November 26, 2007 Mr. David A. Christian President and Chief Nuclear Officer Virginia Electric and Power Company Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711
SUBJECT:
MILLSTONE POWER STATION, UNIT NO. 2 - NRC RECEIPT OF RESPONSE TO GENERIC LETTER 2006-03, POTENTIALLY NONCONFORMING HEMYC AND MT FIRE BARRIER CONFIGURATIONS (TAC NO. MD1598)
Dear Mr. Christian:
The U.S. Nuclear Regulatory Commission (NRC) acknowledges the receipt of your responses dated June 8, 2006, and May 31, 2007, to NRC Generic Letter 2006-03 (GL 2006-03),
Potentially Nonconforming Hemyc and MT Fire Barrier Configurations. The aforementioned documents can be found in the Agencywide Documents Access and Management System (ADAMS) Accession Nos. ML061590505, ML071520515, and ML053620142, respectively.
You have stated that Millstone Power Station, Unit No. 2, does not rely on either the Hemyc or MT fire barrier system. You have also submitted documentation that 1 or 3-hour fire barriers, other than Hemyc or MT barriers, that separate redundant safe shutdown trains located within the same fire area have been designed and installed in accordance with current NRC guidance.
Based on your response, no further action is requested of you at this time and TAC No.
MD1598 will be closed.
If you have any questions regarding this response, please contact me at 301-415-3204.
Sincerely,
/ra/
John D. Hughey, Project Manager Plant Licensing Branch 1-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-336 cc: see next page
November 26, 2007 Mr. David A. Christian President and Chief Nuclear Officer Virginia Electric and Power Company Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711
SUBJECT:
MILLSTONE POWER STATION, UNIT NO. 2 - NRC RECEIPT OF RESPONSE TO GENERIC LETTER 2006-03, POTENTIALLY NONCONFORMING HEMYC AND MT FIRE BARRIER CONFIGURATIONS (TAC NO. MD1598)
Dear Mr. Christian:
The U.S. Nuclear Regulatory Commission (NRC) acknowledges the receipt of your responses dated June 8, 2006, and May 31, 2007, to NRC Generic Letter 2006-03 (GL 2006-03),
Potentially Nonconforming Hemyc and MT Fire Barrier Configurations. The aforementioned documents can be found in the Agencywide Documents Access and Management System (ADAMS) Accession Nos. ML061590505, ML071520515, and ML053620142, respectively.
You have stated that Millstone Power Station, Unit No. 2, does not rely on either the Hemyc or MT fire barrier system. You have also submitted documentation that 1 or 3-hour fire barriers, other than Hemyc or MT barriers, that separate redundant safe shutdown trains located within the same fire area have been designed and installed in accordance with current NRC guidance.
Based on your response, no further action is requested of you at this time and TAC No.
MD1598 will be closed.
If you have any questions regarding this response, please contact me at 301-415-3204.
Sincerely,
/ra/
John D. Hughey, Project Manager Plant Licensing Branch 1-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-336 cc: see next page DISTRIBUTION:
Public LPL1-2 r/f RidsNrrDorlLpl1-2 RidsNrrPMJHughey RidsNrrLAABaxter RidsOgcRp RidsRgn1MailCenter RidsNrrDorlDpr RidsAcrsAcnwMailCenter AKlein TDinh Accession Number: ML073060199 OFFICE LPL1-2/GE LPL1-2/PM LPL1-2/LA AFPB/BC LPL1-2/BC NAME CSanders JHughey ABaxter AKlein HChernoff DATE 11/08/2007 11/08/2007 11/08/2007 11/14/2007 11/26/2007 Official Record Copy
Millstone Power Station, Unit No. 2 cc:
Lillian M. Cuoco, Esquire Senior Counsel Dominion Resources Services, Inc.
Building 475, 5th Floor Rope Ferry Road Waterford, CT 06385 Edward L. Wilds, Jr., Ph.D.
Director, Division of Radiation Department of Environmental Protection 79 Elm Street Hartford, CT 06106-5127 Regional Administrator, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 First Selectmen Town of Waterford 15 Rope Ferry Road Waterford, CT 06385 Charles Brinkman, Director Washington Operations Nuclear Services Westinghouse Electric Company 12300 Twinbrook Pkwy, Suite 330 Rockville, MD 20852 Senior Resident Inspector Millstone Power Station c/o U.S. Nuclear Regulatory Commission P.O. Box 513 Niantic, CT 06357 Mr. J. Alan Price Site Vice President Dominion Nuclear Connecticut, Inc.
Building 475, 5th Floor Rope Ferry Road Waterford, CT 06385 Mr. J. W. "Bill" Sheehan Co-Chair NEAC 19 Laurel Crest Drive Waterford, CT 06385 Mr. Evan W. Woollacott Co-Chair Nuclear Energy Advisory Council 128 Terry's Plain Road Simsbury, CT 06070 Ms. Nancy Burton 147 Cross Highway Redding Ridge, CT 00870 Mr. Chris L. Funderburk Director, Nuclear Licensing and Operations Support Dominion Resources Services, Inc.
Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711 Mr. William D. Bartron Licensing Supervisor Dominion Nuclear Connecticut, Inc.
Building 475, 5th Floor Rope Ferry Road Waterford, CT 06385 Mr. Joseph Roy, Director of Operations Massachusetts Municipal Wholesale Electric Company Moody Street P.O. Box 426 Ludlow, MA 01056