ARB Summary, RIV-2007-A-0028 for Callaway to Discuss Clarification of Concerns and New Potential DiscriminationML073270107 |
Person / Time |
---|
Site: |
Callaway |
---|
Issue date: |
04/09/2007 |
---|
From: |
NRC Region 4 |
---|
To: |
|
---|
References |
---|
RIV-2007-A-0028, FOIA/PA-2008-0011 |
Download: ML073270107 (4) |
|
|
---|
Category:Report
MONTHYEARML24122C6372024-05-0101 May 2024 CFR 50.59 and 10 CFR 72.48 Summary Report November 24, 2022 to May 1 2024 ML24115A0992024-04-0101 April 2024 EIP-ZZ-A0066, Rev 30, RERP Training Program ML24086A5142024-03-26026 March 2024 Changes to the Westinghouse and Framatome ECCS Evaluation Models and PCT Penalty Assessments ULNRC-06861, Westinghouse and Framatome, ECCS Evaluation Model Margin Assessments2024-03-26026 March 2024 Westinghouse and Framatome, ECCS Evaluation Model Margin Assessments ML24065A2992024-03-0505 March 2024 Enclosure - Callaway Nuclear Plant: Form Oar-1 Owners Activity Report ULNRC-06849, Cracking Assessment for Framatome RSG Channel Head Assembly2023-12-20020 December 2023 Cracking Assessment for Framatome RSG Channel Head Assembly ML23215A1992023-08-31031 August 2023 ANP-4012NP, Callaway, Unit 1, Rod Ejection Accident Analysis Revision 2, August 2023 ML23299A1982023-06-16016 June 2023 Enclosure 2: Callaway RR Tech Report Containment Post-Tensioning System Inservice Inspection Technical Report Basis for Proposed Extension of Examination Interval, Revision 0 ML23156A6712023-06-0505 June 2023 Description and Justification for Changes ML23150A1832023-05-30030 May 2023 EIP-ZZ-00240 Addendum E, Revision 027, Health Physics Coordinator (Hpc) Checklist Administrative Correction ML23150A1842023-05-18018 May 2023 EIP-ZZ-00240 Addendum E, Revision 027, Health Physics Coordinator (Hpc) Checklist ML23150A1892023-05-18018 May 2023 EIP-ZZ-00245 Addendum H, Revision 004, Security Coordinator Checklist for the Alternate Tsc/Osa Assembly Area ML23131A3882023-04-26026 April 2023 EIP-ZZ-PRO2O Minor Revision 54, Activation and Operation of the Joint Information Center - Procedure Review Form and 50.54(q) Screening Form ML23110A0712023-04-0606 April 2023 Procedure Review Form (PRF) for EIP-ZZ-A0066, Revision 28, RERP Training Program ML24115A1002023-03-26026 March 2023 EIP-ZZ-PRO2O, Rev. 55, Activation and Operation of the Joint Information Center ML23068A0992023-03-0909 March 2023 Special Report 2023-01 PAM Report ULNRC-06796, Enclosure 7 - Holtec International Report HI-2230125, Revision 0, Supplemental Criticality Safety Analysis of SFP for Callaway Nuclear Generating Station, Revision 0, Dated February 14, 20232023-02-14014 February 2023 Enclosure 7 - Holtec International Report HI-2230125, Revision 0, Supplemental Criticality Safety Analysis of SFP for Callaway Nuclear Generating Station, Revision 0, Dated February 14, 2023 ML22349A6272022-12-15015 December 2022 Enclosure 3 - 2022 Proxy Statement of Ameren Corporation ML22349A6322022-12-15015 December 2022 Enclosure 8 - 10-K Filed 02/23/2022 ML22349A6342022-12-15015 December 2022 Enclosure 9 - 10-Q Filed 03/31/2022 ML22349A6352022-12-15015 December 2022 Enclosure 10 - 10-Q Filed 06/30/2022 ML22349A6362022-12-15015 December 2022 Enclosure 11 - 10-Q Filed 09/30/2022 ML22349A6402022-12-15015 December 2022 Enclosure 14 - Schedule 14C Information for Union Electric Company March 2022 ML22327A2242022-11-23023 November 2022 Enclosure 1: Callaway Plant - Report Period: 10 CFR 50.59 and 10 CFR 72.48 Summary Report