ML072430522
| ML072430522 | |
| Person / Time | |
|---|---|
| Site: | Vogtle |
| Issue date: | 08/31/2007 |
| From: | Casto C NRC/RGN-II |
| To: | Tynan T Southern Nuclear Operating Co |
| Shared Package | |
| ML072430511 | List: |
| References | |
| Download: ML072430522 (2) | |
Text
Vogtle Inspection / Activity Plan 09/01/2007 - 03/31/2009 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 2 08/31/2007 11:59:57 Report 22 2
- REQUALIFICATION INSPECTION Baseline Inspections 09/17/2007 09/21/2007 1, 2 7111111B IP Licensed Operator Requalification Program 5
EB2-TFP
- TRIENNIAL FIRE PROTECTION - INFO TRIP Baseline Inspections 09/18/2007 09/20/2007 1, 2 7111105T IP Fire Protection [Triennial]
5 EB2-TFP
- TRIENNIAL FIRE PROTECTION INSPECTION Baseline Inspections 10/01/2007 10/05/2007 1, 2 7111105T IP Fire Protection [Triennial]
Baseline Inspections 10/15/2007 10/19/2007 1, 2 7111105T IP Fire Protection [Triennial]
1 EB3-HS
- HEAT SINK INSPECTION Baseline Inspections 01/28/2008 02/01/2008 1, 2 7111107B IP Heat Sink Performance 1
EB3-ISI
- UNIT 1 INSERVICE INSPECTION Baseline Inspections 03/24/2008 03/28/2008 1
7111108P IP Inservice Inspection Activities - PWR 1
EB3SGISI
- U1 SG ISI Baseline Inspections 03/31/2008 04/04/2008 1
7111108P IP Inservice Inspection Activities - PWR 3
PSB1-EP
- EP EXERCISE Baseline Inspections 04/28/2008 05/02/2008 1, 2 7111401 IP Exercise Evaluation Baseline Inspections 04/28/2008 05/02/2008 1, 2 7111404 IP Emergency Action Level and Emergency Plan Changes Baseline Inspections 04/28/2008 05/02/2008 1, 2 71151-EP01 IP Drill/Exercise Performance Baseline Inspections 04/28/2008 05/02/2008 1, 2 71151-EP02 IP ERO Drill Participation Baseline Inspections 04/28/2008 05/02/2008 1, 2 71151-EP03 IP Alert & Notification System 5
LICREN
- LICENSE RENEWAL License Renewal Insp 05/19/2008 05/23/2008 1, 2 71002 IP License Renewal Inspection License Renewal Insp 06/02/2008 06/06/2008 1, 2 71002 IP License Renewal Inspection 1
PSB1-RP
- RADIATION PROTECTION PREINSPECTION VISIT Baseline Inspections 08/11/2008 08/13/2008 1, 2 7112101 IP Access Control to Radiologically Significant Areas 3
PSB1-RP
- RADIATION PROTECTION OCCUPATIONAL WK1 Baseline Inspections 09/22/2008 09/26/2008 1, 2 7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 09/22/2008 09/26/2008 1, 2 7112102 IP ALARA Planning and Controls Baseline Inspections 09/22/2008 09/26/2008 1, 2 7112202 IP Radioactive Material Processing and Transportation Baseline Inspections 09/22/2008 09/26/2008 1
71151-OR01 IP Occupational Exposure Control Effectiveness Baseline Inspections 09/22/2008 09/26/2008 1
71151-PR01 IP RETS/ODCM Radiological Effluent 1
EB3ISI
- U2 ISI Baseline Inspections 09/29/2008 10/03/2008 2
7111108P IP Inservice Inspection Activities - PWR 1
EBESGISI
- U2 SG ISI Baseline Inspections 10/06/2008 10/10/2008 2
7111108P IP Inservice Inspection Activities - PWR This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Enclosure
Vogtle Inspection / Activity Plan 09/01/2007 - 03/31/2009 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 2 of 2 08/31/2007 11:59:57 Report 22 3
PSB1-RP
- RADIATION PROTECTION OCCUPATIONAL WK2 Baseline Inspections 10/06/2008 10/10/2008 1, 2 7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 10/06/2008 10/10/2008 1, 2 7112102 IP ALARA Planning and Controls Baseline Inspections 10/06/2008 10/10/2008 1, 2 7112202 IP Radioactive Material Processing and Transportation Baseline Inspections 10/06/2008 10/10/2008 2
71151-OR01 IP Occupational Exposure Control Effectiveness Baseline Inspections 10/06/2008 10/10/2008 2
71151-PR01 IP RETS/ODCM Radiological Effluent 1
- PREP TRIP-PROBLEM ID AND RESOL Baseline Inspections 12/01/2008 12/05/2008 1, 2 71152B IP Identification and Resolution of Problems 4
EB1-MODS
- MODIFICATIONS - 10CFR50.59 Baseline Inspections 01/12/2009 01/16/2009 1, 2 7111102 IP Evaluation of Changes, Tests, or Experiments Baseline Inspections 01/12/2009 01/16/2009 1, 2 7111117B IP Permanent Plant Modifications 4
- PROBLEM IDENTIFIACTION & RESOLUTION Baseline Inspections 02/09/2009 02/13/2009 1, 2 71152B IP Identification and Resolution of Problems Baseline Inspections 02/23/2009 02/27/2009 1, 2 71152B IP Identification and Resolution of Problems This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Enclosure