November 8, 2007 LICENSEE: Entergy Nuclear Operations, Inc.
FACILITY: Indian Point Nuclear Generating Unit Nos. 2 and 3
SUBJECT:
SUMMARY
OF SITE AUDIT RELATED TO THE REVIEW OF THE LICENSE RENEWAL APPLICATION FOR INDIAN POINT NUCLEAR GENERATING UNIT NOS. 2 AND 3 From September 10-13, 2007, and September 24-27, 2007, a review team consisting of the U.S. Nuclear Regulatory Commission (NRC) staff and contractors from Earthtech and Pacific Northwest National Laboratory (PNNL), participated in a site audit at the Indian Point Nuclear Generating Unit Nos. 2 and 3 (Indian Point) related to the environmental review of the Indian Point license renewal application (LRA). The primary goal of the site audit was to review documentation, gather information to ensure that environmental requirements of license renewal as codified in Title 10 of the Code of Federal Regulations Part 51 (10 CFR Part 51) are met, and to interface with officials in Federal, State and local government agencies to obtain related information.
is a list of NRC, PNNL, State of New York, Federal agency and Entergy Nuclear Operations, Inc. (Entergy) representatives who participated in the site audit. Enclosure 2 is a table of documents requested by the NRC to assist the staff in its review of the Indian Point Environmental Report.
On the opening Monday of both portions of the audit, the environmental review teams participated in general site tours of the Indian Point site with Entergy staff. The general site tours focused on areas relevant to the environmental review, including the intake structure, discharge canal, water sampling locations, groundwater monitoring sites, site structures, and the site environs. During the remainder of both portions of the site audit, the team members examined the data used by Entergy in preparation of the Environmental Report, met with local government officials and met with Entergy representatives with corresponding environmental expertise in smaller groups.
These groups participated in various activities, including tours off-site, environmental sampling locations, the intake structures, and the discharge canal. During a boat tour, team members examined the intake structure, the discharge canal, the riverine areas upstream and downstream of Indian Point, and other electric generating stations. Team members met onsite with officials from the New York Department of Environmental Conservation, New York Department of State, and with a representative of the National Marine Fisheries Service. Additionally, team members met offsite with non-governmental organizations, and State officials in Albany, New York.
Information gathered through these offsite meetings will assist the environmental review team in its evaluation. Entergy representatives and its contractors provided a brief presentation on its on-going studies associated with groundwater and aquatic resources.
At the conclusion of both portions of the site audit, the NRC staff and its contractors summarized the status of the review with Entergy representatives. NRC indicated that additional information will be needed to evaluate the Environmental Report (Enclosure 2).
The NRC staff indicated that, with the exception of items listed in Enclosure 2, the review team did not identify any significant issues during its site visit or during offsite visits with Federal, State, and local agencies. However, the NRC staff further indicated that the review was ongoing and that any additional information necessary to support the review would be formally requested as a request for additional information.
/RA/
Jill S. Caverly, Project Manager Projects Branch 2 Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-247 and 50-286
Enclosures:
As stated cc w/encls: See next page At the conclusion of both portions of the site audit, the NRC staff and its contractors summarized the status of the review with Entergy representatives. NRC indicated that additional information will be needed to evaluate the Environmental Report (Enclosure 2).
The NRC staff indicated that, with the exception of items listed in Enclosure 2, the review team did not identify any significant issues during its site visit or during offsite visits with Federal, State, and local agencies. However, the NRC staff further indicated that the review was ongoing and that any additional information necessary to support the review would be formally requested as a request for additional information.
