Requalification Program Inspection - North Anna Power Station 05000338/2008-02 and 0500339/2008-02
ML080180005
Person / Time
Site: North Anna  Dominion icon.png
Issue date: 01/17/2008
From: Widmann M
NRC/RGN-II/DRS/OLB
To: Christian D
Virginia Electric & Power Co (VEPCO)
References
IR-08-002
Download: ML080180005 (6)


See also: IR 05000338/2008002

Text

January 17, 2008

Virginia Electric and Power Company

ATTN: Mr. David A. Christian

President and Chief Nuclear Officer

Innsbrook Technical Center

5000 Dominion Boulevard

SUBJECT:

REQUALIFICATION PROGRAM INSPECTION - NORTH ANNA POWER

STATION 05000338/2008-02 AND 0500339/2008-02

Dear Mr. Christian:

In a telephone conversation on January 3, 2008, Mr. Edwin Lea, Jr., Senior Operations

Examiner, and Mr. Joseph Scott, Nuclear Training Supervisor, made arrangements to

reschedule the NRCs inspection to inspect the licensed operator requalification program at the

North Anna Power Station. The inspection, which was planned for the week of January 14,

2008, was rescheduled for the week of January 28, 2008. The staff at your facility should

prepare and conduct the requalification examinations in accordance with your NRC-approved

requalification program. It is our understanding that your simulator is committed to ANSI

Standard 3.5, 1998.

In accordance with 10 CFR 55.59, the NRC has requested that you make available the material

as specified in enclosure one, in order to support the NRC's inspection program needs. Mr.

Joseph Scott has been advised of this request and provided with the name and address of the

NRC lead inspector assigned to this inspection.

This letter contains information collections that are subject to the Paperwork Reduction Act of

1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of

Management and Budget, approval number Part 55 (3150-0018), which expires on June 30,

2009.

The public reporting burden for this collection of information is estimated to average 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> per

response, including the time for reviewing instructions, gathering and maintaining the data

needed, and completing and reviewing the collection of information. Send comments on any

aspect of this collection of information, including suggestions for reducing the burden, to the

Information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission,

Washington, DC 20555-0001, or by Internet electronic mail at SLF@NRC.GOV; and to the

Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0101), Office of

Management and Budget, Washington, DC 20503.

The NRC may not conduct or sponsor, and a person is not required to respond to, a collection

of information unless it displays a currently valid OMB approval number.

VEPCO

2

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter

and its enclosure will be available electronically for public inspection in the NRC Public

Document Room or from the Publicly Available Records (PARS) component of NRC's

document system (ADAMS). ADAMS is accessible from the NRC Web site at

http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Thank you for your cooperation in this matter. If you have any questions regarding this

inspection, please contact Edwin Lea at (404) 562-4567 or me at (404) 562-4550.

Sincerely,

/RA/

Malcolm T. Widmann, Chief

Operations Branch

Division of Reactor Safety

Docket Nos. 50-338, 50-339

License Nos. NPF-4, NPF-7

Enclosure: Materials Request List

cc: See Page 3

VEPCO

3

cc w/encl:

Chris L. Funderburk, Director

Nuclear Licensing and

Operations Support

Virginia Electric and Power Company

Electronic Mail Distribution

D. G. Stoddard, Site Vice President

North Anna Power Station

Electronic Mail Distribution

Executive Vice President

Old Dominion Electric Cooperative

Electronic Mail Distribution

County Administrator

Louisa County

P. O. Box 160

Louisa, VA 23093

Lillian M. Cuoco, Esq.

Senior Counsel

Dominion Resources Services, Inc.

Electronic Mail Distribution

Attorney General

Supreme Court Building

900 East Main Street

Richmond, VA 23219

NRC Resident Inspector

U.S. Nuclear Regulatory Commission

P.O. Box 490

Mineral, VA 23117

OFFICE

RII:DRS

RII:DRP

RII:DRS

RIV:DRS

SIGNATUR /RA/

/RA/

/RA/

NAME

MWidmann

E. Guthrie

E. Lea

DATE

1/17/2008

1/17/2008

1/17/2008

E-MAIL

YES

NO YES

NO YES

NO YES

NO

Enclosure

Materials Request List

The items listed below are being requested to support the upcoming IP-71111.11 inspection in

January, 2008, at North Anna Power Station. Please identify the items from Section A, which

you can send electronically to the NRC. Once you have identified those items, please e-mail

them to Mr. Edwin Lea at exl2@nrc.gov. Please have the remaining items identified in Section

A and Section B ready for our review upon arrival on January 28, 2008.

Section A: In-office inspection material:

1.

Exam results since last requal inspection, copies of exam that had pass/failure rates

significantly outside the average.

2.

A copy of the Written Exams to be administered and all biennial re-takes.

3.

List of personnel scheduled for requal testing the weeks of 01/28/2008.

4.

Copies of simulator scenarios for this exam.

5.

Program evaluation for the previous 2 years training cycle.

6. A list of all personnel that reactivated their licenses since the last requal inspection.

7.

Simulator:

List of all open simulator discrepancies (DRs).

Copy of the Simulator Management and Configuration Procedures.

List of all closed simulator DRs for last 12 months.

List of Simulator Performance tests.

Section B: On-site inspection material:

1.

Condition Reports and LERs resulting from human performance errors since the last

requal inspection.

2.

All training feedback forms since the last requal inspection.

3.

All remedial training packages since the last requal inspection.

4.

Security badge and HP printouts for all (selected) personnel that reactivated their

licenses since the last requal inspection.

2

Enclosure

5.

Copies of the reference list for all administrative procedures which direct the training

process, including development of training and test materials, remedial training,

modifications, plant and industry experience.

6.

Records for maintenance of active licenses - time on shift 56/60 hrs/qtr since the last

requal inspection.

7.

All Medical Exam Records with a copy of the individuals licence attached.

8.

Simulator JPMs and in-plant JPMs that have been administered for this requal exam.

9.

Copy of an Organizational Chart for the training department including the simulator

group.

10.

Complete list of all Licensed individuals complete with license restrictions.

11.

Security procedures for the simulator.