Text

September 12, 2007 Mr. Dennis L. Koehl Site Vice President Point Beach Nuclear Plant Nuclear Management Company, LLC 6590 Nuclear Road Two Rivers, WI 54241-9516

SUBJECT:

POINT BEACH NUCLEAR PLANT INFORMATION REQUEST FOR AN NRC BIENNIAL PERMANENT MODIFICATIONS AND 10 CFR 50.59 (MOD/50.59)

BASELINE INSPECTION

Dear Mr. Koehl:

On Tuesday, November 13, 2007, the NRC will begin a Modifications and 10 CFR 50.59 (MOD/50.59) Baseline Inspection at the Point Beach Nuclear Plant. This inspection will be performed in accordance with the NRC baseline Inspection Procedures IP 71111.02 and IP 71111.17. The on-site portion of the inspection will take place on November 13 - 16, and November 26 - 30, 2007.

Experience has shown that these baseline inspections are resource intensive, both for the NRC inspectors and the licensee staff. In order to minimize the inspection impact on the site, and to ensure a productive inspection for both parties, we have enclosed a request for documents needed for the inspection. These documents have been divided into two groups. The Group I documents should be sent to the Regional Office no later than October 29, 2007. The inspection team will review this information, and within one week of receipt of the information will request specific items for review. The Group II documents contain items that the team will review, or need access to, beginning the first on-site day of the inspection. It is important that all of these documents are up to date and complete in order to minimize the number of additional documents requested during the preparation and/or the on-site portions of the inspection.

The lead inspector for this inspection is Mr. S. Sheldon. We understand that our regulatory contact for this inspection is Ms. F. Flentje of your organization. If there are any questions about the inspection or the material requested, please contact the lead inspector at (630) 829-9727 or via e-mail at SNS2@NRC.gov.

D. Koehl In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA by J. Lara Acting For/

David E. Hills, Chief Engineering Branch 1 Division of Reactor Safety Docket Nos. 50-266; 50-301 License Nos. DPR-24; DPR-27

Enclosure:

Modification and 50.59 Inspection Document Request (Information for Preparation Week and Information Available On-site During Inspection) cc w/encl: F. Kuester, President and Chief Executive Officer, We Generation D. Cooper, Senior Vice President and Chief Nuclear Officer J. McCarthy, Site Director of Operations D. Weaver, Nuclear Asset Manager Plant Manager Regulatory Affairs Manager Training Manager Site Assessment Manager Site Engineering Director Emergency Planning Manager J. Rogoff, Vice President, Counsel & Secretary K. Duveneck, Town Chairman Town of Two Creeks Chairperson Public Service Commission of Wisconsin J. Kitsembel, Electric Division Public Service Commission of Wisconsin State Liaison Officer

D. Koehl In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely, David E. Hills, Chief Engineering Branch 1 Division of Reactor Safety Docket Nos. 50-266; 50-301 License Nos. DPR-24; DPR-27

Enclosure:

Modification and 50.59 Inspection Document Request (Information for Preparation Week and Information Available On-site During Inspection) cc w/encl: F. Kuester, President and Chief Executive Officer, We Generation D. Cooper, Senior Vice President and Chief Nuclear Officer J. McCarthy, Site Director of Operations D. Weaver, Nuclear Asset Manager Plant Manager Regulatory Affairs Manager Training Manager Site Assessment Manager Site Engineering Director Emergency Planning Manager J. Rogoff, Vice President, Counsel & Secretary K. Duveneck, Town Chairman Town of Two Creeks Chairperson Public Service Commission of Wisconsin J. Kitsembel, Electric Division Public Service Commission of Wisconsin State Liaison Officer DOCUMENT NAME: G:\DRS\Work in Progress\Ltr 09___07 Point Beach Request for Information VPL .doc 9 Publicly Available Non-Publicly Available Sensitive 9 Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII NAME SSheldon for VPLougheed: ls JLara for DEHills DATE 09/12/07 09/12/07 OFFICIAL RECORD COPY

Letter to Mr. D. Koehl from Mr. D. E. Hills dated September 12, 2007

SUBJECT:

POINT BEACH NUCLEAR PLANT INFORMATION REQUEST FOR AN NRC BIENNIAL PERMANENT MODIFICATIONS AND 10 CFR 50.59 (MOD/50.59)

BASELINE INSPECTION DISTRIBUTION:

TEB CFL EMH1 LXR1 RidsNrrDirsIrib MAS KGO JKH3 CAA1 RGK DRPIII DRSIII PLB1 TXN ROPreports@nrc.gov