/RA/
Jill S. Caverly, Project Manager Projects Branch 2 Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-247 and 50-286
Enclosures:
As stated cc w/encls: See next page Adams Accession No.: ML073050267 OFFICE LA:DLR:RPOB PM:DLR:RPB2 PM:DLR: RPB2 BC:DLR: RPB2 NAME SFigueroa JCaverly BPham RFanovich (BPham for)
DATE 11/02/07 11/06/07 11/06/07 11/08/07
LIST OF ON-SITE PARTICIPANTS FOR INDIAN POINT NUCLEAR GENERATING UNIT NOS. 1 AND 2 ENVIRONMENTAL SITE AUDIT SEPTEMBER 10-14, 2007 AND SEPTEMBER 24-27, 2007 PARTICIPANT AFFILIATION Jill Caverly U.S. Nuclear Regulatory Commission (NRC)
Bo Pham NRC Eric Benner NRC Dennis Beissel NRC Jenny Davis NRC Dennis Logan NRC Harriet Nash NRC Elizabeth Wexler NRC Jeff Rikoff NRC Andrew Steyvenberg NRC Steve Klemenowiccz NRC Bobbie Hurley Earthtech Nicole Spangle Earthtech Steve Duda Earthtech Jeff Ward Pacific Northwest National Laboratory (PNNL)
Lance Vail PNNL Chris Hogan New York Department of Environmental Conservation (NYDEC)
Larry Wilson NYDEC Tim Rice NYDEC Larry Rosenmann NYDEC Arthur Crawford NYDEC Pat Scida National Marine Fisheries Service Andrew Kasius New York Department of State (NYDS)
Jeff Zappieri NYDS Jill Brochu Entergy Nuclear Operations, Inc. (Entergy)
Tom McCaffrey Entergy Joe Perrotta Entergy Paul Studley Entergy Don Mayer Entergy Pay Conroy Entergy Tom Vitale Entergy Tom Orlando Entergy Dan Wilson Entergy Dara Gray Entergy Rick Buckley Entergy Jim Thoma Entergy
PARTICIPANT AFFILIATION Patrick Donahue Entergy Chuck Barlow Entergy Mike Rogers Entergy Don Croulet Entergy Garry Young Entergy John Curry Entergy Mike Stroud Entergy Charles Jackson Entergy Bill Josiger Entergy Bob Walpole Entergy Mark Mattson Normandeau Associates Inc.
Mike Krumland Nebraska Public Power District Paul Jacobson Alion Science and Technology Rich Gallagher Dominion
ADDITIONAL INFORMATION NEEDS IDENTIFIED AT INDIAN POINT NUCLEAR GENERATING UNIT NOS. 1 AND 2 ENVIRONMENTAL SITE AUDIT SEPTEMBER 10-14, 2007 AND SEPTEMBER 24-27, 2007 Additional Information Needs Identified During Audit 9/10/07 - 9/13/07& 9/24-26 1
A copy of the Indian Point Site Audit Information Needs addressed at site audit.
2 Discharge Monitoring Reports.
3 An electronic version of site maps. Enercon Services, Inc., Site Exclusion Area and Features. Prefer CAD file, but PDF or equivalent is okay.
4 ESSA Reports as cited in the FEIS.
5 Quarterly SPDES reports 6
Map of well locations 7
Occupational Exposure Report for 2006 8
Excerpts from Annual Fleet Reports to documenting thermal non-exceedences 9
Entergy Nuclear Review of New & Significant Information for IP 2 & 3 10 Slide Presentations: Hudson River Fish Populations and Communities: a 30-year Perspective (modify this presentation to include units on the graphs),
Sampling Design Overview for IP NRC Briefing, and SPDES History.
11 When available: Barnthouse, et al, 2007. Adverse Environmental Impact Report.
12 Environmental Review for Spent Fuel Storage Area 13 Memorandum in support of state respondents motion to consolidate and dismiss petitions 14 When available: GZAs Final Report 15 Documentation that IP will conduct triaxial thermal study 16 Supporting information pertaining to the Hudson River Studies conducted by the applicant 17 Impingement Data (at a minimum data from units 2 & 3; 1975-1980; 1981-1990) 18 Supplemental Ristroph studies from 1985 and 1985-1991 19 Entrainment Abundance Data 1981, 1983, 1985-1987 20 Entrainment Survival Studies (1979, 1980, 1988) 21 Met Data Summary Report for 2006 22 Entergy Nuclear Waste Minimization Plan 23 Explanation of Balmville Limestone versus Inwood Marble 24 Program to ensure no electromagnetic shock issues going forward.
