ML073310566
| ML073310566 | |
| Person / Time | |
|---|---|
| Site: | Indian Point |
| Issue date: | 11/28/2007 |
| From: | Caldwell R NRC/NSIR/DSP/DDMS/MWISB |
| To: | David Pstrak NRC/NMSS/SFST/LID/RIOB |
| Kelley P NSIR/DSP 301-415-6101 | |
| References | |
| Download: ML073310566 (2) | |
Text
November 28, 2007 MEMORANDUM TO:
Dave Pstrak, Branch Chief Division of Spent Fuel Storage and Transportation Licensing & Inspection Directorate Rules, Inspections, & Operations Branch Office of Nuclear Material Safety and Safeguards FROM:
Robert Caldwell, Branch Chief/RA/
Materials, Waste & International Security Branch Division of Security Policy Office of Nuclear Security and Incident Response
SUBJECT:
STAFF REVIEW OF ENTERGY NUCLEAR OPERATIONS RESPONSE FOR INDIAN POINT NUCLEAR POWER REACTOR TO THE MAY 7, 2004, SECURITY ORDERS ISSUED TO PROPOSED DRY STORAGE INDEPENDENT SPENT FUEL STORAGE FACILITIES On August 27, 2007, and October 16, 2007, Entergy Nuclear Operations, Inc., (ENO) submitted its responses to the May 7, 2004, order imposing additional safeguards and security compensatory measures for spent fuel storage at Independent Spent Fuel Storage Installations (ISFSIs). Their responses concerned the Indian Point Nuclear Power Reactor ISFSI which is now complete. They are tentatively scheduled to have their initial movement of spent fuel from Unit 1 in December 2007. Our review was conducted in accordance with the performance objectives and general requirements of Title 10 of the Federal Code of Regulations (10 CFR) 73.51 and the issued Additional Security Measures (ASMs). Based on our review, we have determined that the ENO, Indian Point Nuclear Power Reactor Physical Security Plan has met the performance objectives and general requirements outlined in 10 CFR 73.51 and the ASMs.
This will be verified by the conduct of on-site inspections.
CONTACT: Paul J. Kelley, Jr., NSIR/DSP/MWISB/WST (301) 415-6101
November 28, 2007 MEMORANDUM TO:
Dave Pstrak, Branch Chief Division of Spent Fuel Storage and Transportation Licensing & Inspection Directorate Rules, Inspections, & Operations Branch Office of Nuclear Material Safety and Safeguards FROM:
Robert Caldwell, Branch Chief/RA/
Materials, Waste & International Security Branch Division of Security Policy Office of Nuclear Security and Incident Response
SUBJECT:
STAFF REVIEW OF ENTERGY NUCLEAR OPERATIONS RESPONSE FOR INDIAN POINT NUCLEAR POWER REACTOR TO THE MAY 7, 2004, SECURITY ORDERS ISSUED TO PROPOSED DRY STORAGE INDEPENDENT SPENT FUEL STORAGE FACILITIES On August 27, 2007, and October 16, 2007, Entergy Nuclear Operations, Inc., (ENO) submitted its responses to the May 7, 2004, order imposing additional safeguards and security compensatory measures for spent fuel storage at Independent Spent Fuel Storage Installations (ISFSIs). Their responses concerned the Indian Point Nuclear Power Reactor ISFSI which is now complete. They are tentatively scheduled to have their initial movement of spent fuel from Unit 1 in December 2007. Our review was conducted in accordance with the performance objectives and general requirements of Title 10 of the Federal Code of Regulations (10 CFR) 73.51 and the issued Additional Security Measures (ASMs). Based on our review, we have determined that the ENO, Indian Point Nuclear Power Reactor Physical Security Plan has met the performance objectives and general requirements outlined in 10 CFR 73.51 and the ASMs.
This will be verified by the conduct of on-site inspections.
CONTACT: Paul J. Kelley, Jr., NSIR/DSP/MWISB/WST (301) 415-6101 DISTRIBUTION:
RWharton PKelley AGaudreau RCaldwell DSP r/f ADAMS ACCESSION NO.: ML073310566 OFFICE:
MWISB MWISB NSIR/DSP NAME:
PKelley RCaldwell MShaffer DATE:
11/28/07 11/28/07 11/28/07 OFFICIAL RECORD COPY