September 10, 2007 Mr. Stephen G. Frantz, Director Reed Reactor Facility Reed College 3203 SE Woodstock Boulevard Portland, OR 97202

SUBJECT:

REED COLLEGE RESEARCH REACTOR - CLOSURE OF CONFIRMATORY ACTION LETTER CAL NO. NRR-04-006 ON SITE-SPECIFIC COMPENSATORY MEASURES IMPLEMENTATION PLAN

Dear Mr. Frantz:

On behalf of the U.S. Nuclear Regulatory Commission (NRC), I acknowledge receipt of your letter dated August 20, 2007 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML072400569). Your letter refers to NRCs Confirmatory Action Letter (CAL) No. NRR-04-006 (Accession No. ML033240616), issued on March 25, 2004. This CAL formalized commitments to implement the site-specific compensatory security measures. Your letter documents that Reed College has incorporated the site-specific compensatory measures commitments into the NRC-required security plan. Thank you for informing us of this action, which may be examined during a future NRC inspection of your facility. Based on your letter and our previous inspection of your implementation of the compensatory measures, the NRC has found that no further response is required regarding the CAL, and the CAL is closed.

Current NRC guidance regarding CALs is available in the NRC Enforcement Policy and the NRC Enforcement Manual on the NRC Web site at http://www.nrc.gov/about-nrc/regulatory/enforcement.html (click on Enforcement Policy or Enforcement Guidance). You also may contact the Government Printing Office (GPO) toll-free at 1-888-293-6498 to obtain a printed copy. The GPO is open from 7:00 a.m. to 9:00 p.m. EST, Monday through Friday (except Federal holidays).

In accordance with Title 10 of the Code of Federal Regulations, Part 2, Section 2.390 of the NRC's Rules of Practice, a copy of this letter will be made available electronically for public inspection in the NRC Public Document Room or from the NRCs document system, ADAMS, accessible from the NRC Web site at http://www.nrc.gov/reading-rm.html.

Sincerely,

/RA/

Michael J. Case, Director Division of Policy and Rulemaking Office of Nuclear Reactor Regulation Docket No. 50-288 License No. R-112 cc: See next page

Reed College Docket No. 50-288 cc:

Mayor of City of Portland 1220 Southwest 5th Avenue Portland, OR 97204 Reed College ATTN: Dr. Peter Steinberger Dean of the Faculty 3203 SE Woodstock Boulevard Portland, OR 97202-8199 Reed College ATTN: Dr. Colin Diver President 3203 SE Woodstock Boulevard Portland, OR 97202-8199 Oregon Department of Energy ATTN: David Stewart-Smith, Director Division of Radiation Control 625 Marion Street, NE Salem, OR 97310 Test, Research, and Training Reactor Newsletter University of Florida 202 Nuclear Sciences Center Gainesville, FL 32611

September 10, 2007 Mr. Stephen G. Frantz, Director Reed Reactor Facility Reed College 3203 SE Woodstock Boulevard Portland, OR 97202

SUBJECT:

REED COLLEGE RESEARCH REACTOR - CLOSURE OF CONFIRMATORY ACTION LETTER CAL NO. NRR-04-006 ON SITE-SPECIFIC COMPENSATORY MEASURES IMPLEMENTATION PLAN

Dear Mr. Frantz:

On behalf of the U.S. Nuclear Regulatory Commission (NRC), I acknowledge receipt of your letter dated August 20, 2007 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML072400569). Your letter refers to NRCs Confirmatory Action Letter (CAL) No. NRR-04-006 (Accession No. ML033240616), issued on March 25, 2004. This CAL formalized commitments to implement the site-specific compensatory security measures. Your letter documents that Reed College has incorporated the site-specific compensatory measures commitments into the NRC-required security plan. Thank you for informing us of this action, which may be examined during a future NRC inspection of your facility. Based on your letter and our previous inspection of your implementation of the compensatory measures, the NRC has found that no further response is required regarding the CAL, and the CAL is closed.

Current NRC guidance regarding CALs is available in the NRC Enforcement Policy and the NRC Enforcement Manual on the NRC Web site at http://www.nrc.gov/about-nrc/regulatory/enforcement.html (click on Enforcement Policy or Enforcement Guidance). You also may contact the Government Printing Office (GPO) toll-free at 1-888-293-6498 to obtain a printed copy. The GPO is open from 7:00 a.m. to 9:00 p.m. EST, Monday through Friday (except Federal holidays).

In accordance with Title 10 of the Code of Federal Regulations, Part 2, Section 2.390 of the NRC's Rules of Practice, a copy of this letter will be made available electronically for public inspection in the NRC Public Document Room or from the NRCs document system, ADAMS, accessible from the NRC Web site at http://www.nrc.gov/reading-rm.html.

Sincerely,

/RA/

Michael J. Case, Director Division of Policy and Rulemaking Office of Nuclear Reactor Regulation Docket No. 50-288 License No. R-112 cc: See next page DISTRIBUTION:

PUBLIC PRTA & PRTB r/f MMendonca AAdams DHughes JDyer BBoger CBassett DCollins JEads SMorris JEads Accession Number: ML072410168 Template: NRR-106 OFFICE DPR/PRTB:PM TECH ED DPR/PRTA:LA DPR/PRTA:BC DPR/PRTB:BC DPR:D NRR:D NAME MMendonca mm te EHylton egh DCollins dsc JEads jhe MCase mc JDyer DATE 8/30/2007 8/28/2007 8/30/2007 8/30/2007 8/31/2007 9/10/2007 9/6/2007 Official Record Copy