ML080180433
| ML080180433 | |
| Person / Time | |
|---|---|
| Site: | Nuclear Energy Institute |
| Issue date: | 01/28/2008 |
| From: | Grobe J NRC/NRR/ADES |
| To: | Marion A Nuclear Energy Institute |
| References | |
| Download: ML080180433 (4) | |
Text
January 28, 2008 Mr. Alexander Marion, Executive Director Nuclear Operations & Engineering Nuclear Energy Institute 1776 I Street, NW, Suite 400 Washington, DC 20006-3708
SUBJECT:
DRAFT REVISION OF DIGITAL INSTRUMENTATION AND CONTROL PROJECT PLAN FOR REVIEW AND COMMENT
Dear Mr. Marion:
The purpose of this letter is to provide you with the draft revision of the U.S. Nuclear Regulatory Commissions (NRCs) Digital Instrumentation and Control (DI&C) Project Plan (Enclosure 1) for review and comment.
The DI&C Project Plan was initially issued on July 12, 2007 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML071900253). The initial draft revision of the project plan was presented at the December 7, 2007 public meeting of the NRCs DI&C Steering Committee. The Nuclear Energy Institute (NEI) provided comments to the initial draft revision on December 21, 2007 via e-mail.
provides the disposition of NEIs previous comments.
This draft revision of the project plan will be discussed at the next public meeting of the NRCs DI&C Steering Committee on February 01, 2008. The Steering Committee looks forward to receiving any comments you may have as it considers final changes to the draft. We expect to issue the project plan early in February.
If you have any questions, please contact me at 301-415-1274.
Sincerely,
/RA/
John A. Grobe, Associate Director Engineering and Safety Systems Office of Nuclear Reactor Regulation
Enclosures:
As stated cc w/enclosures: See next page
January 28, 2008 Mr. Alexander Marion, Executive Director Nuclear Operations & Engineering Nuclear Energy Institute 1776 I Street, NW, Suite 400 Washington, DC 20006-3708
SUBJECT:
DRAFT REVISION OF DIGITAL INSTRUMENTATION AND CONTROL PROJECT PLAN FOR REVIEW AND COMMENT
Dear Mr. Marion:
The purpose of this letter is to provide you with the draft revision of the U.S. Nuclear Regulatory Commissions (NRCs) Digital Instrumentation and Control (DI&C) Project Plan (Enclosure 1) for review and comment.
The DI&C Project Plan was initially issued on July 12, 2007 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML071900253). The initial draft revision of the project plan was presented at the December 7, 2007 public meeting of the NRCs DI&C Steering Committee. The Nuclear Energy Institute (NEI) provided comments to the initial draft revision on December 21, 2007 via e-mail.
provides the disposition of NEIs previous comments.
This draft revision of the project plan will be discussed at the next public meeting of the NRCs DI&C Steering Committee on February 01, 2008. The Steering Committee looks forward to receiving any comments you may have as it considers final changes to the draft. We expect to issue the project plan early in February.
If you have any questions, please contact me at 301-415-1274.
Sincerely,
/RA/
John A. Grobe, Associate Director Engineering and Safety Systems Office of Nuclear Reactor Regulation
Enclosures:
As stated cc w/enclosures: See next page ADAMS ACCESSION NOS.:
Package:
ML080180431 Letter:
ML080180433 ML080180435 :
ML080180436 OFFICE DI&C/PM NRR/DE NRR/ADES NAME JRobinson PHiland JGrobe DATE 01/22/08 01/23/08 01/28/08
LETTER TO NEI: DRAFT REVISION OF DIGITAL INSTRUMENTATION AND CONTROL PROJECT PLAN FOR REVIEW AND COMMENT DISTRIBUTION Email PUBLIC RidsNrrAdro RidsNrrAdes RidsNrrDpr RidsNrrDprPgcb RidsOpaMail RidsNrrDe RidsOgcMailCenter RidsAcrsAcnwMailCenter JGrobe MMayfield JGiitter SMorris JUhle RCroteau JRobinson MGareri IJung MFranovich WKemper MMarshall MJunge TMcGinty DJackson RSydnor DSantos SArndt DHerrmann PHiland DZhang MWaterman SBailey PLoeser PRebstock HGarg DRahn WSchwink External Email See Next Page
Nuclear Energy Institute Project No. 689 cc:
Mr. Alexander Marion, Executive Director of Nuclear Operations Nuclear Energy Institute 1776 I Street, NW, Suite 400 Washington, DC 20006-3708 am@nei.org Mr. James Riley, Director of Engineering Nuclear Energy Institute 1776 I Street, NW, Suite 400 Washington, DC 20006-3708 jhr@nei.org Mr. Gordon Clefton, Senior Project Manager Nuclear Energy Institute 1776 I Street, NW, Suite 400 Washington, DC 20006-3708\\
gac@nei.org Mitch Lucas, (TXU) mlucas3@luminant.com Rick Libra, (DTE)
Rick.Libra@exeloncorp.com Amir Shahkarami, (Exelon)
Amir.Shahkarami@exeloncorp.com Chuck Welty, (EPRI) cwelty@epri.com