INITIAL DOCUMENT REQUEST MODIFICATIONS AND 50.59 INSPECTION DOCUMENT REQUEST Inspection Report: 05000266/2007007(DRS); 05000301/2007007(DRS);

Inspection Dates: November 13 through 30, 2007 Inspection Procedures: IP 71111.02, Evaluation of Changes, Tests, or Experiments IP 71111.17, Permanent Plant Modifications Lead Inspector: S. Sheldon (630) 829-9727 I. Information requested for inspection preparation (October 29, 2007)

The following information is requested by October 29, 2007, or sooner, to facilitate the selection of specific items that will be reviewed during the preparation and on-site inspection weeks. The team will select specific items from the information requested below and submit a list to your staff within one week of receipt of the initial information. We will request that the remaining items selected from the lists be available and ready for review on the first day of inspection. All requested information should cover the time frame from the last Permanent Modification inspection (December 2005) to the present. If you have any questions regarding this information, please call the lead inspector as soon as possible.

(1) List of field complete permanent plant modifications to systems, structures or components. (For the purpose of this inspection, permanent plant modifications include permanent: plant changes; design changes; set point changes; equivalency evaluations; suitability analyses; and commercial grade dedications.)

The list should contain the number of each document, the title, the revision (or date), and the affected system. In addition to the list, please provide a description of each modification, and a list of associated calculations, and affected procedures.

(2) List of all 10 CFR 50.59 evaluations for completed changes to the facility involving:

(a) calculations; (b) procedure revisions; (c) changes to the facility (modifications);

(d) non-routine operating configurations; and (e) departures in methods of analyses.

The list should contain the number and title of each document, a brief description of the change, and the corresponding number and type of the affected document, (i.e., the modification or procedure to which the evaluation applies).

1 Enclosure

INITIAL DOCUMENT REQUEST MODIFICATIONS AND 50.59 INSPECTION DOCUMENT REQUEST The list should NOT include any evaluations in which prior NRC approval was sought and obtained.

(3) List of all completed changes to the facility that have been screened out of 10 CFR 50.59 as not requiring a full evaluation involving:

(a) calculations; (b) procedure revisions; (c) changes to the facility (modifications);

(d) non-routine operating configurations; and (e) departures in methods of analyses.

The list should contain the number and title of each document, a brief description of the change, and the corresponding number and type of the affected document (i.e., the modification or procedure to which the evaluation applies).

(4) List of any completed modifications, procedure revisions, or UFSAR changes where it was determined that 10 CFR 50.59 did not apply.

(5) List of corrective action documents, (open and closed) that address plant permanent modification or 10 CFR 50.59 issues, concerns, or processes. These documents should also include corrective action documents associated with modification, and 10 CFR 50.59 change implementation. Please provide the word searches used to identify these issues in your electronic corrective action system data bases.

The list should contain the number, title and revision (or date) of each document, the affected system and corresponding documentation (if applicable), and should be sorted in order of significance.

(6) Copies of procedures addressing the following: modifications, design changes, set point changes, equivalency evaluations or suitability analyses, commercial grade dedications, post-modification testing, 10 CFR 50.59 evaluation and screenings, and UFSAR updates.

(7) UFSAR updates submitted in accordance with 10 CFR 50.71(e)(4). Provide copies of the complete submittal.

(8) Name(s) and phone numbers for the regulatory and technical contacts.

(9) Current management and engineering organizational chart.

2 Enclosure

INITIAL DOCUMENT REQUEST MODIFICATIONS AND 50.59 INSPECTION DOCUMENT REQUEST II. Information requested to be provided on the first day of inspection (November 13, 2007)

(1) Copies of all items selected from Section I needed for the first day of inspection.

This includes copies of supporting/associated documents such as calculations, post-modification test packages, 10 CFR 50.59 evaluations or screenings, and any corrective action documents.

(2) Copies of these documents do not need to be solely available to the team as long as the inspectors have easy and unrestrained access to them.

(a) Updated Final Safety Analysis Report; (b) Original FSAR Volumes; (c) Original SER and Supplements (for Original FSAR);

(d) FSAR Question and Answers; (e) Quality Assurance Plan; (f) Technical Specifications; (g) Latest IPE/PRA Report; (h) Vendor Manuals; and (i) Latest 10 CFR 50.59 FSAR Update Submittal.

(3) Please ensure that other supporting documents for the selected items have been located and are readily retrievable as the team will likely be requesting these documents during the inspections. Examples of supporting documents are:

(a) Drawings supporting the modifications; (b) Procedures affected by the modifications; and (c) UFSAR change papers generated due to a 10 CFR 50.59 evaluation.