|
---|
Category:Memoranda
MONTHYEARML23356A0212023-12-0101 December 2023 American Nuclear Insurers, Secondary Financial Protection (SFP) Program ML23103A2742023-04-25025 April 2023 04-25-23 - Letter to the Honorable Charles Schumer, Et Al., Responds to Concerns Regarding Holtec Decommissioning Internationals Plans to Release Effluents at the Indian Point Energy Center ML21232A2342021-08-20020 August 2021 Memo - Revised Transcript for Public Meeting Held on July 29, 2021, in Tarrytown, Ny, Re IP Energy Center Post-Shutdown Decommissioning Activities Report ML21056A0772021-04-0707 April 2021 Memo to File: Final Environmental Assessment and Finding of No Significant Impact for Initial and Updated Decommissioning Funding Plans for Indian Point ISFSI (Docket: 72-51) ML20104A3882020-04-13013 April 2020 Tasking in Response to the Concerns Pertaining to Gas Transmission Lines at the Indian Point Nuclear Power Plant Follow Up Activities Agency Level ML20104A7232020-04-13013 April 2020 Tasking in Response to the Concerns Pertaining to Gas Transmission Lines at the Indian Point Nuclear Power Plant; Follow Up Activities; Office Level ML20099F7752020-04-0909 April 2020 Report Transmittal Memo to the Commissioners, from: Margaret M. Doane ML20058E3542020-02-27027 February 2020 Tasking Memo to Dskeen Re Concerns Identifed in Report Pertaining to Gas Transmission Lines ML20056F0952020-02-13013 February 2020 Concerns Pertaining to Gas Transmission Lines at the Indian Point Nuclear Power Plant ML18046B4412018-02-23023 February 2018 Review of Updated Final Safety Analysis Report, Revision 7 ML17271A0532017-09-29029 September 2017 2017 Summary of Annual Decommissioning Funding Status Reports for Reactors in Decommissioning ML17180A5032017-09-21021 September 2017 04/19/2017 Summary of Teleconference with Entergy Nuclear Operations, Inc., Concerning Request for Additional Information Pertaining to the Indian Point Unit Nos. 2 and 3 License Renewal Application ML17157B5422017-06-20020 June 2017 Conference Call on 2nd Round RAIs - Final ML17128A3352017-05-23023 May 2017 Summary of Telephone Conference Call Between the NRC and Entergy Concerning RAIs Pertaining to IP2 and IP3 ML17060A6602017-04-12012 April 2017 Potentially Cost-Beneficial SAMAs ML17082A3112017-04-11011 April 2017 Summary of Clarification Call with Entergy Regarding Follow-Up RAIs on ISG-2012-02 ML16336A4992017-01-18018 January 2017 Notice of Significant Licensing Action ML17052A3002017-01-11011 January 2017 Security Exclusion Zone Acoustic Tag Detection Study, 9 November 2016 ML17052A3092017-01-11011 January 2017 Atlantic Sturgeon Distribution Memo ML16088A2042016-03-28028 March 2016 Memo T Bowers from s Ruffin, Technical Assistance Requests - Review 2015 Tri-Annual Decommissioning Funding Plans for Multiple Independent Spent Fuel Storage Installations W/ Encl 2 (Template) ML16088A2052016-03-28028 March 2016 Enclosure 1 - (72.30 DFP Reviews to Be Completed 2015) - Memo T Bowers from s Ruffin, Technial Assistance Requests - Review 2015 Tri-Annual Decommissioning Funding Plans for Multiple Independent Spent Fuel Storage Installations ML15190A2912015-07-22022 July 2015 070115, Summary of Telephone Conference Call Held Between NRC and Entergy Concerning the RAIs Pertaining to the Indian Point LRA Safety Review ML15139A1952015-05-19019 May 2015 Special Inspection Team Charter - Indian Point Nuclear Generating Unit 3 - Water Accumulation in Safety-Related Switchgear Room Following Deluge of Main Transformer Fire ML15107A1752015-04-28028 April 2015 041615, Summary of Telephone Conference Call Held Between NRC and Entergy Concerning the RAIs Pertaining to the Indian Point LRA Environmental Review ML15091A0972015-04-0101 April 2015 Figures from Indian Point Quarter 3 2014 Groundwater Monitoring Report - Part 4 ML14344A9652014-12-18018 December 2014 Summary of Telephone Conference Call Held Between NRC and Entergy Concerning the RAIs Pertaining to the Indian Point LRA Environmental Review ML14269A1972014-10-0303 October 2014 LTR-14-0463-1 - Proposed Comments to the Federal Energy Regulatory Commission'S Draft Environmental