Joe Pacher Manager, Nuclear Engineering Services R.E. Ginna Nuclear Power Plant, LLC 1503 Lake Road Ontario, New York 14519-9364 585.771.5208 585.771.3392 Fax joseph.pacher@constellation.com Constellation Energy-Nuclear Generation Group December 10, 2007 U.S. Nuclear Regulatory Commission Washington, DC 20555 ATTENTION:

SUBJECT:

Document Control Desk R.E. Ginna Nuclear Power Plant Docket No. 50-244 Generic Letter 2004-02 Confirmatory Telephone Call REFERNCES:

(a) Letter from Patrick D. Milano (NRC) to Mary G. Korsnick (Ginna LLC), dated February 9, 2006, R. E. Ginna Nuclear Power Plant Request for Additional Information RE: Response to Generic Letter 2004-02, "Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors" (b) Letter from William Ruland (NRC) to Anthony Pietrangelo (NEI), dated November 8, 2007, Plant-specific Requests for Extension of Time to Complete One or More Corrective Actions for Generic Letter 2004-02, "Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors" (c) Letter from Mary G. Korsnick (Ginna LLC) to Document Control Desk (NRC), dated July 27, 2006, Request for Extension for Completing Corrective Actions for Generic Letter 2004-02, "Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors" (d) Letter from Patrick D. Milano (NRC) to Mary G. Korsnick (Ginna LLC), dated October 4, 2006, R. E. Ginna Nuclear Power Plant - Approval of Extension Request for Completion of Corrective Actions in Response to Generic Letter 2004-02 Per a telephone conversation held on December 5, 2007 between Mr. Doug Pickett (NRC) and Brian Weaver (Ginna Licensing Director), R.E. Ginna Nuclear Power Plant understands that no additional extension requests are required regarding a response to Reference (a) for the December tenth deadline specified in Reference (b). Ginna's original extension request, Reference (c), was approved by the NRC on October 4, 2006 (Reference (d)) to enable installation during the spring 2008 Refueling Outage and completion of chemical effects and downstream effects testing.

Ginna holds the basis for the extension and the timeline approved still valid and remains committed to the NRC for the actions listed in Reference (c).

Vetruly yours, oseph Pacher Allý,

k 9A,

cc:

S. J. Collins, NRC D. V. Pickett, NRC Resident Inspector, NRC (Ginna)