter dated April 23, 2007, as supplemented by letters dated May 3, 2007, and June 21, 2007, Entergy Nuclear Operations, Inc., submitted an application pursuant to Title 10 of the Code of Federal Regulations Part 54, to renew the operating licenses for Indian Point Nuclear Generating Unit Nos. 2 and 3, for review by the U.S. Nuclear Regulatory Commission (NRC or the staff). The staff is reviewing the information contained in the license renewal application and has identified, in the enclosure, areas where additional information is needed to complete the review. Further requests for additional information may be issued in the future.
Items in the enclosure were discussed with Mr. Robert Walpole, and a mutually agreeable date for the response is within 30 days from the date of this letter. If you have any questions, please contact me at 301-415-1627, or via e-mail KJG1@nrc.gov.
Sincerely,
/RA/
Kimberly Green, Safety Project Manager Projects Branch 2 Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-247 and 50-286
Enclosure:
As stated cc w/encl: See next page
January 14, 2008 Mr. Michael A. Balduzzi Senior Vice President and COO Entergy Nuclear Operations, Inc.
Regional Operations, NE 440 Hamilton Avenue White Plains, NY 10601
SUBJECT:
REQUEST FOR ADDITIONAL INFORMATION FOR THE REVIEW OF THE INDIAN POINT NUCLEAR GENERATING UNIT NOS. 2 AND 3, LICENSE RENEWAL APPLICATION - SCOPING AND SCREENING METHODOLOGY
Dear Mr. Balduzzi:
By letter dated April 23, 2007, as supplemented by letters dated May 3, 2007, and June 21, 2007, Entergy Nuclear Operations, Inc., submitted an application pursuant to Title 10 of the Code of Federal Regulations Part 54, to renew the operating licenses for Indian Point Nuclear Generating Unit Nos. 2 and 3, for review by the U.S. Nuclear Regulatory Commission (NRC or the staff). The staff is reviewing the information contained in the license renewal application and has identified, in the enclosure, areas where additional information is needed to complete the review. Further requests for additional information may be issued in the future.
Items in the enclosure were discussed with Mr. Robert Walpole, and a mutually agreeable date for the response is within 30 days from the date of this letter. If you have any questions, please contact me at 301-415-1627, or via e-mail KJG1@nrc.gov.
Sincerely,
/RA/
Kimberly Green, Safety Project Manager Projects Branch 2 Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-247 and 50-286
Enclosure:
As stated cc w/encl: See next page DISTRIBUTION: See next page ADAMS Accession No.: ML080100645 OFFICE LA/DLR PM/DLR/RPB2 BC/DLR/RPB2 NAME SFigueroa KGreen RFranovich DATE 01/14/08 01/14/08 01/14/08
OFFICIAL RECORD COPY INDIAN POINT NUCLEAR GENERATING UNIT NOS. 2 AND 3 LICENSE RENEWAL APPLICATION (LRA)
REQUEST FOR ADDITIONAL INFORMATION (RAI)
SCOPING AND SCREENING METHODOLOGY RAI 2.1-1 10 CFR 54.4(a)(2) Scoping Criteria for Nonsafety-related SSCs 10 CFR 54.4 (a)(2) requires, in part, that all nonsafety-related systems, structures and components (SSCs) whose failure could prevent the satisfactory accomplishment of any of the functions identified in 10 CFR 54.4(a)(1) are to be included within the scope of license renewal.
(a) The staff noted during the audit that the applicant had included fluid-filled, nonsafety-related pipes located within a safety-related space within the scope of license renewal based on the spaces approach and had also included portions of nonsafety-related piping attached to safety-related SSCs within the scope of license renewal. However, the applicant did not provide sufficient information in the license renewal application nor the implementing procedures to demonstrate that when the fluid-filled pipe was also attached to a safety-related SSC, an additional portion of the pipe, beyond the safety-related space, up to and including an appropriate seismic anchor, equivalent anchor or bounding condition, was also included within the scope of license renewal.
The staff requests that the applicant provide a description of the process used to ensure that fluid-filled, nonsafety-related pipe, attached to safety-related SSCs which exit the safety-related space, was included within the scope of license renewal up to and including an appropriate seismic anchor, equivalent anchor or bounding condition.
(b) During the NRC audit, the staff reviewed the applicants technical evaluation and on-site documentation for nonsafety-related affecting safety-related SSCs which indicated that certain nonsafety-related SSCs potentially affecting safety-related SSCs were not included within the scope of license renewal based on the proximity of the nonsafety-related SSCs to the safety-related SSCs.