Impact Statement Algonquin Incremental Market Project (Docket No. CP14-96-000) ML13256A0432013-09-10010 September 2013 Request for Additional Information to Entergy Nuclear Northeast, Indian Point Units 2 and 3, Regarding NTTF Recommendation 9.3 Phase 1 Staffing Assessments Submittal ML13218A0862013-08-0808 August 2013 Notice of Forthcoming Meeting with Entergy Nuclear Operations, Inc. and Netco to Discuss the Goals and Objectives of the Long-Term Spent Fuel Pool Improvement Program for Indian Point Unit 2 and 3 ML13102A1242013-04-15015 April 2013 Summary of April 11, 2013, Telephone Conference Call Between NRC and Entergy Entry of Indian Point Nuclear Generating Unit No. 2 Into the Period of Timely Renewal ML12361A1552012-12-26026 December 2012 Summary of Entergy Drop-In on December 19, 2012 ML12296A9292012-10-23023 October 2012 Memo Draft Request for Additional Information for Indian Point Units 1 and 2 Memo ML12215A2482012-09-17017 September 2012 Summary of Conference Call Held on June 4, 2012, Between the U.S. Nuclear Regulatory Commission and Entergy Nuclear Operations, Inc., Concerning the Reactor Vessel Internals Program at Indian Point Nuclear Generating Station, Units 2 and 3 ML12213A0612012-08-0101 August 2012 8/16/12 Forthcoming Conference Call with NextEra Energy and Florida Power & Light Concerning Generic Letter 2004-02 and Request for NRC Staff Review of Draft Proposed Guideline for Strainer Fiber Bypass Test Protocol ML13196A2202012-06-0606 June 2012 Memo from B. Balsam, NRR and D. Logan, NRR to J. Susco, NRR on Summary of Section 7 Consultation Activities Related to the National Marine Fisheries Service'S Final Rule to List the Atlantic Sturgeon ML12137A0602012-05-29029 May 2012 Nuclear Regulatory Commission'S Analysis of Entergy Nuclear Operations, Inc. Decommissioning Funding Status Report for Indian Point Nuclear Generating Station, Units 1, 2 & 3; and Pilgrim Nuclear Power Station ML1122701452011-08-30030 August 2011 Summary of Conference Call Between NRC and Entergy Nuclear Operations, Regarding Non-EQ Inaccessible Medium-Voltage Cable Program for Indian Point Units 2 & 3 ML11201A3062011-07-29029 July 2011 Summary of Telephone Conference Calls Held on June 20, June 22, and June 29, 2011, Regarding the Ongoing Endangered Species Act Consultation for the Proposed Indian Point Nuclear Generating Unit Nos. 2 and 3 License Renewal NL-11-093, Clean Water Act Section 401 Water Quality Certification Waiver2011-07-29029 July 2011 Clean Water Act Section 401 Water Quality Certification Waiver ML1118703442011-07-0606 July 2011 Memorandum and Order (Ruling on Pending Motions for Leave to File New and Amended Contentions) ML1115704052011-06-0606 June 2011 Notice of Meeting with Entergy Operations, Inc., to Discuss Implementation of Quality Oversight and Verification Programs at Entergy Sites Including Actions Being Taken to Enhance Effectiveness ML11102A0062011-05-0909 May 2011 01/12/11 Summary of Telephone Conference Call Between Nuclear Regulatory Commission and Entergy Nuclear Operations, Inc., Concerning the Final SEIS for the Proposed License Renewal of Indian Point, Units 2 and 3 ML1110909492011-04-25025 April 2011 Notice of Meeting G20110221/EDATS:OEDO-2011-0226- with the State of New York Attorney General'S Office (the Petitioner) Requesting Action Under 10 CFR 2.206 Regarding Fire Protection at Indian Point ML1110909052011-04-22022 April 2011 NRC and Entergy Nuclear Operations, Inc. Held a Category 1 Public Meeting on April 18, 2011, to Discuss the Shortnose Sturgeon ML1110103962011-04-11011 April 2011 Notice of Forthcoming Meeting with Entergy Nuclear Operations, Inc. to Discuss the License Amendment Requests to Permit the Transfer of Spent Fuel from the Indian Point Unit 3 Spent Fuel Pool to the Unit 2 Spent Fuel Pool ML1109803932011-04-0808 April 2011 Forthcoming Meeting with NRC and Entergy Operations, Inc ML11223A0412011-03-23023 March 2011 Memorandum from J. Boska, NRR to T. Quay, NRR on Review of 10 CFR 2.206 Petition on Gas Pipelines Near the Indian Point Reactors ML1107504052011-03-21021 March 2011 Notice of Meeting