Dominion Resources Services, Inc.
5000 Dominion Boulevard, Glen Allen, VA 23060 Dominionw Web Address: www.dom.com August 16, 2007 United States Nuclear Regulatory Commission Serial No.:
07-0517 Attention: Document Control Desk NLOS/MBB Washington, DC 20555 Docket Nos.: 50-305 50-336/423 50-338/339 50-280/281 License Nos.: DPR-43 DPR 65 DOMINION ENERGY KEWAUNEE. INC. (DEK)
NPF-49 DOMINION NUCLEAR CONNECTICUT. INC. (DNC)
NPF-4/7 VIRGINIA ELECTRIC AND POWER COMPANY (Dominion)
DPR-32/37 KEWAUNEE POWER STATION MILLSTONE POWER STATION UNITS 2 & 3 NORTH ANNA POWER STATION UNITS 1 & 2 SURRY POWER STATION UNITS 1 & 2 NRC REGULATORY ISSUE
SUMMARY
2007-17 PREPARATION AND SCHEDULING OF OPERATOR LICENSING EXAMINATIONS In response to NRC Regulatory Issue Summary 2007-17, enclosed is the requested information on proposed site-specific operator licensing examination schedules and the estimated number of applicants planning to take those examinations and/or the NRC's generic fundamentals examinations (GFEs).
No new commitments are intended by this letter. If you have any questions concerning this information, please contact Mr. John Hayden at (804) 273-2707.
Ve truly yours, C. L. Funderburk Director - Nuclear Licensing & Operations Support Dominion Resources Services, Inc.
for Dominion Energy Kewaunee, Inc.,
Dominion Nuclear Connecticut, Inc. and Virginia Electric and Power Company Attachments H-AC0Y
SN 07-0517 Scheduling of Operator Licensing Examinations cc page 1 of 2 cc:
U. S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406-1415 U. S. Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth St., SW, Suite 23 T85 Atlanta, GA 30303-8931 U. S. Nuclear Regulatory Commission Region III 2443 Warrenville Road Suite 210 Lisle, IL 60532-4352 Mr. J. D. Hughey Project Manager U. S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Mail Stop 8B3 Rockville, MD 20852-2738 Mr. R. A. Jervey Project Manager U. S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Mail Stop 8G9A Rockville, MD 20852-2738 Mr. S. P. Lingam Project Manager U. S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Mail Stop 8 G9A Rockville, MD 20852-2738
SN 07-0517 Scheduling of Operator Licensing Examinations cc page 2 of 2 Mr. P. D. Milano Project Manager U. S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Mail Stop 8G9a Rockville, MD 20852-2738 Mr. R. I. Treadway NRC Senior Resident Inspector Millstone Power Station Mr. J. T. Reece NRC Senior Resident Inspector North Anna Power Station Mr. E. Riggs NRC Senior Resident Inspector Surry Power Station Mr. S. C. Burton NRC Senior Resident Inspector Kewaunee Power Station
NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 08/31/2008 (8-2005)
Estimated burden per response to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This information collection is used to plan budgets and resources for operator examinations. Send comments regarding burden OPERATOR LICENSING estimate to the Records and FOIA/Privacy Services Branch (T-5 F53). U.S.
Nuclear Regulatory Commission, Washington, DC 20555-0001, or by intemet EXAMINATION DATA e-mail to infocollects@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-1 0202, (3150-0131), Office of Management and Budget, Washington, DC 20503.
If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.
FACILITY NRC REGION MILLSTONE POWER STATION UNIT 2 Region I A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 08 CY 09 CY 10 CY 11 ESTIMATED NUMBER OF LICENSEE-PREPARED 1
1 1
0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 08 CY 09 CY 10 CY 11 NUMBER OF REACTOR OPERATORS 4
0 4
0 NUMBER OF SENIOR REACTOR OPERATORS - INSTANT 5
0 8
0 NUMBER OF SENIOR REACTOR OPERATORS - UPGRADE 4
6 2
0 NUMBER OF SENIOR REACTOR OPERATORS - LIMITED 0
0 0
0 PROPOSED DATES PRIMARY DATE 01/19/2009 09/15/2009 12/07/2110 ALTERNATE DATE 01/12/2009 09/29/2009 12/14/2010 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED Cy 08 NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED 12 NUMBER OF CANDIDATES NRC FORM 536 (8-200'5)
PRINTED ON RECYCLED PAPER
NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 08/31/2008 (8-2005)
Estimated burden per response to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This information collection is used to plan budgets and resources for operator examinations. Send comments regarding burden OPERATOR LICENSING estimate to the Records and FOIA/PrIvacy Services Branch (T-5 F53). U.S.
Nuclear Regulatory Commission, Washington, DC 20555-0001, or by intemet EXAMINATION DATA NEai to infocotiects@nrgov, and to the Desk Officer, Office of Informaton and Regulat.or Affairs, NEOB-1i0202, (3150-0131), Office of Management and Budget, Washington. DC 20503.
If a means used to impose an information colection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.