June 16, 2021 to November 23, 2022 ML22335A5012022-11-16016 November 2022 Enclosure 3: ANP-4012NP, Revision 1, Callaway Rod Ejection Accident Analysis ML22318A1902022-11-14014 November 2022 Enclosure 2 - Pressurized Water Reactor Owners Group Letter, OG-22-187, Subject: PWR Owners Group Mode 4 LOCA Analysis for Westinghouse NSSS Plants ULNRC-06774, HI-2220020, Revision 2, Non Proprietary Version of Criticality Safety Analysis of SFP for Callaway Nuclear Generating Station2022-10-21021 October 2022 HI-2220020, Revision 2, Non Proprietary Version of Criticality Safety Analysis of SFP for Callaway Nuclear Generating Station ULNRC-06768, Attachment 8 to Enclosure 1: ANP-3969NP, Callaway Non-LOCA Summary Report, Revision 2, Dated October 20222022-10-12012 October 2022 Attachment 8 to Enclosure 1: ANP-3969NP, Callaway Non-LOCA Summary Report, Revision 2, Dated October 2022 ML22285A1222022-10-12012 October 2022 Attachment 5 to Enclosure 1: ANP-3947NP, Callaway Unit 1 License Amendment Request Inputs for Use of Framatome Fuel, Revision 3, Dated October 2022 ML22285A1232022-10-12012 October 2022 Attachment 6 to Enclosure 1: ANP-3944NP, Callaway Realistic Large Break LOCA Analysis with Gaia Fuel Design, Revision 1, Dated October 2022 ML22285A1242022-10-12012 October 2022 Attachment 7 to Enclosure 1: ANP-3943NP, Callaway Small Break LOCA Analysis with Gaia Fuel Design, Revision 1, Dated October 2022 ML22181B1362022-06-30030 June 2022 Attachment 6 - Replacement for Attachment 6, Description and Assessment Specific to TSTF-439, of ULNRC-06688 ML22181B1402022-06-30030 June 2022 Enclosure 1 - Replacement for Enclosure 1, List of Revised Required Actions to Corresponding PRA Functions, of ULNRC-06688 ML22181B1412022-06-30030 June 2022 Enclosure 4 - Replacement for Enclosure 4, Information Supporting Justification of Excluding Sources of Risk Not Addressed by the PRA Models, of ULNRC-06688 ULNRC-06729, Attachment 8 - Non-Proprietary Version of Non-LOCA Summary Report2022-06-0202 June 2022 Attachment 8 - Non-Proprietary Version of Non-LOCA Summary Report ML22153A1822022-06-0202 June 2022 Attachment 6 - Non-Proprietary Version of Rlbloca Summary Report ML22153A1832022-06-0202 June 2022 Attachment 7 - Non-Proprietary Version of SBLOCA Summary Report ML22027A8082022-01-27027 January 2022 Enclosure 3: Callaway, Unit 1, Methodology for a Risk-Informed Approach to Address Generic Letter 2004-02 ML22027A8092022-01-27027 January 2022 Enclosure 4: Callaway, Unit 1, Acronyms and Definitions ML22027A8062022-01-27027 January 2022 Enclosure 1: Request for Exemptions for Risk-Informed Approach to Resolution for Generic Letter 2004-02 ML21356B5072021-12-22022 December 2021 Enclosure 1: Mark-up of Operating License (OL) ML21356B5082021-12-22022 December 2021 Enclosure 2: Clean Copy of Affected OL Pages (Reflecting Proposed Change) ML21343A0952021-12-0909 December 2021 Attachment 1: Description and Assessment ML21335A1602021-12-0101 December 2021 Special Report 2021-02: Accident Monitoring Instrumentation Non-Functional for Greater than 7 Days ML21280A3802021-10-0707 October 2021 Cumulative Summary of Changes to Enclosure 2, License Amendment Request, and Enclosure 3, Callaway Methodology for a Risk-Informed Approach to Address Generic Letter 2004-02, of ULNRC-06526 ML21280A3812021-10-0707 October 2021 License Amendment Request for Risk-Informed Approach to Resolution of Generic Letter 2004-02 ML21272A1702021-09-28028 September 2021 