with Entergy Operations, Inc., to Discuss Fleetwide Submittal for Proposed Technical Specification and Quality Assurance Program Manual Changes Related to Unit Staff Qualification Requirements ML1029106182010-10-14014 October 2010 Documentation of Telephone Conversation Between Mr. David Lochbaum Regarding Follow-Up Questions Related to NRC Letter Dated July 28, 2010 (ML102040807) ML0931701682009-11-17017 November 2009 Summary of Teleconference Call Held on 11/3/09 Between the U.S. NRC and Entergy Nuclear Operations, Inc., Concerning Meteorological Data Used for the Severe Accident Mitigation Alternative Analyses 2023-04-25
[Table view] |
Text
November 28, 2007 MEMORANDUM TO: Dave Pstrak, Branch Chief Division of Spent Fuel Storage and Transportation Licensing & Inspection Directorate Rules, Inspections, & Operations Branch Office of Nuclear Material Safety and Safeguards FROM: Robert Caldwell, Branch Chief/RA/
Materials, Waste & International Security Branch Division of Security Policy Office of Nuclear Security and Incident Response
SUBJECT:
STAFF REVIEW OF ENTERGY NUCLEAR OPERATIONS RESPONSE FOR INDIAN POINT NUCLEAR POWER REACTOR TO THE MAY 7, 2004, SECURITY ORDERS ISSUED TO PROPOSED DRY STORAGE INDEPENDENT SPENT FUEL STORAGE FACILITIES On August 27, 2007, and October 16, 2007, Entergy Nuclear Operations, Inc., (ENO) submitted its responses to the May 7, 2004, order imposing additional safeguards and security compensatory measures for spent fuel storage at Independent Spent Fuel Storage Installations (ISFSIs). Their responses concerned the Indian Point Nuclear Power Reactor ISFSI which is now complete. They are tentatively scheduled to have their initial movement of spent fuel from Unit 1 in December 2007. Our review was conducted in accordance with the performance objectives and general requirements of Title 10 of the Federal Code of Regulations (10 CFR) 73.51 and the issued Additional Security Measures (ASMs). Based on our review, we have determined that the ENO, Indian Point Nuclear Power Reactor Physical Security Plan has met the performance objectives and general requirements outlined in 10 CFR 73.51 and the ASMs.
This will be verified by the conduct of on-site inspections.
CONTACT: Paul J. Kelley, Jr., NSIR/DSP/MWISB/WST (301) 415-6101
November 28, 2007 MEMORANDUM TO: Dave Pstrak, Branch Chief Division of Spent Fuel Storage and Transportation Licensing & Inspection Directorate Rules, Inspections, & Operations Branch Office of Nuclear Material Safety and Safeguards FROM: Robert Caldwell, Branch Chief/RA/
Materials, Waste & International Security Branch Division of Security Policy Office of Nuclear Security and Incident Response
SUBJECT:
STAFF REVIEW OF ENTERGY NUCLEAR OPERATIONS RESPONSE FOR INDIAN POINT NUCLEAR POWER REACTOR TO THE MAY 7, 2004, SECURITY ORDERS ISSUED TO PROPOSED DRY STORAGE INDEPENDENT SPENT FUEL STORAGE FACILITIES On August 27, 2007, and October 16, 2007, Entergy Nuclear Operations, Inc., (ENO) submitted its responses to the May 7, 2004, order imposing additional safeguards and security compensatory measures for spent fuel storage at Independent Spent Fuel Storage Installations (ISFSIs). Their responses concerned the Indian Point Nuclear Power Reactor ISFSI which is now complete. They are tentatively scheduled to have their initial movement of spent fuel from Unit 1 in December 2007. Our review was conducted in accordance with the performance objectives and general requirements of Title 10 of the Federal Code of Regulations (10 CFR) 73.51 and the issued Additional Security Measures (ASMs). Based on our review, we have determined that the ENO, Indian Point Nuclear Power Reactor Physical Security Plan has met the performance objectives and general requirements outlined in 10 CFR 73.51 and the ASMs.
This will be verified by the conduct of on-site inspections.
CONTACT: Paul J. Kelley, Jr., NSIR/DSP/MWISB/WST (301) 415-6101 DISTRIBUTION:
RWharton PKelley AGaudreau RCaldwell DSP r/f ADAMS ACCESSION NO.: ML073310566 OFFICE: MWISB MWISB NSIR/DSP NAME: PKelley RCaldwell MShaffer DATE: 11/28/07 11/28/07 11/28/07 OFFICIAL RECORD COPY