Category:- No Document Type Applies
MONTHYEARML21211A1522021-10-0404 October 2021 Problem Identification & Resolution Inspection Document Request ML21194A0632021-07-13013 July 2021 Tabulation of Proposed Changes in License Amendment Request RS-20-140, Proposed Changes to Decommissioning Trust Agreements2020-10-30030 October 2020 Proposed Changes to Decommissioning Trust Agreements ML19135A1362019-05-15015 May 2019 Aam - Sign in Sheet ML18096A0102018-04-0404 April 2018 Annual Assessment Meeting 04/04/2018 Sign in Sheet ML16266A2302016-09-21021 September 2016 ASP Analysis Reject - Calvert Cliffs, Unit 2 Automatic Reactor Trip Due to Loss of Offsite Power to Safety Related Buses (LER-318-2015-002) ML15327A2242015-12-0101 December 2015 Strainer Head Loss Test 6 Rejection ML15114A3872015-04-16016 April 2015 4/16/2015 - Calvert Cliffs 2014 Annual Assessment Meeting Sign-In Sheet ML15051A4102015-02-17017 February 2015 Evaluation of Risk Significance of Permanent ILRT Extension ML15092A3752015-02-0202 February 2015 IP 95001 Entrance and Exit Meeting Attendance Sheets ML13364A2832013-12-30030 December 2013 Announcement of 2014 Generic Fundamentals Examination Administration Dates-Letter Dated Dec 30, 2013 ML13319A7252013-11-0404 November 2013 CCNPP-CHLE-009 Rev 2 Considerations for Using Marinite in CE Testing ML12349A2852012-11-0909 November 2012 Seismic Walkdown Checklist, 1A1 Diesel Engine - Page C-150 - Page C-243 ML12349A2842012-11-0909 November 2012 Seismic Wlakdown Checklists, Fuel Oil Storage Tink 21 - Page C-51 - Page C-149 ML12056A0522012-03-12012 March 2012 Enclosure 6 - List of Power Reactor Licensees and Holders of Construction Permits in Active or Deferred Status RS-11-167, Final Effective Joint Proxy Statement/Prospectus Relating to Application for Approval of Indirect Transfer of Control of Licenses2011-10-11011 October 2011 Final Effective Joint Proxy Statement/Prospectus Relating to Application for Approval of Indirect Transfer of Control of Licenses ML1127100332011-09-28028 September 2011 ROP Tabletop Examples and Results ML1120201642011-07-21021 July 2011 Operations Plan for Technical Assistance in Calvert Cliffs Independent Spent Fuel Storage Installation License Renewals, Rev. 2, Chg. 0 ML1002615342010-01-26026 January 2010 Attachment (1), SER Restrictions for Calvert Cliffs ML1001100642009-11-20020 November 2009 Biennial Problem Identification and Resolution Inspection Exit Meeting Roster for 11-20-2009, NRC Inspection Report 2009-007 ML0916003072009-06-0909 June 2009 Units, 1 & 2 - Response to Request for Additional Information Concerning Relief Request ISI-04-04 ML0915302742009-06-0101 June 2009 Response to Request for Additional Information Concerning Relief Request ISI-04-04, Attachment 1 ML0905704862009-02-26026 February 2009 Attachment (1), Summary of Calvert Cliffs, Unit 2 Deviation from MRP-139, Requirements ML0903706532009-02-0606 February 2009 Enclosure 1 - Problem Specification Sent to ORNL ML0903706662009-02-0606 February 2009 Enclosure 2 - Detailed Results Received from ORNL ML0836500592008-12-29029 December 2008 Response to Request for Additional Information Dated October 15, 2008 - Measurement Uncertainty Recapture Power Uprate ML0831703712008-11-12012 November 2008 Attachment 1, Alternative Pressure Boundary Requirements During Class 1 System Pressure Tests, Request for Alternative Relief Request PT-3-01 ML0817101052008-06-18018 June 2008 Attachment 1, Request for Extension of the Completion Date for Corrective Actions Related to Generic Letter 2004-02 ML0812303862008-05-0101 May 2008 Attachment (1) - Proposed Alternative ISI-020 in Accordance with 10 CFR 50.55a(a)(3)(i) - Alternative Provides Acceptable Level of Quality and Safety ML0810904932008-04-0808 April 2008 Annual Assessment Meeting Attendance List ML0734504992007-12-10010 December 2007 Attachment (1) Request for Extension of the Completion Date for Corrective Actions Related to Generic Letter 2004-02 ML0732400242007-10-25025 October 2007 Examples of Max Thermal Power License Conditions ML0726301142007-09-14014 September 2007 / P. Paquin Ltr Amendment to Certificate of Compliance No. 9208 for the Model No. 10-142B Package (TAC L24117)/S121170 ML0726303192007-09-14014 September 2007 P. Paquin Ltr Amendment to Certificate of Compliance No. 6574 for the Model No. 3-82B Package (TAC L24116)/ Register User List ML0729901542007-06-21021 June 2007 Inspection Request - Calvert Cliffs PI&R 2007-007 ML0715005442007-05-22022 May 2007 Attendance List for Calvert Cliffs Annual Assessment Meeting ML0727401082006-12-18018 December 2006 Differing Professional Opinion from E. Marinos ML0634705992006-12-14014 December 2006 Plant Service List ML0727105902006-06-0101 June 2006 Et/Lt Brief on the Status of the Measurement Uncertainty Recapture Issue ML0534604122005-11-18018 November 2005 Inspection Request Summary: Calvert Cliffs PI&R - IR 2005-07 ML0727104842005-11-15015 November 2005 Ufm Review Status and Anticipated Resolution Process ML0424005762004-08-18018 August 2004 72-8 Service List ML0404104922004-02-20020 February 2004 Order EA-03-009 Service List ML0331405822003-09-30030 September 2003 License Amendment Request: Increase the Unit 2 Spent Fuel Pool Maximum Enrichment Limit with Soluble Boron and Burnup Credit, Continuation of Attachment 5 Through 6 ML0331405812003-09-30030 September 2003 License Amendment Request: Increase the Unit 2 Spent Fuel Pool Maximum Enrichment Limit with Soluble Boron and Burnup Credit, Attachments 1 Through 5 ML0310504022003-03-31031 March 2003 Calvert Cliffs Annual Assessment Meeting NRC Public Meeting Feedback Form ML0309903832003-03-31031 March 2003 Annual Assessment Meeting Attendance List ML0203201882002-01-29029 January 2002 Attachment 1 to Ltr Dated 01/29/02 Re Calvert Cliffs Nuclear Power Plant Unit No. 2; Docket No. 50-318 Request for Regional Enforcement Discretion 2021-07-13
