September 17, 2007 Mr. Britt T. McKinney Sr. Vice President and Chief Nuclear Officer PPL Susquehanna, LLC 769 Salem Blvd., NUCSB3 Berwick, PA 18603-0467

SUBJECT:

REQUESTS FOR ADDITIONAL INFORMATION FOR THE REVIEW OF THE SUSQUEHANNA STEAM ELECTRIC STATION, UNITS 1 AND 2, LICENSE RENEWAL APPLICATION

Dear Mr. McKinney:

By letter dated September 13, 2006, PPL Susquehanna, LLC submitted an application pursuant to 10 CFR Part 54, to renew the operating licenses for Susquehanna Steam Electric Station, Units 1 and 2, for review by the U.S. Nuclear Regulatory Commission (NRC or the staff). The staff is reviewing the information contained in the license renewal application and has identified, in the enclosure, areas where additional information is needed to complete the review.

These requests for additional information were discussed with Duane Filchner, and a mutually agreeable date for the response is within 30 days from the date of this letter. If you have any questions, please contact me at 301-415-4029 or e-mail ehg2@nrc.gov.

Sincerely,

/RA/

Evelyn Gettys, Project Manager License Renewal Branch A Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-387 and 50-388

Enclosure:

Requests for Additional Information cc w/encl: See next page

ML072490602 OFFICE LA:DLR PM:RLRA:DLR BC:RLRA:DLR NAME SFigueroa EGettys LLund DATE 09/10/07 09/11/07 09/17/07

Letter to B. McKinney From E. Gettys Dated September 17, 2007 DISTRIBUTION:

SUBJECT:

REQUESTS FOR ADDITIONAL INFORMATION FOR THE REVIEW OF THE SUSQUEHANNA STEAM ELECTRIC STATION, UNITS 1 AND 2, LICENSE RENEWAL APPLICATION HARD COPY:

DLR RF E-MAIL:

PUBLIC SSmith (srs3)

SDuraiswamy RidsNrrDlr RidsNrrDlrRlra RidsNrrDlrRlrb RidsNrrDlrRlrc RidsNrrDlrReba RidsNrrDlrRebb RidsNrrDci RidsNrrDra RidsNrrDe RidsNrrDeEemb RidsNrrDeEeeb RidsNrrDss RidsOgcMailCenter RidsNrrAdes RGuzman BRogers EGettys

Susquehanna Steam Electric Station, Units 1 and 2 cc:

Cornelius J. Gannon Vice President - Nuclear Operations PPL Susquehanna, LLC 769 Salem Blvd., NUCSB3 Berwick, PA 18603-0467 Robert M. Paley General Manager - Plant Support PPL Susquehanna, LLC 769 Salem Blvd., NUCSB2 Berwick, PA 18603-0467 Rocco R. Sgarro Manager - Nuclear Regulatory Affairs PPL Susquehanna, LLC Two North Ninth Street, GENPL4 Allentown, PA 18101-1179 Walter E. Morrissey Supervising Engineer Nuclear Regulatory Affairs PPL Susquehanna, LLC 769 Salem Blvd., NUCSA4 Berwick, PA 18603-0467 Michael H. Crowthers Supervising Engineer Nuclear Regulatory Affairs PPL Susquehanna, LLC Two North Ninth Street, GENPL4 Allentown, PA 18101-1179 Ronald E. Smith General Manager - Site Preparedness and Services PPL Susquehanna, LLC 769 Salem Blvd., NUCSA4 Berwick, PA 18603-0467 Steven M. Cook Manager - Quality Assurance PPL Susquehanna, LLC 769 Salem Blvd., NUCSB2 Berwick, PA 18603-0467 Luis A. Ramos Community Relations Manager, Susquehanna PPL Susquehanna, LLC 634 Salem Blvd., SSO Berwick, PA 18603-0467 Bryan A. Snapp, Esq.

Associate General Counsel PPL Services Corporation Two North Ninth Street, GENTW3 Allentown, PA 18101-1179 Supervisor - Document Control Services PPL Susquehanna, LLC Two North Ninth Street, GENPL4 Allentown, PA 18101-1179 Richard W. Osborne Allegheny Electric Cooperative, Inc.

212 Locust Street P.O. Box 1266 Harrisburg, PA 17108-1266 Director, Bureau of Radiation Protection Pennsylvania Department of Environmental Protection Rachel Carson State Office Building P.O. Box 8469 Harrisburg, PA 17105-8469 Senior Resident Inspector U.S. Nuclear Regulatory Commission P.O. Box 35, NUCSA4 Berwick, PA 18603-0035 Regional Administrator, Region 1 U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406

Susquehanna Steam Electric Station, Units 1 and 2 cc:

Board of Supervisors Salem Township P.O. Box 405 Berwick, PA 18603-0035 Dr. Judith Johnsrud National Energy Committee Sierra Club 443 Orlando Avenue State College, PA 16803

SUSQUEHANNA STEAM ELECTRIC STATION (SSES), UNITS 1 AND 2 LICENSE RENEWAL APPLICATION REQUESTS FOR ADDITIONAL INFORMATION (RAI)

RAI B.2.21-1 Aging Management Program (AMP) B.2.21, Reactor Vessel Surveillance Program, of the Susquehanna License Renewal Application (LRA) and the Updated Final Safety Analysis Report (UFSAR) supplement Section A.1.2.41 stated that the Susquehanna Steam Electric Station (SSES) reactor vessel surveillance program is part of the integrated surveillance program (ISP) described in BWRVIP-78, BWR Integrated Surveillance Program Plan, BWRVIP-86-A, BWR Vessel and Internals Project, BWR Integrated Surveillance Program Implementation, and BWRVIP-116, BWR Vessel And Internals Project, Integrated Surveillance Program Implementation For License Renewal. Susquehanna will follow the requirements of the BWRVIP ISP. Since BWRVIP-116-A is not issued yet, following the requirements of the BWRVIP ISP does not necessarily mean that the additional requirements in the NRC safety evaluation dated March 1, 2006, on BWRVIP-116 will be addressed before the period of extended operation. Hence, the staff requests that you make the following commitment in LRA AMP B.2.21 and UFSAR Section A.1.2.41:

The SSES Reactor Vessel Surveillance Program will be enhanced to ensure that the additional requirements that are specified in the NRC safety evaluation dated March 1, 2006, for BWRVIP-116 will be addressed before the period of extended operation.

RAI B.2.21-2 LRA AMP B.2.21 stated under the title NUREG-1801 Consistency that the SSES reactor vessel surveillance program is consistent with the 10 elements of NUREG-1801,Section XI.M31, Reactor Vessel Surveillance, with an exception. This exception is later identified as the NUREG-1801 requirement that analyzed capsules be stored once the analysis is complete.

The staff will not consider this exception because analyzed specimens may be reconstituted for future use during or beyond the current requested extended period of operation. The staff has not granted such exception for approved LRAs. Please revise B.2.21 to reflect this staff position. Further, Table 3-3 of the BWRVIP-116 report indicates that both SSES units have standby capsules. Since the BWRVIP-116 did not provide guidelines for standby capsules, the staff requested that you include the following commitment in the UFSAR Section A.1.2.41 of the LRA:

If the SSES standby capsule is removed from the RPV without the intent to test it, the capsule will be stored in manner which maintains it in a condition which would permit its future use, including during the period of extended operation, if necessary.