25 Electromagnetic fields - Acute Effects - Provide information on induced shocked studies (include calculation reference). Provide information on periodic verification
Memo to Entergy Nuclear Operations, Inc. from J. Caverly dated November 8, 2007
SUBJECT:
SUMMARY
OF SITE AUDIT RELATED TO THE REVIEW OF THE LICENSE RENEWAL APPLICATION FOR INDIAN POINT NUCLEAR GENERATING, UNIT NOS. 2 AND 3 DISTRIBUTION:
HARD COPY:
DLR RF JCaverly E-MAIL:
PUBLIC SSmith (srs3)
SDuraiswamy RidsNrrDlr RidsNrrDlrRlra RidsNrrDlrRlrb RidsNrrDlrRlrc RidsNrrDlrReba RidsNrrDlrRebb RidsNrrDci RidsNrrDra RidsNrrDe RidsNrrDeEemb RidsNrrDeEeeb RidsNrrDss RidsOgcMailCenter RidsNrrAdes BPham JCaverly KGreen RFranovich RAuluck MKowal JBoska ECobey, RI RConte, RI MCox, RI DJackson, RI BWittick, RI NSheehan, RI OPA DScrenci, RI OPA SBurnell, OPA DMcIntyre, OPA RShane, OCA UShoop, OEDO
Indian Point Generating Unit Nos. 2 and 3 cc:
Mr. Michael R. Kansler President & CEO/CNO Entergy Nuclear Operations, Inc.
1340 Echelon Parkway Jackson, MS 39213 Mr. John T. Herron Senior Vice President Entergy Nuclear Operations, Inc.
1340 Echelon Parkway Jackson, MS 39213 Sr. Vice President Engineering & Technical Services Entergy Nuclear Operations, Inc.
1340 Echelon Parkway Jackson, MS 39213 Mr. Fred R. Dacimo Site Vice President Entergy Nuclear Operations, Inc.
Indian Point Energy Center 450 Broadway, GSB P.O. Box 249 Buchanan, NY 10511-0249 Mr. Anthony Vitale - Acting General Manager, Plant Operations Entergy Nuclear Operations, Inc.
Indian Point Energy Center 450 Broadway P.O. Box 249 Buchanan, NY 10511-0249 Mr. Oscar Limpias Vice President Engineering Entergy Nuclear Operations, Inc.
1340 Echelon Parkway Jackson, MS 39213 Mr. Joseph P. DeRoy Vice President, Operations Support Entergy Nuclear Operations, Inc.
1340 Echelon Parkway Jackson, MS 39213 Mr. John A. Ventosa GM, Engineering Entergy Nuclear Operations, Inc.
440 Hamilton Avenue White Plains, NY 10601 Mr. John F. McCann Director, Nuclear Safety & Licensing Entergy Nuclear Operations, Inc.
440 Hamilton Avenue White Plains, NY 10601 Ms. Charlene D. Faison Manager, Licensing Entergy Nuclear Operations, Inc.
440 Hamilton Avenue White Plains, NY 10601 Mr. Ernest J. Harkness Director, Oversight Entergy Nuclear Operations, Inc.
1340 Echelon Parkway Jackson, MS 39213 Mr. Patric W. Conroy Director, Nuclear Safety Assurance Entergy Nuclear Operations, Inc.
Indian Point Energy Center 450 Broadway, GSB P.O. Box 249 Buchanan, NY 10511-0249 Mr. T.R. Jones - Acting Manager, Licensing Entergy Nuclear Operations, Inc.