FACILITY NRC REGION MILLSTONE POWER STATION UNIT 3 Region I A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 08 CY 0 9 CY 10 CY 11 ESTIMATED NUMBER OF LICENSEE-PREPARED 0
1 1
0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED EXAMINATIONS 0
0 0
B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 08 CY 09 CY 10 CY 11 NUMBER OF REACTOR 0
6 8
0 OPERATORS NUMBER OF SENIOR REACTOR OPERATORS - INSTANT 0
8 4
.0 NUMBER OF SENIOR REACTOR OPERATORS - UPGRADE 0
2 0
0 NUMBER OF SENIOR REACTOR OPERATORS - LIMITED 0
0 0
0 PROPOSED DATES PRIMARY DATE 06/16/2009 01/25/2011 ALTERNATE DATE 06/23/2009 01/18/2011 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED CY 08 CY 09 NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED 14 12 NUMBER OF CANDIDATES NRC FORM 536 (8-2005)
PRINTED ON RECYCLED PAPER
NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 08/31/2008 (8-2005)
Estimated burden per response to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This information collection is used to plan budgets and resources for operator examinations. Send comments regarding burden OPERATOR LICENSING estimate to the Records and FOIA/Privacy Services Branch (T-5 F53), U.S.
Nuclear Regulatory Commission, Washington, DC 20555-0001, or by intemet EXAMINATION DATA e-mail to infocollects@nrc.gov, and to the Desk Officer, Office of Information and Regula Affairsy B-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503.
If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.
FACILITY NRC REGION NORTH ANNA POWER STATION Region II A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER Cy 08 CY 0 9 CY 10 CY 11 ESTIMATED NUMBER OF LICENSEE-PREPARED 1
0 1
0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED EXAMINATIONS 0
0 B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 08 CY 09 CY 10 CY 11 NUMBER OF REACTOR OPERATORS 9
0 10 0
NUMBER OF SENIOR REACTOR OPERATORS - INSTANT 3
0 4
0 NUMBER OF SENIOR REACTOR OPERATORS - UPGRADE 2
0 3
0 NUMBER OF SENIOR REACTOR OPERATORS - LIMITED 0
0 0
0 PROPOSED DATES PRIMARY DATE 06/09/2008 06/07/2010 ALTERNATE DATE 06/16/2008 06/14/2010 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 08 CY 09 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 12 CANDIDATES NRC FORM 5W (82005)
PRINTED ON RECYCLED PAPER
NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 08/3112008 (8-2005)
Estimated burden per response to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This information collection is used to plan budgets and resources for operator examinations. Send comments regarding burden OPERATOR LICENSING estimate to the Records and FOIA)Privacy Serices Branch CT-5 F53), U.S.
Nuclear Regulatory Commission. Washington, DC 20555-0001, or by internet EXAMINATION DATA e-,ail to infocollects@nr.gov, and to the Desk Officer, Office of nformation and Regulatory Affairs. NEQB-1 0202, (3150-0131), Office of Management and Budget, Washington, DC 20503.
If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.
FACILITY NRC REGION SURRY POWER STATION Region II A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY0 8 CY 09 CY1O cyll ESTIMATED NUMBER OF LICENSEE-PREPARED 0
0 0
0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED EXAMINATIONS 0
B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 08 CY 09 CYl0 CYl1 NUMBER OF REACTOR 8
15 0
10 OPERATORS NUMBER OF SENIOR REACTOR 3
5 0
4 OPERATORS - INSTANT NUMBER OF SENIOR REACTOR OPERATORS - UPGRADE 3
4 0
3 NUMBER OF SENIOR REACTOR OPERATORS - LIMITED 0
0 0
0 PROPOSED DATES PRIMARY DATE 03/17/2008 10/12/2009 05/17/2011 ALTERNATE DATE 03/24/2008 11/24/2009 06/17/2011 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 08 CY 09 PROPOSED NUMBER MARCH JUNE SEPTEMBERI DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED 2
NUMBER OF 20 CANDIDATES NRC ORM538(8-205)PRITEDON RCYCED APE NRC FORM 538 (8-2005)
PRINTED ON RECYCLED PAPER
NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 08/31/2008 (8-2005)
Estimated burden per response to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This information collection is used to plan budgets and resources for operator examinations. Send comments regarding burden OPERATOR LICENSING estimate to the Records and FOIA/Pdvacy Services Branch (T-5 F53), U.S.
Nuclear Regulatory Commission, Washington, DC 20555-0001, or by internet EXAMINATION DATA e-mail to infocollecs@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs NEOB-10202, (3150-0131), Office of Management and Budget. Washington, DC 20503.
If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.
FACILITY NRC REGION KEWAUNEE POWER STATION Region III A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY08 CY 09 CYI0 CYl1 ESTIMATED NUMBER OF LICENSEE-PREPARED 0
15 0
15 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0
0 0
0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 08 CY 09 CY10 Cy 11 NUMBER OF REACTOR OPERATORS 0
5 0
5 NUMBER OF SENIOR REACTOR OPERATORS - INSTANT 0
9 0
9 NUMBER OF SENIOR REACTOR OPERATORS - UPGRADE 0
1 0
1 NUMBER OF SENIOR REACTOR OPERATORS - LIMITED 0
0 0
0 PROPOSED DATES PRIMARY DATE 04/13/2009 02/07/2011 ALTERNATE DATE 05/04/2009 02/21/2011 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED CY 08 CY 09 NUMBER MARCH JUNE SEPTEMBERF DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF CANDIDATES NRC FORM 536 (8-2005)