ML073120366
| ML073120366 | |
| Person / Time | |
|---|---|
| Site: | Peach Bottom |
| Issue date: | 10/14/2007 |
| From: | Balboa A - No Known Affiliation |
| To: | Annette Vietti-Cook Office of Public Affairs, NRC/SECY |
| References | |
| EDATS: SECY-2007-0505, G20070704, G20070736, G20070778, G20070785, LTR-07-0750, SECY-2007-0505 | |
| Download: ML073120366 (6) | |
Text
EDO Principal Correspondence Control FROM:
DUE: 11/30/07 EDO CONTROL: G20070785 DOC DT: 10/14/07 FINAL REPLY:
Alex Balboa Bel Air, Maryland TO:
Vietti-Cook, SECY FOR SIGNATURE OF GRN CRC NO: 07-0750 Zimmerman, NSIR DESC:
ROUTING:
Security Issues at Peach Bottom (EDATS: SECY-2007-0505)
Reyes Virgilio Mallett Ash Ordaz Cyr/Burns Dyer, NRR Carpenter, OE Caldwell, RIII
- Sosa, OEDO DATE: 11/07/07 ASSIGNED TO:
NSIR CONTACT:
Zimmerman SPECIAL INSTRUCTIONS OR REMARKS:
Ref. G20070778, G20070736, G20070704.
NOTE:
Immediate release to public in ADAMS per SECY.
OEDO POC:
Belkys Sosa
EDATS Number: SECY-2007-0505 Source: SECY GeerlInoraio Assigned To: NSIR Other Assignees:
Subject:
Security Issues at Peach Bottom
==
Description:==
OEDO Due Date: H1/30/2007 5:00 PM SECY Due Date: 11/30/2007 5:00 PM CC Routing: NRR; OE; Region III; OGC ADAMS Accession Numbers -
Incoming: NONE Response/Package: NONE Oh I
.r t Cross Reference Number: G20070785, LTR-07-0750, Staff Initiated: NO G20070778, G20070736, G20070704 Related Task:
Recurring Item: NO File Routing: EDATS Agency Lesson Learned: NO Roadmap Item: NO Prcs Information Action Type: Letter Priority: Medium
.Sensitivity: None Signature Level: NSIR Urgency:
OEDO Concurrence: NO OCM Concurrence: NO OCA Concurrence: NO Special Instructions: Ref. G20070778, G20070736, G20070704. Note: Immediate release to public in ADAMS per SECY. OEDO POC: Belkys Sosa NO Documen Infomaion Originator Name: Alex Balboa, Bel Air, Maryland Originating Organization: Citizens Addressee: Annette Vietti-Cook, SECY Incoming Task Received: E-mail Date of Incoming: 10/14/2007 Document Received by SECY Date: 11/7/2007 Date Response Requested by Originator: NONE Page 1 of I
OFFICE OF THE SECRETARY CORRESPONDENCE CONTROL TICKET Date Printed: Nov 07, 2007 09:34 PAPER NUMBER:
ACTION OFFICE:
LTR-07-0750 EDO LOGGING DATE:
11/07/2007 AUTHOR:
AFFILIATION:
ADDRESSEE:
Alex Balboa MD Annette Vietti-Cook
SUBJECT:
Concerns security at Peach Bottom ACTION:
DISTRIBUTION:
LETTER DATE:
ACKNOWLEDGED SPECIAL HANDLING:
Direct Reply Chairman, Comrs, SECY to Ack 10/14/2007 No Made publicly available in ADAMS via EDO/DPC NOTES:
FILE LOCATION:
ADAMS 11/30/2007 DATE DUE:
DATE SIGNED:
EDO -- G20070785
jqsý egy
ýýýýpgnaencemaili-uen.te.rl-"ulonce-rn.s....................
on.erns..
'age, 1,i From:
"Alex Balboa" <alexbalboaus@yahoo.com>
To:
"The Honorable Annette L. Vietti-Cook" <opa@nrc.gov>
Date:
Sun, Oct 14, 2007 10:43 AM
Subject:
Concerns Alex Balboa 1996 Waverly Drive Bel Air, MD 21015-1100 October 14, 2007 The Honorable Annette L. Vietti-Cook Secretary of the Commission 11545 Rockville Pk.