Enclosure 2 - Full Scope Implementation of Alternative Source Term Evaluation of Proposed Changes (Redacted) ML21237A1372021-08-23023 August 2021 Enclosure 1: Callaway, Unit 1, Amendment Request Regarding Risk-Informed Approach to Closure of Generic Safety Issue 191 - Baseline Weld Input ML21237A1382021-08-23023 August 2021 Enclosure 2: Callaway, Unit 1, Amendment Request Regarding Risk-Informed Approach to Closure of Generic Safety Issue 191 - CAL Roverd Results Baseline (Critical Breaks) ULNRC-06683, Enclosure 3: Callaway, Unit 1, Amendment Request Regarding Risk-Informed Approach to Closure of Generic Safety Issue 191 - CAL Roverd Results Baseline (Non-Isolable Breaks)2021-08-23023 August 2021 Enclosure 3: Callaway, Unit 1, Amendment Request Regarding Risk-Informed Approach to Closure of Generic Safety Issue 191 - CAL Roverd Results Baseline (Non-Isolable Breaks) 2024-05-01
[Table view] Category:Miscellaneous
MONTHYEARML24115A0992024-04-0101 April 2024 EIP-ZZ-A0066, Rev 30, RERP Training Program ULNRC-06861, Westinghouse and Framatome, ECCS Evaluation Model Margin Assessments2024-03-26026 March 2024 Westinghouse and Framatome, ECCS Evaluation Model Margin Assessments ML24086A5142024-03-26026 March 2024 Changes to the Westinghouse and Framatome ECCS Evaluation Models and PCT Penalty Assessments ML23156A6712023-06-0505 June 2023 Description and Justification for Changes ML23131A3882023-04-26026 April 2023 EIP-ZZ-PRO2O Minor Revision 54, Activation and Operation of the Joint Information Center - Procedure Review Form and 50.54(q) Screening Form ML24115A1002023-03-26026 March 2023 EIP-ZZ-PRO2O, Rev. 55, Activation and Operation of the Joint Information Center ML23068A0992023-03-0909 March 2023 Special Report 2023-01 PAM Report ML22027A8092022-01-27027 January 2022 Enclosure 4: Callaway, Unit 1, Acronyms and Definitions ML22027A8062022-01-27027 January 2022 Enclosure 1: Request for Exemptions for Risk-Informed Approach to Resolution for Generic Letter 2004-02 ML21356B5082021-12-22022 December 2021 Enclosure 2: Clean Copy of Affected OL Pages (Reflecting Proposed Change) ML21356B5072021-12-22022 December 2021 Enclosure 1: Mark-up of Operating License (OL) ML21343A0952021-12-0909 December 2021 Attachment 1: Description and Assessment ML21335A1602021-12-0101 December 2021 Special Report 2021-02: Accident Monitoring Instrumentation Non-Functional for Greater than 7 Days ML21280A3802021-10-0707 October 2021 Cumulative Summary of Changes to Enclosure 2, License Amendment Request, and Enclosure 3, Callaway Methodology for a Risk-Informed Approach to Address Generic Letter 2004-02, of ULNRC-06526 ML21280A3812021-10-0707 October 2021 License Amendment Request for Risk-Informed Approach to Resolution of Generic Letter 2004-02 ML21173A3412021-06-22022 June 2021 CFR 50.59 and 10 CFR 72.48 Summary Report - May 16, 2019 to June 15, 2021 ULNRC-06437, Cycle 22 Commitment Change Summary Report2018-06-0707 June 2018 Cycle 22 Commitment Change Summary Report ML17097A5582017-03-30030 March 2017 Enclosure 2 to ULNRC-06349 - Minimum Decommissioning Cost - Per 10 CFR 50.75 Formula Process ULNRC-06349, Callaway, Unit 1 - Enclosure 2 to ULNRC-06349 - Minimum Decommissioning Cost - Per 10 CFR 50.75 Formula Process2017-03-30030 March 2017 Callaway, Unit 1 - Enclosure 2 to ULNRC-06349 - Minimum Decommissioning Cost - Per 10 CFR 50.75 Formula Process ML16160A0952016-06-0808 June 2016 ASP ANALYSIS-REJECT- Callaway Unit 1 Auxiliary Feedwater