ROP 8 - Limerick - Change to Inspection Plan 12/13/07
ML073470598
Person / Time
Site: Limerick  Constellation icon.png
Issue date: 12/13/2007
From: Paul Krohn
Reactor Projects Region 1 Branch 4
To: Pardee C
Exelon Generation Co
KROHN P, RI/DRP/PB4/610-337-5120
References
Download: ML073470598 (4)


Text

December 13, 2007 Mr. Charles G. Pardee Chief Nuclear Officer and Senior Vice President Exelon Generation Company, LLC 4300 Winfield Rd Warrenville, IL 60555

SUBJECT:

CHANGE TO THE INSPECTION PLAN FOR THE LIMERICK GENERATING STATION, UNITS 1 AND 2

Dear Mr. Pardee:

As part of a periodic self-assessment, the Nuclear Regulatory Commission (NRC) thoroughly reviewed the inspection procedures to ensure the continued effective application of inspection resources. The main objective of the review was to determine the appropriate inspection scope for the majority of the inspection procedures in the reactor oversight process (ROP). The result of this effort (designated ROP realignment) created changes to both inspection scope and/or inspection frequency for selected inspection procedures in the ROP. The purpose of this letter is to update the schedule of future inspection activities at your facility that was provided with the mid-cycle assessment letter in August 2007. Please note that there were no changes made to inspection procedures in the security, emergency preparedness, and health physics areas.

The enclosed inspection plan details the inspections (less those related to physical protection) scheduled for calendar year 2008. The inspection plan is provided to resolve any scheduling and/or personnel availability issues well in advance of the inspector(s) arrival onsite. Routine resident inspections are not listed due to their continuous nature.

In accordance with 10 CFR 2.390 of the NRCs Rules and Practices a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRCs document system (ADAMS).

ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (The Public Electronic Reading Room).

C. Pardee 2

Please contact me at 610-337-5120 with any questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA/

Paul G. Krohn, Chief Projects Branch 4 Division of Reactor Projects Docket Nos.

50-352, 50-353 License Nos. NPF-39, NPF-85 cc w/encl:

C. Crane, Executive Vice President and Chief Operating Officer, Exelon Generation M. Pacilio, Chief Operating Officer and Senior Vice President, Exelon Generation C. Mudrick, Site Vice President, Limerick Generating Station E. Callan, Plant Manager, Limerick Generating Station R. Kreider, Regulatory Assurance Manager, Limerick R. DeGregorio, Senior Vice President, Mid-Atlantic Operations W. Knoll, Vice President, Operations K. Jury, Vice President, Licensing and Regulatory Affairs P. Cowan, Director, Licensing and Regulatory Affairs B. Fewell, Vice President, General Counsel and Secretary Correspondence Control Desk D. Allard, Director, PA Department of Environmental Protection J. Johnsrud, National Energy Committee, Sierra Club Chairman, Board of Supervisors of Limerick Township J. Powers, Director, PA Office of Homeland Security R. French, Dir, PA Emergency Management Agency

C. Pardee 2

Please contact me at 610-337-5120 with any questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA/

Paul G. Krohn, Chief Projects Branch 4 Division of Reactor Projects Distribution w/encl:

S. Collins, RA M. Dapas, DRA D. Lew, DRP J. Clifford, DRP G. West, RI OEDO H. Chernoff, NRR P. Bamford, PM, NRR J. Hughey, NRR J. Lubinski, NRR P. Krohn, DRP R. Fuhrmeister, DRP T. Setzer, DRP S. Hansell, DRP - SRI C. Bickett, DRP - RI L. Pinkham - Resident OA Region I Docket Room (w/concurrence)

RidsNrrDirslpab@nrc.gov J. Thompson, NRR (JWT1@nrc.gov)

J. White, DRS L. Doerflein, DRS R. Conte, DRS L. Scholl, DRS P. Frechette, DRS D. Silk, DRS D. Screnci, PAO N. Sheehan, PAO R. Barkley, ORA D. Holody, ORA J. Trapp, DRS J. Rogge, DRS M. Sykes, DRS SUNSI Review Complete: pgk (Reviewer====s Initials)

DOCUMENT NAME: T:\\DRP\\BRANCH4\\ROP 8 LETTERS\\LGS ROP REALIGNMENT INSPECTION PLAN.DOC After declaring this document AAn Official Agency Record@ it will be released to the Public.

To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRP RI/DRP NAME RFuhrmeister/pgk for PKrohn/PGK DATE 12/12/07 12/12/07 OFFICIAL RECORD COPY

Limerick Inspection / Activity Plan 01/01/2008 - 12/31/2008 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 1 12/13/2007 10:50:48 Report 22 1

7112101

- OCC RAD SAFETY - ACCESS Baseline Inspections 01/07/2008 01/11/2008 1, 2 7112101 IP Access Control to Radiologically Significant Areas 1

7111108G

- U1 INSERVICE INSPECTION Baseline Inspections 03/10/2008 03/14/2008 1

7111108G IP Inservice Inspection Activities - BWR 1

7112102

- OCC RAD SAFETY - ALARA Baseline Inspections 03/10/2008 03/14/2008 1, 2 7112102 IP ALARA Planning and Controls 3

7111111B

- LSRO REQUAL INSPECTION Baseline Inspections 06/05/2008 06/09/2008 1, 2 7111111B IP Licensed Operator Requalification Program 1

7112202

- PUB RAD SAFETY - RADWASTE Baseline Inspections 06/02/2008 06/06/2008 1, 2 7112202 IP Radioactive Material Processing and Transportation 4

ISFSI

- ISFSI DRY RUN INSPECTIONS Other Routine 06/09/2008 06/27/2008 1, 2 60854 IP Preoperational Testing Of An ISFSI Other Routine 06/09/2008 06/27/2008 1, 2 60856 IP Review of 10 CFR 72.212(b) Evaluations 4

10/20EXM

- INITIAL OPERATOR LICENSING EXAMS Not Applicable 09/22/2008 09/26/2008 1

U01745 FY09 - LIMERICK INITIAL OPERATOR LICENSING EXAM Not Applicable 10/20/2008 10/31/2008 1

U01745 FY09 - LIMERICK INITIAL OPERATOR LICENSING EXAM 1

EP

- EP PROGRAM INSPECTION EP Baseline Inspectio 08/25/2008 08/29/2008 1, 2 7111404 IP Emergency Action Level and Emergency Plan Changes Baseline Inspections 08/25/2008 08/29/2008 1, 2 71151-EP01 IP Drill/Exercise Performance Baseline Inspections 08/25/2008 08/29/2008 1, 2 71151-EP02 IP ERO Drill Participation Baseline Inspections 08/25/2008 08/29/2008 1, 2 71151-EP03 IP Alert & Notification System 7

71152B

- PI&R Baseline Inspections 08/25/2008 08/29/2008 1, 2 71152B IP Identification and Resolution of Problems Baseline Inspections 09/08/2008 09/12/2008 1, 2 71152B IP Identification and Resolution of Problems 1

7111107B

- HEAT SINK INSP Baseline Inspections 09/29/2008 10/03/2008 1, 2 7111107B IP Heat Sink Performance 5

MODS

- MODS AND 50.59 Baseline Inspections 11/03/2008 11/07/2008 1, 2 7111117B IP Permanent Plant Modifications Baseline Inspections 11/17/2008 11/21/2008 1, 2 7111117B IP Permanent Plant Modifications This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.