October 30, 2007 Mr. Michael Balduzzi Sr. Vice President, Regional Operations NE Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601

SUBJECT:

PALISADES PLANT - TEMPORARY BRANCH CHIEF REASSIGNMENT

Dear Mr. Balduzzi:

This letter is to inform you that effective October 28, 2007, Mr. Cliff Munson was temporarily assigned as the U.S. Nuclear Regulatory Commissions Branch Chief for Palisades Plant. Mr. Munson assumes all Palisades licensing oversight and supervisory duties previously held by Mr. Travis Tate. Mr. Munson may be reached at 301-415-2529 or via e-mail at cgm1@nrc.gov.

Sincerely,

/RA/

Timothy J. McGinty, Deputy Director Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-255 cc: See next page

Mr. Michael Balduzzi Sr. Vice President, Regional Operations NE Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601

SUBJECT:

PALISADES PLANT - TEMPORARY BRANCH CHIEF REASSIGNMENT

Dear Mr. Balduzzi:

This letter is to inform you that effective October 28, 2007, Mr. Cliff Munson was temporarily assigned as the U.S. Nuclear Regulatory Commissions Branch Chief for Palisades Plant. Mr. Munson assumes all Palisades licensing oversight and supervisory duties previously held by Mr. Travis Tate. Mr. Munson may be reached at 301-415-2529 or via e-mail at cgm1@nrc.gov.

Sincerely,

/RA/

Timothy J. McGinty, Deputy Director Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-255 cc: See next page DISTRIBUTION:

PUBLIC LPL3-1 R/F RidsNrrPMMChawla RidsNrrLATHarris RidsNrrDorlLPL3-1 RidsOgcRp RidsAcrsAcnwMailCenter RidsRgn3MailCenter RidsNrrOd RidsNrrAdro RidsNrrDorl LPerch Accession Number: ML073020584 OFFICE LPL3-1/PM LPL3-1/LA LPL3-1/(A)BC LPL3-1/DD NAME MChawla THarris CMunson TMcGinty DATE 10/29/07 10/26/07 10/29/07 10/ 30 /07 OFFICIAL AGENCY RECORD

Palisades Plant cc:

Supervisor Covert Township P. O. Box 35 Covert, MI 49043 Office of the Governor P. O. Box 30013 Lansing, MI 48909 U.S. Nuclear Regulatory Commission Resident Inspector's Office Palisades Plant 27782 Blue Star Memorial Highway Covert, MI 49043 Michigan Department of Environmental Quality Waste and Hazardous Materials Division Hazardous Waste and Radiological Protection Section Nuclear Facilities Unit Constitution Hall, Lower-Level North 525 West Allegan Street P.O. Box 30241 Lansing, MI 48909-7741 Michigan Department of Attorney General Special Litigation Division 525 West Ottawa St.

Sixth Floor, G. Mennen Williams Building Lansing, MI 48913 Mr. Michael R. Kansler President & CEO/CNO Entergy Nuclear Operations 1340 Echelon Parkway Jackson, MS 39213 Mr. John T. Herron Sr. Vice President Entergy Nuclear Operations 1340 Echelon Parkway Jackson, MS 39213 Sr. Vice President, Engineering and Technical Services Entergy Nuclear Operations, Inc.

1340 Echelon Parkway Jackson, MS 39213 Mr. Christopher J. Schwarz Site Vice President Entergy Nuclear Operations Palisades Nuclear Plant 27780 Blue Star Memorial Highway Covert, MI 49043 General Manager, Plant Operations Entergy Nuclear Operations Palisades Nuclear Plant 27780 Blue Star Memorial Highway Covert, MI 49043 Mr. Oscar Limpias Vice President, Engineering Entergy Nuclear Operations 1340 Echelon Parkway Jackson, MS 39213 Mr. John F. McCann Director, Nuclear Safety & Licensing Entergy Nuclear Operations 440 Hamilton Avenue White Plains, NY 10601 Ms. Charlene D. Faison Manager, Licensing Entergy Nuclear Operations 440 Hamilton Avenue White Plains, NY 10601 Mr. Ernest J. Harkness Director, Oversight Entergy Nuclear Operations 1340 Echelon Parkway Jackson, MS 39213

Mr. William C. Dennis Assistant General Counsel Entergy Nuclear Operations 440 Hamilton Avenue White Plains, NY 10601 Mr. Joseph P. DeRoy VP, Operations Support Entergy Nuclear Operations, Inc.

1340 Echelon Parkway Jackson, MS 39213 Ms. Laurie A. Lahti Manager, Licensing Palisades Nuclear Plant 27780 Blue Star Memorial Highway Covert, MI 49043 Mr. John A. Ventosa GM, Engineering Entergy Nuclear Operations 440 Hamilton Aveune White Plains, NY 10601 Director, NSA Palisades Nuclear Plant 27780 Blue Star Memorial Highway Covert, MI 49043 Mr. William DiProfio 48 Bear Hill Road Newton, NH 03858 Mr. William T. Russell 400 Plantation Lane Stevensville, MD 21666 Mr. Gary Randolph 1750 Ben Franklin Drive, 7E Sarasota, FL 34246