Control Valves in Motor Driven Pump Train Inoperable due to Faulty Electric positioner Cards (LER 483-2015-003 and 483-2015-004) ULNRC-06292, Transmittal of 10 CFR50.46 Annual Report ECCS Evaluation Model Revisions2016-03-30030 March 2016 Transmittal of 10 CFR50.46 Annual Report ECCS Evaluation Model Revisions ULNRC-06199, Nuclear Property Insurance Reporting2015-03-18018 March 2015 Nuclear Property Insurance Reporting ULNRC-06173, Submits Owner'S Activity Reports (OAR-1 Forms) for Cycle 20 and Refuel 202015-02-19019 February 2015 Submits Owner'S Activity Reports (OAR-1 Forms) for Cycle 20 and Refuel 20 ML14310A8362015-02-0909 February 2015 NRC Staff Evaluation of Final Rule for Continued Storage of Spent Nuclear Fuel for the License Renewal Environmental Review for Callaway, Unit 1 ULNRC-06168, Enclosure 5 - 10-K Filed Period 12/31/2013 - Ameren2014-12-18018 December 2014 Enclosure 5 - 10-K Filed Period 12/31/2013 - Ameren ULNRC-06168, Enclosure 7 - 10-Q Filed Period 6/30/2014 Ameren2014-12-18018 December 2014 Enclosure 7 - 10-Q Filed Period 6/30/2014 Ameren ULNRC-06168, Enclosure 10 - Articles of Incorporation Ameren Corporation Restated 10/17/19952014-12-18018 December 2014 Enclosure 10 - Articles of Incorporation Ameren Corporation Restated 10/17/1995 ULNRC-06168, Enclosure 8 - 10-Q Filed Period 9/30/2014 Ameren2014-12-18018 December 2014 Enclosure 8 - 10-Q Filed Period 9/30/2014 Ameren ULNRC-06168, Enclosure 9 - Articles of Incorporation Ameren Corporation Dated 08/07/19952014-12-18018 December 2014 Enclosure 9 - Articles of Incorporation Ameren Corporation Dated 08/07/1995 ULNRC-06168, Enclosure 14 - Defc 14c Filed Period 3/11/2014 - Union Electric2014-12-18018 December 2014 Enclosure 14 - Defc 14c Filed Period 3/11/2014 - Union Electric ULNRC-06168, Enclosure 6 - 10-Q Filed Period 3/31/2014 - Ameren2014-12-18018 December 2014 Enclosure 6 - 10-Q Filed Period 3/31/2014 - Ameren ULNRC-06168, Enclosure 11 - Ameren Corporation By-Laws Effective 12/14/20122014-12-18018 December 2014 Enclosure 11 - Ameren Corporation By-Laws Effective 12/14/2012 ULNRC-06168, Enclosure 4 - 2013 Annual Report (Includes 2013 Form 10-K) - Ameren2014-12-18018 December 2014 Enclosure 4 - 2013 Annual Report (Includes 2013 Form 10-K) - Ameren ULNRC-06168, Enclosure 16 - Articles of Incorporation - Union Electric Company Restated 04/12/19942014-12-18018 December 2014 Enclosure 16 - Articles of Incorporation - Union Electric Company Restated 04/12/1994 ULNRC-06168, Enclosure 17 - By-Laws of Union Electric Company as Amended to 12/10/20102014-12-18018 December 2014 Enclosure 17 - By-Laws of Union Electric Company as Amended to 12/10/2010 ML14352A4472014-12-18018 December 2014 Enclosure 3 - 2014 Proxy Statement of Ameren Corporation - Ameren ML14352A4432014-12-18018 December 2014 Enclosure 10 - Articles of Incorporation Ameren Corporation Restated 10/17/1995 ML14352A4412014-12-18018 December 2014 Enclosure 7 - 10-Q Filed Period 6/30/2014 Ameren ML14352A4402014-12-18018 December 2014 Enclosure 5 - 10-K Filed Period 12/31/2013 - Ameren ML14352A4392014-12-18018 December 2014 Enclosure 8 - 10-Q Filed Period 9/30/2014 Ameren ML14352A4382014-12-18018 December 2014 Enclosure 9 - Articles of Incorporation Ameren Corporation Dated 08/07/1995 ML14352A4362014-12-18018 December 2014 Enclosure 14 - Defc 14c Filed Period 3/11/2014 - Union Electric ML14352A4352014-12-18018 December 2014 Enclosure 6 - 10-Q Filed Period 3/31/2014 - Ameren