Rockville, MD 20852 Secretary Vietti-Cook:
I was reading the latest The Examiner article "NRC faulted for failing to respond to napping complaints" (Kelsey Volkmann, 2007-10-06) with great interest when I came across the following sentences:
.A whistler-blower sent a letter in February tipping off the Nuclear Regulatory Commission about guards sleeping on duty at Peach Bottom Atomic Power Station....But only after a guard sent a videotape proving the claims to a New York TV station did the NRC dispatch inspectors to Peach Bottom -
eight months after the initial complaints.... "This cannot be tolerated at all," said U.S. Sen. Ben Cardin, who grilled NRC members at a Senate hearing this week...."1 think they should be aggressive in monitoring what has happened. It's very concerning that the security guard had to go to the press. It shows a lack of confidence that the NRC is an independent entity."...Exelon Corp., the company that operates Peach Bottom nuclear plant, just across the Harford County line in Pennsylvania, has since said it would not renew a contract with Wackenhut Corp. for security guards....But Exelon uses Wackenhut security guards at its nine other power plants throughout the nation, including two others in Pennsylvania: Three Mile Island, 40 miles north of Peach Bottom, and Limerick, 30 miles northeast of Philadelphia. At both of those plants, watchdog groups say, guards also have nodded off while working 72-hour weeks....Veteran guards at Three-Mile Island showed new ones the best locations for taking a nap, according to an internal memo obtained by The Harrisburg Patriot-News...."With three occasions, this starts to look like a pattern," said John Kang, head investigator for the Service Employees International Union, which represents the most security guards in the nation...."We are wondering why it's not more obvious to Exelon to remove this company."...Some guards at Three Mile Island, which experienced a the nation's worst nuclear meltdown in 1979, recently reported working 150 hours0.00174 days <br />0.0417 hours <br />2.480159e-4 weeks <br />5.7075e-5 months <br /> in a 14-day period, said Kang, who also raised concerns about the commission's response to the complaints of sleeping at Peach Bottom...."It's very sad if the NRC, the official agency responsible for government oversight, can't respond adequately to a real concern brought forth by a worker," Kang said. "It's very concerning that no one is actually minding the store."...Richard Ayers, emergency manager for Harford County, said he didn't know a guard alerted the commission to
-Uds~ecyorresPonauenceMaiIUenter-uoncerns
-ageI co-workers' sleeping as long ago as March...."If I find out that there was sleeping going on in March, all the counties will be concerned," he said. "I don't know why an investigation couldn't be done."...TIMELINE
...January 2006: Reports surface about veteran guards showing newbies where to nap at Three Mile Island, according to media reports....July 2006: Overworked guards also nod off at Limerick power plant, watchdog groups say.... February 2007: Guard sends letter to Nuclear Regulatory Commission about napping co-workers at Peach Bottom....September 2007:
Tipster sends video of napping guards at Peach Bottom to WCBS in New York, which airs footage. NRC launches probe at Peach Bottom; Exelon, the company that operates the plant, cancels security guard contract with Wackenhut Corp.
Please review and implement an action plan to thoroughly address this extremely troubling issue. Media reports continue to underscore alleged widespread logistical and operational mismanagement of Peach Bottom Atomic Power Station, York County, PA, potentially putting the residents of Harford County, State of Maryland at high risk from safety and health concerns, despite strong documentation indicating such problems exist.
Please coordinate, collaborate and cooperate on Federal, State and/or local jurisdictional levels in addressing these concerns potentially impacting adversely the public's safety, health, finances, policies, trust, confidence, and quality of life issues. Thank you for your time in this matter and hope to hear from you soon.
Sincerely, Alex Balboa 1996 Waverly Drive Bel Air, MD 21015-1100 Sincerely, Alex Balboa
-:\\temp\\UWyUUU. i mI-Hg Fiage Mail Envelope Properties (47122AD9.04E : 18: 49230)
Subject:
Creation Date From:
Created By:
Concerns Sun, Oct 14, 2007 10:42 AM "Alex Balboa" <alexbalboa_us @yahoo.com>
alexbalboaus@yahoo.com Recipients nrc.gov TWGWPO02.HQGWDO01 OPA0 Post Office TWGWPO02.HQGWDO01 Route nrc.gov Files MESSAGE Mime.822 Options Expiration Date:
Priority:
ReplyRequested:
Return Notification:
Concealed
Subject:
Security:
Size 4404 5613 Date & Time Sunday, October 14, 2007 10:42 AM None Standard No None No Standard 1,