January 9, 2008 Mr. G. R. Peterson Vice President McGuire Nuclear Station Duke Power Company LLC 12700 Hagers Ferry Road Huntersville, NC 28078
SUBJECT:
MCGUIRE NUCLEAR STATION, UNIT 2 (MCGUIRE UNIT 2), INSPECTION RESULTS FROM INSPECTIONS PERFORMED IN ACCORDANCE WITH REVISED NRC ORDER (EA-03-009) (TAC NO. MD4665)
Dear Mr. Morris:
The Nuclear Regulatory Commission (NRC) issued a revised Order Modifying Licenses (Effective Immediately) (EA-03-009), dated February 20, 2004, (Order) to establish required inspections of reactor pressure vessel (RPV) heads and associated penetration nozzles at pressurized water reactors. These requirements were necessary to provide reasonable assurance that plant operations did not pose an undue risk to the public health and safety. The requirements of that Order were expected to remain in effect pending long-term resolution of RPV head penetration inspection requirements, which is expected to involve changes to the NRC regulations. For each inspection required in the Order, the licensee shall submit a report detailing the inspection results within sixty (60) days after returning the plant to operation.
By letter dated January 9, 2007, Duke Power Company LLC, (the licensee) submitted the required report summarzing the results of the inspections performed at McGuire Unit 2 during the End-of-Cycle 17 refueling outage. The NRC staff has reviewed the report and finds that you have met the information-submittal requirements of revised ordered EA-03-009.
Sincerely,
/RA/
John Stang, Senior Project Manager Plant Licensing Branch II-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-370 cc: See next page
January 9, 2008 Mr. G. R. Peterson Vice President McGuire Nuclear Station Duke Power Company LLC 12700 Hagers Ferry Road Huntersville, NC 28078
SUBJECT:
MCGUIRE NUCLEAR STATION, UNIT 2 (MCGUIRE UNIT 2), INSPECTION RESULTS FROM INSPECTIONS PERFORMED IN ACCORDANCE WITH REVISED NRC ORDER (EA-03-009) (TAC NO. MD4665)
Dear Mr. Morris:
The Nuclear Regulatory Commission (NRC) issued a revised Order Modifying Licenses (Effective Immediately) (EA-03-009), dated February 20, 2004, (Order) to establish required inspections of reactor pressure vessel (RPV) heads and associated penetration nozzles at pressurized water reactors. These requirements were necessary to provide reasonable assurance that plant operations did not pose an undue risk to the public health and safety. The requirements of that Order were expected to remain in effect pending long-term resolution of RPV head penetration inspection requirements, which is expected to involve changes to the NRC regulations. For each inspection required in the Order, the licensee shall submit a report detailing the inspection results within sixty (60) days after returning the plant to operation.
By letter dated January 9, 2007, Duke Power Company LLC, (the licensee) submitted the required report summarzing the results of the inspections performed at McGuire Unit 2 during the End-of-Cycle 17 refueling outage. The NRC staff has reviewed the report and finds that you have met the information-submittal requirements of revised ordered EA-03-009.
Sincerely,
/RA/
John Stang, Senior Project Manager Plant Licensing Branch II-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-370 cc: See next page DISTRIBUTION:
Public RidsAcrsAcnwMailCenter LPL2-1 R/F RidsNrrDorlLpl2-1 RidsNrrPMJStang (hard copy)
RidsRgn2MailCenter (JMoorman)
RidsNrrLAMO=Brien (hard copy)
RidsNrrDorlDpr RidsOgcRp RidsNrrCpnb (TChan)
Accession No. ML080080051 OFFICE NRR/LPL2-1/PM NRR/LPL2-1/LA NRR/CPNB/BC NRR/LPL2-1/BC (A)
NAME JStang:nc MO=Brien TChan TBoyce for JStang DATE 1/9/08 1/9/08 1/9/08 1/9/08 OFFICIAL RECORD COPY
McGuire Nuclear Station, Units 1 & 2 cc:
Vice President McGuire Nuclear Station Duke Power Company, LLC 12700 Hagers Ferry Road Huntersville, NC 28078 Associate General Counsel and Managing Attorney Duke Energy Carolinas, LLC 526 South Church Street - EC07H Charlotte, North Carolina 28202 County Manager of Mecklenburg County 720 E. Fourth St.
Charlotte, NC 28202 Regulatory Compliance Manager Duke Energy Corporation McGuire Nuclear Site 12700 Hagers Ferry Road Huntersville, NC 28078 Senior Resident Inspector U.S. Nuclear Regulatory Commission 12700 Hagers Ferry Road Huntersville, NC 28078 Mecklenburg County Department of Environmental Protection 700 N. Tryon St Charlotte, NC 28202 Vice President Customer Relations and Sales Westinghouse Electric Company 6000 Fairview Road, 12th Floor Charlotte, NC 28210 NCEM REP Program Manager 4713 Mail Service Center Raleigh, NC 27699-4713 Assistant Attorney General NC Department of Justice P.O. Box 629 Raleigh, NC 27602 Manager Nuclear Regulatory Issues &
Industry Affairs Duke Energy Corporation 526 S. Church St.
Mail Stop EC05P Charlotte, NC 28202 Division of Radiation Protection NC Dept of Environment, Health & Natural Resources 3825 Barrett Dr.
Raleigh, NC 27609-7721 Owners Group (NCEMC)
Duke Energy Corporation 4800 Concord Road York, SC 29745 Group Vice President, Nuclear Generation
& Chief Nuclear Officer P.O. Box 1006-EC07H Charlotte, NC 28201-1006 Senior Counsel Duke Energy Carolinas, LLC 526 South Church Street - EC07H Charlotte, NC 28202