[Table view] |
Text
11/15/05 UFM REVIEW STATUS AND ANTICIPATED RESOLUTION PROCESS The staff approved topical reports that described the use of Caldon and Westinghouse I AMAG ultrasonic flow meters (UFMs) in 1999 and 2000, respectively, to allow reduction of the feedwater flowrate measurement uncertainty in order to reduce the original 10 CFR 50 Appendix K requirement of 2 percent over the licensed thermal power. Many licensees have received amendments for power uprates that relied upon these topical reports. Other licensees have used UFMs under 50.59 for power recovery by correcting for perceived venturi fouling. Several licensees have exceeded licensed thermal power when relying on AMAG UFMs for power recovery. Ft. Calhoun had to withdraw an amendment when it found it could not achieve the claimed uncertainty, and Calvert Cliffs has not explained disagreement between various methods for determining flow rate, including a number of UFMs of two AMAG designs in multiple locations. Further, examination of UFM interactions with flowing water has identified unresolved issues that potentially affect UFM measurement uncertainty.
The PWR Systems Branchlhas the following four requests under review that involve UFMs:
- A Ft. Calhoun power.:.uprate amendment using the approved AMAG,
- A Calvert Cliffs power uprate amendment using the approved AMAG,
- An advanced designrAMAG topical report, and
- A Seabrook power uprate amendment using the most recent Caldon design.
The Branch position is that no UFM reviews will be completed until we have an acceptable understanding of the uncertainties in UFM flow measurement and their interactions with flowing water. Outstanding issues must be fully understood and resolved, and we must be reasonably certain that the basis for an approved uncertainty determination process is correct. In part, we have taken this position because the AMAG vendor / licensees have not historically provided complete information regarding their UFMs, and because of the continuing occurrence of unexplained problems when following processes that were certified to be correct by Westinghouse / AMAG. These processes have been continually modified in response to problems that should not have occurred if the AMAG UFM was fully understood.
The Branch has just initiatedl a review of the Caldon UFM and has not fully developed an in-depth understanding cf the hydraulic interactions. The Branch plan is to follow essentially the same review approach for the Caldon UFM as with Westinghouse I AMAG. We provided a resolution "roadmap" to Westinghouse / AMAG, Ft. Calhoun, and Calvert Cliffs in late August, 2005 that addressed the technical issues that must be resolved. We developed a similar roadmap that is generic to the AMAG and Caldon UFMs on October 20 that we understand is being considered for transmittal to the Seabrook licensee by the Sieabrook Project Manager. Both roadmaps address theory,
testing, transfer of test restilts to the plants, installation, operation, and reasonable proof that operation is consistent with the claimed uncertainty.
Substantial progress has been achieved with AMAG following provision of the roadmap, but work remains. The most visible issue is failure to understand the Calvert Cliffs problem since its discovery and, until this is understood, we cannot ensure it is not of concern in other applications. Of the unresolved issues, this may be the most serious. The other significant remaining issues involve transfer of AMAG technology (uncertainty) from test facilities to plant applications and some theoretical aspects of AMAG interaction with flowing fluids. No plant-specific RAIs are planned until these issues are resolved. Onceresolved, the Calvert Cliffs review is anticipated to be relatively straightforward. We anticipate the Ft. Calhoun review status will be similar following a trip to the site to discuss that application. Further, we, perhaps optimistically, anticipate that few formal RAIs will be needed.
We anticipate the Caldon review will be more straightforward since the theoretical aspects are better understqbd and we are not aware of application difficulties similar to those encountered with AM.AG. There are a number of issues to address and most should be resolved by follo'ling the roadmap, with a generic meeting or two, plus a trip to Alden Labs and to Seabrook. Again, formal RAIs should be minimal assuming the above is as productive as we anticipate.