ML14352A4342014-12-18018 December 2014 Enclosure 11 - Ameren Corporation By-Laws Effective 12/14/2012 ML14352A4332014-12-18018 December 2014 Enclosure 4 - 2013 Annual Report (Includes 2013 Form 10-K) - Ameren ML14352A4322014-12-18018 December 2014 Enclosure 16 - Articles of Incorporation - Union Electric Company Restated 04/12/1994 ML14352A4302014-12-18018 December 2014 Enclosure 17 - By-Laws of Union Electric Company as Amended to 12/10/2010 ML14352A4292014-12-18018 December 2014 Enclosure 15 - Articles of Incorporation - Missouri Electric Light and Power Company Dated 11/20/1922 ULNRC-06168, Enclosure 15 - Articles of Incorporation - Missouri Electric Light and Power Company Dated 11/20/19222014-12-18018 December 2014 Enclosure 15 - Articles of Incorporation - Missouri Electric Light and Power Company Dated 11/20/1922 ULNRC-06157, Special Report 2014-04: Inoperability of a Seismic Instrument for Greater than 30 Days2014-11-14014 November 2014 Special Report 2014-04: Inoperability of a Seismic Instrument for Greater than 30 Days 2024-04-01
[Table view] |
Text
ARB
SUMMARY
Responsible RPBB RIV-2007-A-0028 Branch Facility Name Callaway ARB Date: April 9, 2007 Docket Number 050-483 01 Case No.:
ARB DECISION Purpose of ARB Discuss clarification of concerns and new potential discrimination.
Previous Concern 1- RPBB.to inspect.
Decisions Concern 2- RPBB to inspect non-willful aspects and identify any potential violations. Re-ARB to discuss 01 followup of potential willfulness.
Concerns 3-6, ACES/RPBB/EB2- to contact alleger, regarding objection to referral and to get clarification regarding concerns.
Today's Decision Concern 3- RPBB to inspect.
Concern 4- ACES to offer early ADR, ifADR fails, 01 to investigate high priority.
Basis for Another ARB REFERRAL Refer to: Criteria Reviewed?
Referral Rationale 01 INVESTIGATION Priority Rationale High- Level of management involved DOL Deferral Rationale ARB PARTICIPANTS (* denotes ARB Chairman Approval)
JWalker HFreeman KFuller MHaire AHowell*
DWhite FBrush RCaniano KCIa ton Information in this record was deleted in accordance with the Freedom of Information Act, exemptions FOIA.c0O',y6/,
CONCERNS LIST RIV-2007-A-0028 ]
Concern (Brief Statement) Regulatory Requirement Branch Action (inspect, Refer, Planned significance 01 Priority Investigate, No Action) Completion (High, (H, N, L)
Normal) 1 On October 23, 2003, while shutting down to Mode 3, the Criterion V, TSs RCS temperature dropped below the Minimum Temperature for Critical Operation. However, the temperature transient was not documented in a condition report until 38 days later when identified by a training instructor. At the time the condition report was assigned a significance level 4. The concern individual (Cl) expressed concern that this significance level was too low. The condition also was not documented in the shift supervisor log.
RPBB Inspect 5/19/07 N N 2 The operating crew waited 90 minutes to fully insert control Criterion V, TSs rods following shutting down the reactor. The Cl believes this delay may have been intentional to avoid scrutiny of crews actions, since the crew was supposed to maintain Mode 2 in case the equipment necessitating the shutdown was repaired. The Cl states that purposefully delaying inserting the control rods, not logging entry into Technical Specifications and not documenting significant operational transients in the corrective action program are dishonest and negligent omissions.
