ML072900293

From kanterella
Jump to navigation Jump to search
Re NRC Office of Investigations Report Nos 3-2006-006 and 3-2006-026 (AMS File No. RIII-2005-A-0072)
ML072900293
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 10/15/2007
From: Pederson C
Division Reactor Projects III
To: Mccarthy J
Florida Power & Light Co
References
3-2006-006, 3-2006-026
Download: ML072900293 (5)


Text

October 15, 2007 Mr. James McCarthy Site Vice President Point Beach Nuclear Plant Florida Power and Light Company 6590 Nuclear Road Two Rivers, WI 54241-9516

SUBJECT:

NRC OFFICE OF INVESTIGATIONS REPORT NOS. 3-2006-006 and 3-2006-026

Dear Mr. McCarthy:

This letter refers to investigations conducted by the U.S. Nuclear Regulatory Commission (NRC),

Office of Investigations (OI) to determine whether a former Instrument and Controls (I&C)

Maintenance Supervisor at the Point Beach Nuclear Plant was discriminated against by management for raising safety concerns. Based on the evidence developed during the investigations, we did not substantiate the allegation. The synopses from the OI reports of investigation are enclosed.

If you have any questions or comments regarding this matter, please contact James Heller or Paul Pelke of the NRC Region III staff at telephone number (630) 829-9500.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter, its enclosure, and your response, if any, will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

You should note that final NRC documents, including the final OI reports, may be made available to the public under the Freedom of Information Act (FOIA) subject to redaction of information pursuant to the FOIA. Requests under the FOIA should be made in accordance with 10 CFR 9.23, Request for Records. The instructions for making a request for information under the FOIA are accessible at http://www.nrc.gov/reading-rm/foia/foia-request.html.

Sincerely,

/RA/

Cynthia D. Pederson, Director Division of Reactor Projects Docket Nos. 50-266; 50-301 License Nos. DPR-24; DPR-27

Enclosures:

OI Synopses

October 15, 2007 Mr. James McCarthy Site Vice President Point Beach Nuclear Plant Florida Power and Light Company 6590 Nuclear Road Two Rivers, WI 54241-9516

SUBJECT:

NRC OFFICE OF INVESTIGATIONS REPORT NOS. 3-2006-006 and 3-2006-026

Dear Mr. McCarthy:

This letter refers to investigations conducted by the U.S. Nuclear Regulatory Commission (NRC),

Office of Investigations (OI) to determine whether a former Instrument and Controls (I&C)

Maintenance Supervisor at the Point Beach Nuclear Plant was discriminated against by management for raising safety concerns. Based on the evidence developed during the investigations, we did not substantiate the allegation. The synopses from the OI reports of investigation are enclosed.

If you have any questions or comments regarding this matter, please contact James Heller or Paul Pelke of the NRC Region III staff at telephone number (630) 829-9500.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter, its enclosure, and your response, if any, will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

You should note that final NRC documents, including the final OI reports, may be made available to the public under the Freedom of Information Act (FOIA) subject to redaction of information pursuant to the FOIA. Requests under the FOIA should be made in accordance with 10 CFR 9.23, Request for Records. The instructions for making a request for information under the FOIA are accessible at http://www.nrc.gov/reading-rm/foia/foia-request.html.

Sincerely,

/RA/

Cynthia D. Pederson, Director Division of Reactor Projects Docket Nos. 50-266; 50-301 License Nos. DPR-24; DPR-27

Enclosures:

OI Synopses G:\\EICS\\AMS-LTRS\\050072.OI synopses to lic.wpd To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RIII N

RIII N

RIII N

RIII N

RIII N

NAME Pelke Cameron Langan*

Heck**

Pederson DATE 10/09/07 10/10/07 10/10/07 10/11/07 10/15/07 OFFICIAL RECORD COPY

  • For permission to release OI synopses.
    • The 3-week emails have expired.

Case No. 3-2006-006 Enclosure SYNOPSIS This investigation was initiated by the U.S. Nuclear Regulatory Commission, Office of Investigations, Region III, on November 15, 2005, to determine whether a former Instrument and Controls (I&C) Maintenance Supervisor at the Point Beach Nuclear Plant was discriminated against by management for raising safety concerns.

Based upon the evidence developed, this investigation did not substantiate the allegation that a former I&C Maintenance Supervisor was discriminated against by management for raising safety issues.

Case No. 3-2006-026 Enclosure SYNOPSIS This investigation was initiated by the U.S. Nuclear Regulatory Commission, Office of Investigations, Region III, on August 1, 2006, to determine whether a former Instrument and Control (I&C) Maintenance Supervisor at the Point Beach Nuclear Plant was discriminated against by management for raising safety concerns.

Based on the evidence developed, this investigation did not substantiate the allegation that a former I&C Maintenance Supervisor was discriminated against by Point Beach Nuclear Plant management for raising safety concerns.