Indian Point Energy Center 450 Broadway, GSB P.O. Box 249 Buchanana, NY 10511-0249 Mr. William C. Dennis Assistant General Counsel Entergy Nuclear Operations, Inc.
440 Hamilton Avenue White Plains, NY 10601
Indian Point Generating Unit Nos. 2 and 3 cc:
Mr. Michael Balboni Deputy Secretary for Public Safety State Capitol, Room 229 Albany, NY 12224 Mr. John P. Spath New York State Energy, Research and Development Authority 17 Columbia Circle Albany, NY 12203-6399 Mr. Paul Eddy New York State Department of Public Service 3 Empire State Plaza Albany, NY 12223-1350 Regional Administrator, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Senior Resident Inspectors Office Indian Point 2 U.S. Nuclear Regulatory Commission P.O. Box 59 Buchanan, NY 10511 Senior Resident Inspectors Office Indian Point 3 U.S. Nuclear Regulatory Commission P.O. Box 59 Buchanan, NY 10511 Mr. Charles Donaldson, Esquire Assistant Attorney General New York Department of Law 120 Broadway New York, NY 10271 Mayor, Village of Buchanan 236 Tate Avenue Buchanan, NY 10511 Mr. Raymond L. Albanese Four County Coordinator 200 Bradhurst Avenue Unit 4 Westchester County Hawthorne, NY 10532 Mr. William DiProfio PWR SRC Consultant 48 Bear Hill Road Newton, NH 03858 Mr. Garry Randolph PWR SRC Consultant 1750 Ben Franklin Drive, 7E Sarasota, FL 34236 Mr. William T. Russell PWR SRC Consultant 400 Plantation Lane Stevensville, MD 21666-3232 Mr. Jim Riccio Greenpeace 702 H Street, NW Suite 300 Washington, DC 20001 Mr. Phillip Musegaas Riverkeeper, Inc.
828 South Broadway Tarrytown, NY 10591 Mr. Mark Jacobs IPSEC 46 Highland Drive Garrison, NY 10524 Ms. Julie Keys Nuclear Energy Institute 1776 I Street, NW, Suite 400 Washington, DC 20006-3708 The Honorable Nita Lowey 222 Mamaroneck Avenue, Suite 310 White Plains, NY 10605
Indian Point Generating Unit Nos. 2 and 3 cc:
Ms. Kathryn M. Sutton, Esq.
Morgan, Lewis & Bockius, LLP 1111 Pennsylvania Avenue, NW Washington, DC 20004 Mr. Paul M. Bessette, Esq.
Morgan, Lewis & Bockius, LLP 1111 Pennsylvania Avenue, NW Washington, DC 20004 Mr. Martin J. O'Neill, Esq.
Morgan, Lewis & Bockius, LLP 1111 Pennsylvania Avenue, NW Washington, DC 20004 Mr. William J. Ryan, Chairman Westchester County Board of Legislators 800 Michaelian Office Building 148 Martine Avenue White Plains, NY 10601 Mr. Thomas J. Abinanti, Chair Committee on Environment & Energy Westchester County Board of Legislators 800 Michaelian Office Building 148 Martine Avenue White Plains, NY 10601 Mr. Michael B. Kaplowitz, 4th District Legislator Westchester County Board of Legislators 800 Michaelian Office Building 148 Martine Avenue White Plains, NY 10601 Mr. Jerry Nappi New York Affordable Reliable Electricity Alliance 707 Westchester Avenue, Suite 302 White Plains, NY 10604 Ms. Susan Thaler The Field Library 4 Nelson Avenue Peekskill, NY 10566 Ms. Patricia Thorsen White Plains Public Library 100 Martine Avenue White Plains, NY 10601 Ms. Risa Getman Hendrick Hudson Free Library 185 Kings Ferry Road Montrose, NY 10548 Mr. John Sipos, Assistant Attorney General Office of the Attorney General The Capitol State Street Albany, NY 12224