The staff requests that the applicant provide the rationale and basis for not including nonsafety-related SSCs in the vicinity of safety-related SSCs within the scope of license renewal based on their proximity to safety-related SSCs. Indicate the extent of condition by providing a description of the nonsafety-related SSCs which were not included within the scope of license renewal based on their proximity to safety-related SSCs and a description of the corresponding safety-related SSCs.
(c) During the NRC audit, the staff reviewed the applicants technical evaluation and on-site documentation for nonsafety-related affecting safety-related SSCs which indicated that certain similar SSCs were included within the scope of license renewal in accordance with the requirements of 10 CFR 54.4(a)(1) for one unit and 10 CFR 54.4(a)(2) for the other unit.
The staff requests that the applicant provide the rationale and basis for including similar SSCs within the scope of license renewal in accordance with the requirements of 10 CFR Enclosure
54.4(a)(1) for one unit and 10 CFR 54.4(a)(2) for the other unit and how the corresponding review of the adjacent or attached nonsafety-related SSCs (for inclusion within the scope of Enclosure
license renewal) was performed for similar systems in the two units. Indicate the extent of condition by providing a description of the SSCs which were included within the scope of license renewal in accordance with 10 CFR 54.4(a)(1) for one unit and 10 CFR 54.4(a)(2) for the other unit and corresponding descriptions of any differences in the review of adjacent or attached nonsafety-related SSCs.
In addressing these issues, indicate if your review concludes that use of the scoping methodology precluded the identification of nonsafety-related SSCs that could interact with safety-related SSCs, and which were not specifically exempted by your current licensing basis, and, therefore, should have been considered within the scope of license renewal. Describe any additional scoping evaluations to be performed to address the 10 CFR 54.4(a)(2) criteria.
As part of your response, list any additional SSCs included within the scope as a result of your efforts related to this RAI; and list those structures and components for which aging management reviews were conducted. For each structure and component, describe the aging management programs, as applicable, to be credited for managing the identified aging effects.
Letter to Michael Balduzzi from Kimberly Green, dated January 14, 2008 DISTRIBUTION:
SUBJECT:
REQUEST FOR ADDITIONAL INFORMATION FOR THE REVIEW OF THE INDIAN POINT NUCLEAR GENERATING UNIT NOS. 2 AND 3, LICENSE RENEWAL APPLICATION - SCOPING AND SCREENING METHODOLOGY HARD COPY:
DLR RF E-MAIL:
PUBLIC RidsNrrDlr RidsNrrDlrRpb1 RidsNrrDlrRpb2 RidsNrrDlrRer1 RidsNrrDlrRer2 RidsNrrDlrRerb RidsNrrDlrRpob RidsNrrDciCvib RidsNrrDciCpnb RidsNrrDraAfpb RidsNrrDraAplb RidsNrrDeEmcb RidsNrrDeEeeb RidsNrrDssSbwb RidsNrrDssSbpb RidsNrrDssScvb RidsOgcMailCenter RFranovich BPham GMeyer, RI KGreen MMcLaughlin, RI JCaverly NMcNamara, RI RAuluck DScrenci, RI OPA KChang NSheehan, RI OPA MKowal BWelling, RI JBoska BRogers STurk, OGC LSubin, OGC BMizuno, OGC SBurnell, OPA DMcIntyre, OPA EDacus, OCA TMensah, OEDO RConte, RI ECobey, RI MCox, RI PCataldo, RI CHott, RI
Indian Point Nuclear Generating Units 2 and 3 cc:
DJackson, RI
Indian Point Nuclear Generating Units 2 and 3 cc:
Mr. Michael R. Kansler Mr. John A. Ventosa President & CEO/CNO GM, Engineering Entergy Nuclear Operations, Inc. Entergy Nuclear Operations, Inc.
1340 Echelon Parkway 440 Hamilton Avenue Jackson, MS 39213 White Plains, NY 10601 Mr. John T. Herron Mr. John F. McCann Senior Vice President Director, Nuclear Safety & Licensing Entergy Nuclear Operations, Inc. Entergy Nuclear Operations, Inc.
1340 Echelon Parkway 440 Hamilton Avenue Jackson, MS 39213 White Plains, NY 10601 Sr. Vice President Ms. Charlene D. Faison Engineering & Technical Services Manager, Licensing Entergy Nuclear Operations, Inc. Entergy Nuclear Operations, Inc.
1340 Echelon Parkway 440 Hamilton Avenue Jackson, MS 39213 White Plains, NY 10601 Mr. Fred R. Dacimo Mr. Ernest J. Harkness Site Vice President Director, Oversight Entergy Nuclear Operations, Inc. Entergy Nuclear Operations, Inc.