RPBB Inspect N N 3 The licensee does not have a healthy SCWE. The SCWE environment for raising concerns was poor for three events
[October 2003 below RCS Minimum Temperature for Critical Operation, June 2005 slow to isolate SI accumulator during shutdown transient, August 2005 slow to isolate Si accumulator during shutdown for ESW pin hole leak down power]. As a result problems were not promptly identified and corrected by the operations shift manager, the operations manager, the employee concerns program manager, or quality assurance organization or regulatory affairs.
RPBB Inspect N N 4 Alleger claims discrimination for having raised safety 10 CFR 50.7 concerns in the form of having his SRO license terminated.
ACES Offer Early ADR N N Revised 5/22/02
EARLY ADR CHECKLIST Allegation No. RIV-2007-A-0028 The NRC's ADR Pilot Program requires the ARB to determine whether an individual has made a prima facie case of discrimination before early ADR is offered to the individual.
The following checklist should be used in presenting early ADR recommendations to the ARB.
ACES should work with Regional Counsel, as necessary, in collecting the necessary information from the alleger and in making recommendations to the ARB.
Answer the following questions based solely on the information provided by the individual making the assertions. No independent investigation should be done to determine the veracity of the statements.
- 1. Did the individual engage in protected activity (i.e., raise nuclear safety concerns or any concern that may impact anything that is under NRC jurisdiction)? Yes If so, how? In 2005, the alleger raised and pushed an issue regarding clarification of isolating the SI accumulators.
- 2. Was management aware of the protected activity? Yes If so, how did management become aware? He raised the issue to his management, the CAP, the ECP, and to senior management.
- 3. Was the individual subjected to adverse action? Yes If so, what was it? The licensee terminated the alleger's SRO license in June 2006.
- 4. Is there an inference that the adverse action was taken because of protected activity? Yes If so, how are they connected? The alleger believes that the licensee terminated his SRO license because he raise the and pushed for resolution of the SI accumulator isolation issue. Alleger had been issued the SRO licensee only 2 years earlier.
I From: Harry Freeman 6 To: R4ALLEGATION Date: 3/30/2007 10:27:47 AM
Subject:
07028 Phone Call With Alleger 072907 On March 29, 2007, Linda Smith, Vincent Gaddy and I contacted the alleger to clarify his SCWE concerns. The following provides clarifying information regarding his concerns.
The alleger described an issue he raised in 2005 regarding a statement in the FSAR that indicates that at approximately 425 F and 1000 pounds, that the Sl accumulators would be isolated. Apparently, the corrective action process took a long time to address this issue and the ECP program was of little help coming to resolution. The issue was eventually resolved and the NRC does not need to address the technical aspects of the issue.
The alleger claimed discrimination for having raised safety concerns related to the SI accumulator issue above. The licensee advised the NRC that this individual and 2 others did not need to maintain their SRO licensee in August 2006. The alleger believes that the reason he lost his license was at least in part because he kept pushing to have his SI accumulator issue addressed. He stated that the other two individuals received better bonus (?) than he did and it was only after he complained to the ECP (that he was being subjected to discrimination) that the license decided to offer him the same bonus. The alleger still wanted the ECP to investigate why his license was removed but they did not conduct any investigation.
Regarding the October 2003 shutdown issue, the alleger believes that there should have been a lessons learned on the issue, which could have prevented similar June 200,5_suhj down the personal relationship tha b)(7)c , , as with b) 7
__ii......i lhat he has not and will not pe orm an adequate investigation.
-Thehalleger sTa~d a e inot believe that the actions taken at the time violated TS or jeopardized plant safety.
He clarified his SCWE concern as follows. The environment for raising concerns was poor for three events [October 2003 below RCS Minimum Temperature for Critical Operation, June 2005 slow to isolate Sl accumulator during shutdown transient, August 2005 slow to isolate SI accumulator during shutdown for ESW pin hole leak down power]. As a result problems were not promptly identified and corrected by the operations shift manager, the operations manager, the employee concerns program manager, or quality assurance organization or regulatory affairs. The concerned individual planned to provide a copy of CAR 2007 0 1278 to the resident inspectors. This CAR documented a review of 9 reactor shutdowns for similar issues.
The alleger did not object to referral of his issues to the licensee by the NRC.