March 11, 2008 LICENSEE: Wolf Creek Nuclear Operating Corporation FACILITY: Wolf Creek Generating Station Nuclear Power Plant

SUBJECT:

SUMMARY

OF TELEPHONE CONFERENCE CALL HELD ON JANUARY 9, 2008, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION STAFF AND WOLF CREEK NUCLEAR OPERATING CORPORATION, RELATED TO THE STATUS OF SAFETY EVALUATION REPORT OPEN ITEMS AND ASSOCIATED COMMITMENTS FOR LICENSE RENEWAL APPLICATION The NRC staff and representatives of Wolf Creek Nuclear Operating Corporation (WCNOC) held a telephone conference call on January 9, 2008, to discuss the status of the SER open items and associated commitments for the Wolf Creek Generating Station Nuclear Power Plant license renewal application. The conference call provides an opportunity for clarification of open items as well as the status of commitments related to the open items. provides a listing of the participants, and Enclosure 2 contains a brief description of the conference call.

The applicant had an opportunity to comment on this summary.

/RA/

Tam Tran, Project Manager License Renewal Project Branch 1 Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-482

Enclosures:

As stated cc w/encls: See next page

ML080230528 OFFICE LA:DLR PM:RPB1:DLR BC:RPB1:DLR NAME SFigueroa TTran LLund DATE 01/30/08 01/24/08 03/11/08 LIST OF PARTICIPANTS FROM THE TELEPHONE CONFERENCE CALL FOR WOLF CREEK GENERATING STATION LICENSE RENEWAL APPLICATION JANUARY 9, 2008 PARTICIPANTS AFFILIATION Tam Tran U.S. Nuclear Regulatory Commission Lorrie Bell Wolf Creek Nuclear Operating Corporation (WCNOC)

Patrick Guevel WCNOC Charlie Medenciy WCNOC Paul Crawley Strategic Teaming and Resource Sharing (STARS)

Tony Harris STARS Philippe Soenen STARS Enclosure 1

WOLF CREEK GENERATING STATION POWER PLANT LICENSE RENEWAL APPLICATION (Brief description of the conference call)

The U.S. Nuclear Regulatory Commission (NRC) staff and representatives of Wolf Creek Nuclear Operating Corporation (WCNOC) held a telephone conference call on January 9, 2008, to discuss and clarify the status of the Safety Evaluation Report (SER) open items and associated commitments. Two of the open items are based on the commitments that the applicant will provide analyses by January 31, 2008, to address the staffs concerns on the adequacy of metal fatigue analyses for the LRA.

Discussion:

During the teleconference call, the staff provided the status of the open items. There are five open items. Two open items (OI 2.5-1 and 3.0.3.1.10-1) are related to Station Blackout. Three open items (OI 4.3-3, 4.3, and 4.3-1) are related to WCNOCs metal fatigue analysis. Of the three open items related to WCNOCs metal fatigue analysis, one may require an audit of assumptions and plant configurations listed in the basis documents (supporting the LRA) to demonstrate the adequacy of the metal fatigue analysis for license renewal. Two remaining open items related to WCNOCs metal fatigue analysis require additional analysis by the applicant, as a commitment, to be available by January 31, 2008.

The applicant inquired about the audit plan for the open item requiring auditing of the metal fatigue analysis assumptions and plant configurations.

The staff clarified that W LTR SAP 07-28 cited in the applicants response to the staffs concern about the adequacy of WCNOCs metal fatigue analysis contains two significant conclusions: (1) mechanical stress is much less than thermal induced stress and (2) usage factor for high-cycle effects was insignificant. The staff may verify and validate the input and assumptions used to develop these conclusions as a part of an audit prior to closure of the open item (scheduled for early 2008).

The applicant inquired about the background of Open Item 4.3-1 relative to the commitment to provide reanalysis by January 31, 2008. To clarify this item, the draft SER language has subsequently been changed to accurately reflect the source of the technical concern of this open item. Further dialog with the applicant for confirmation of clarification of this item is anticipated for the next conference call opportunity.

Enclosure 2

Letter to Wolf Creek from Tam Tran, dated March 11, 2008 DISTRIBUTION:

SUBJECT:

SUMMARY

OF TELEPHONE CONFERENCE CALL HELD ON JANUARY 9, 2008, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION STAFF AND WOLF CREEK NUCLEAR OPERATING CORPORATION (WCNOC),

RELATED TO THE STATUS OF SAFETY EVALUATION REPORT (SER) OPEN ITEMS AND ASSOCIATED COMMITMENTS FOR LICENSE RENEWAL APPLICATION HARD COPY:

DLR RF E-MAIL:

PUBLIC SSmith (srs3)

SDuraiswamy RidsNrrDlr RidsNrrDlrRlra RidsNrrDlrRlrb RidsNrrDlrRlrc RidsNrrDlrReba RidsNrrDlrRebb RidsNrrDci RidsNrrDra RidsNrrDe RidsNrrDeEemb RidsNrrDeEeeb RidsNrrDss RidsOgcMailCenter RidsNrrAdes JDonohew GPick, RIV SCochrum, RIV CLong, RIV

Wolf Creek Generating Station cc:

Jay Silberg, Esq. Supervisor Licensing Pillsbury Winthrop Shaw Pittman, LLP Wolf Creek Nuclear Operating Corporation 2300 N Street, NW PO Box 411 Washington, DC 20037 Burlington, KS 66839 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission Resident Inspectors Office/Callaway Plant 611 Ryan Plaza Drive, Suite 400 8201 NRC Road Arlington, TX 76011-7005 Steedman, MO 65077-1032 Senior Resident Inspector Kevin J. Moles, Manager U.S. Nuclear Regulatory Commission Regulatory Affairs PO Box 311 Wolf Creek Nuclear Operating Corporation Burlington, KS 66839 PO Box 411 Burlington, KS 66839 Chief Engineer, Utilities Division Kansas Corporation Commission Lorrie I. Bell, Project Manager 1500 SW Arrowhead Road Wolf Creek Nuclear Operating Corporation Topeka, KS 66604-4027 PO Box 411 Burlington, KS 66839 Office of the Governor State of Kansas Mr. Gordon A. Clefton Topeka, KS 66612 Nuclear Energy Institute 1776 I Street, NW, Suite 400 Attorney General Washington, DC 20006-3708 120 S.W. 10th Avenue, 2nd Floor Topeka, KS 66612-1597 County Clerk Coffey County Courthouse 110 South 6th Street Burlington, KS 66839 Thomas A. Conley, Section Chief Radiation and Asbestos Control Kansas Department of Health and Environment Bureau of Air and Radiation 1000 SW Jackson, Suite 310 Topeka, KS 66612-1366 Vice President Operations/Plant Manager Wolf Creek Nuclear Operating Corporation PO Box 411 Burlington, KS 66839