Indian Point Energy Center 1340 Echelon Parkway 450 Broadway, GSB Jackson, MS 39213 P.O. Box 249 Buchanan, NY 10511-0249 Mr. Patric W. Conroy Director, Nuclear Safety Assurance Mr. Anthony Vitale - Acting Entergy Nuclear Operations, Inc.
General Manager, Plant Operations Indian Point Energy Center Entergy Nuclear Operations, Inc. 450 Broadway, GSB Indian Point Energy Center P.O. Box 249 450 Broadway Buchanan, NY 10511-0249 P.O. Box 249 Buchanan, NY 10511-0249 Mr. T.R. Jones - Acting Manager, Licensing Mr. Oscar Limpias Entergy Nuclear Operations, Inc.
Vice President Engineering Indian Point Energy Center Entergy Nuclear Operations, Inc. 450 Broadway, GSB 1340 Echelon Parkway P.O. Box 249 Jackson, MS 39213 Buchanana, NY 10511-0249 Mr. Joseph P. DeRoy Mr. William C. Dennis Vice President, Operations Support Assistant General Counsel Entergy Nuclear Operations, Inc. Entergy Nuclear Operations, Inc.
1340 Echelon Parkway 440 Hamilton Avenue Jackson, MS 39213 White Plains, NY 10601
Indian Point Nuclear Generating Units 2 and 3 cc:
Mr. Paul D. Tonko Mayor, Village of Buchanan President and CEO 236 Tate Avenue New York State Energy Research and Buchanan, NY 10511 Development Authority 17 Columbia Circle Mr. Raymond L. Albanese Albany, NY 12203-6399 Four County Coordinator 200 Bradhurst Avenue Mr. John P. Spath Unit 4 Westchester County New York State Energy, Research and Hawthorne, NY 10532 Development Authority 17 Columbia Circle Mr. William DiProfio Albany, NY 12203-6399 PWR SRC Consultant 48 Bear Hill Road Mr. Paul Eddy Newton, NH 03858 New York State Department of Public Service Mr. Garry Randolph 3 Empire State Plaza PWR SRC Consultant Albany, NY 12223-1350 1750 Ben Franklin Drive, 7E Sarasota, FL 34236 Regional Administrator, Region I U.S. Nuclear Regulatory Commission Mr. William T. Russell 475 Allendale Road PWR SRC Consultant King of Prussia, PA 19406 400 Plantation Lane Stevensville, MD 21666-3232 Senior Resident Inspectors Office Indian Point 2 Mr. Jim Riccio U.S. Nuclear Regulatory Commission Greenpeace P.O. Box 59 702 H Street, NW Buchanan, NY 10511 Suite 300 Washington, DC 20001 Senior Resident Inspectors Office Indian Point 3 Mr. Phillip Musegaas U.S. Nuclear Regulatory Commission Riverkeeper, Inc.
P.O. Box 59 828 South Broadway Buchanan, NY 10511 Tarrytown, NY 10591 Mr. Charles Donaldson, Esquire Mr. Mark Jacobs Assistant Attorney General IPSEC New York Department of Law 46 Highland Drive 120 Broadway Garrison, NY 10524 New York, NY 10271
Indian Point Nuclear Generating Units 2 and 3 cc:
Mr. R. M. Waters The Honorable Nita Lowey Technical Specialist Licensing 222 Mamaroneck Avenue, Suite 310 450 Broadway White Plains, NY 10605 P.O. Box 0249 Buchanan, NY 10511-0249 Mr. Sherwood Martinelli 351 Dyckman Peekskill, NY 10566 Ms. Susan Shapiro, Esq.
21 Perlman Drive Spring Valley, NY 10977 John Sipos Assistant Attorney General New York State Department of Law Environmental Protection Bureau The Capitol Albany, NY 12224 Robert Snook Assistant Attorney General Office of the Attorney General State of Connecticut 55 Elm Street P.O. Box 120 Hartford, CT 06141-0120 Ms. Kathryn M. Sutton, Esq.
Morgan, Lewis & Bockius, LLP 1111 Pennsylvania Avenue, NW Washington, DC 20004 Mr. Paul M. Bessette, Esq.
Morgan, Lewis & Bockius, LLP 1111 Pennsylvania Avenue, NW Washington, DC 20004 Mr. Martin J. ONeill, Esq.
Morgan, Lewis & Bockius, LLP 1111 Pennsylvania Avenue, NW Washington, DC 20004