E-Mail from Ulie to Gavula, Davis-Besse Conference Call at 1100 Est, 1000 CST Today
ML073030328
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 03/09/2007
From: Ulie J
NRC/OI/RGN-III/FO
To: James Gavula
NRC/OI/RGN-III/FO
References
FOIA/PA-2007-0240
Download: ML073030328 (3)


Text

irnes Gavula,- Fwd: Re: DB Conference Call at 1100 EST, 1000 CST Today. Page 11 From: Joseph Ulie 0 f!

To: James Gavula Date: 03/09/2007 11:38:05 AM

Subject:

Fwd: Re: DB Conference Call at 1100 EST, 1000 CST Today.

Have you shared the attached with DOJ?

Informatlon Inthis record woe deleted In a.ý,ccdac wft the F dQMOfft inWM*fiQ"f A04 Exefflptiofls pOILANPA

Today. Pacje 1 I

,rues Gavula- Fwd:

mes Gavula'- Re: DB Fwd: Re: Conference Call DB Conference at 1100 Call at 1000 CST EST, 1000 1100 EST, CST Today. Page 1 1v From: Charles Well To: Bradley Jones; Cynthia Carpenter; Doug Starkey; Gary Shear; James Gavula; James Luehman; Jared Heck; Joseph Ulie; Kenneth O'Brien; Lisa Clark; Mary Baty; Michele Janicki; Robert Pascarelli; Scott Langan Date: 03/09/2007 9:51:15 AM

Subject:

Fwd: Re: DB Conference Call at 1100 EST, 1000 CST Today.

b)(5)

The letter is from an insurance company for Davis-Besse and discusses the vessel head wastage at Davis-Besse and includes a discussion about the adequacy of the conclusion in the Root Cause Report and other documents associated with that issue. Particular information in the attachment indicates, "the development of the large crack at Davis-Besse Nozzle 3 and the subsequent wastage cavity development in a much shorter time frame that the root cause report concluded ......

Chuck

>>> James Heller 3/9/2007 9:33 AM >>>

Jim

>>> Melvin Holmberg 03/09/2007 8:24 AM >>>

To all, A call will be held with FENOC (Davis Besse Licensee) today at 11:00 EST to discuss a letter from their insurer alleging a safety-concern based upon work by "Eponent Failure Analysis Associates and Altran Solutions Corporation" which concluded that the Davis Besse head wastage cavity could have formed in just a few weeks. Further, this report alleges both crack growth rates and head material erosion rates are "significantly higher than previously assumed." Because of the generic ramifications we would like to have appropriate NRR & RES staff participate. We have not seen this report, but I have attached the insurer's letter.

Thank you

>>> David Hills (3/09/2007 8:09 AM >>>

Mel, Given the generic implications, it might be a good idea to give NRR the chance to listen in as well. Might save us a lot of trouble later passing on the info to them. I think Terrance and Matt are both out of the office today. Could you please see if there is someone else from the appropriate branch who could participate. I think John Sow (sp?) was mentioned as an acting there.

>>> Melvin Holmberg 03/09/2007 8:03 AM >>>

Will do.

>>> David Hills 03/09/2007 8:01 AM >>>

Mel, See below. Since you were more involved in Davis Besse than the other inspectors, would you be able to support this call? The purpose of this call would simply be information gathering, so we can understand the issue better.

_es %,.iVUidi - ru. nv. LJO I 1 1.II CL I VV L-0 I IU , I Ly. r a ' r-.I

>>> John Rutkowski 03/09/2007 6:35 AM >>>

Eric, Just got a call from the licensee that 1100 EST, 1000 CST looks good for a phone call on the NEIL letter.

Tentatively would be several people from the DB site and possibly 1 or 2 people from the company that produced the report for FE.

Tentatively (I will let you know if this changes) we will use the Beaver Valley Conference Bridge. Access number is 888-889-8137 (or non-toll free 724-682-1900). Authorization code is .li 9./

JER CC: James Heller; OEMAIL@nrc.gov

(