ML072200354

From kanterella
Jump to navigation Jump to search

Revised Pages of Facility Operating License Nos. DPR-29 and DPR-30
ML072200354
Person / Time
Site: Quad Cities  Constellation icon.png
Issue date: 08/09/2007
From:
NRC/NRR/ADRO/DORL/LPLIII-2
To:
Sands, S, NRR/DLPM/PD3-2, 415-3154
Shared Package
ML072200029 List:
References
EA-02-026, EA-06-137, TAC MD4513, TAC MD4514
Download: ML072200354 (5)


Text

RENEWED FACILITY OPERATING LICENSES NOS. DPR-29 AND DPR-30 DOCKET NOS. 50-254 AND 50-265 QUAD CITIES NUCLEAR POWER STATION, UNIT NOS. 1 AND 2 Replace the following pages of the Facility Operating Licenses and Appendix A Technical Specifications with the attached pages. The revised pages are identified by number and contain marginal lines indicating the areas of change.

Remove Insert License DPR-29 License DPR-29 Page 8 Page 8 Page 9 License DPR-30 License DPR-30 Page 8 Page 8 Page 9

LLC evaluates such change pursuant to the criteria set forth in 10 CFR 50.59 and otherwise complies with the requirements in that section.

X. All capsules in the reactor vessel that are removed and tested must meet the test procedures and reporting requirements of ASTM E 185-82 to the extent practicable for the configuration of the specimens in the capsule. Any changes to the capsule withdrawal schedule, including spare capsules, must be approved by the NRC prior to implementation. All capsules placed in storage must be maintained for future insertion.

Y. Mitigation Strategy License Condition l l

Develop and maintain strategies for addressing large fires and explosions and l that include the following key areas: l l

(a) Fire fighting response strategy with the following elements: l

1. Pre-defined coordinated fire response strategy and guidance l
2. Assessment of mutual aid fire fighting assets l
3. Designated staging areas for equipment and materials l
4. Command and control l
5. Training of response personnel l l

(b) Operations to mitigate fuel damage considering the following: l

1. Protection and use of personnel assets l
2. Communications l
3. Minimizing fire spread l
4. Procedures for implementing integrated fire response strategy l
5. Identification of readily-available pre-staged equipment l
6. Training on integrated fire response strategy l
7. Spent fuel pool mitigation measures l l

(c) Actions to minimize release to include consideration of: l

1. Water spray scrubbing l
2. Dose to onsite responders l l

Z. The licensee shall implement and maintain all Actions required by Attachment 2 l to NRC Order EA-06-137, issued June 20, 2006, except the last action that l requires incorporation of the strategies into the site security plan, contingency l plan, emergency plan and/or guard training and qualification plan, as l appropriate. l l

Renewed License No. DPR-29 Revised by letter dated August 9, 2007 l

4. This renewed operating license is effective as of the date of issuance and shall expire at midnight on December 14, 2032.

FOR THE NUCLEAR REGULATORY COMMISSION

/RA/

J. E. Dyer, Director Office of Nuclear Reactor Regulation Attachments:

1. Appendix A - Technical Specifications
2. Appendix B - Environmental Protection Plan Date of Issuance: October 28, 2004 Renewed License No. DPR-29 Revised by letter dated August 9, 2007 l

writing when implementation of these activities is complete and can be verified by NRC inspection.

The Updated Final Safety Analysis Report supplement, as revised, shall be included in the next scheduled update to the Updated Final Safety Analysis Report required by 10 CFR 50.71(e)(4) following issuance of this renewed license. Until that update is complete, Exelon Generation Company, LLC may make changes to the programs and activities described in the supplement without prior Commission approval, provided that Exelon Generation Company, LLC evaluates such change pursuant to the criteria set forth in 10 CFR 50.59 and otherwise complies with the requirements in that section.

W. All capsules in the reactor vessel that are removed and tested must meet the test procedures and reporting requirements of ASTM E 185-82 to the extent practicable for the configuration of the specimens in the capsule.

Any changes to the capsule withdrawal schedule, including spare capsules, must be approved by the NRC prior to implementation. All capsules placed in storage must be maintained for future insertion.

X. Mitigation Strategy License Condition l l

Develop and maintain strategies for addressing large fires and explosions l and that include the following key areas: l l

(a) Fire fighting response strategy with the following elements: l

1. Pre-defined coordinated fire response strategy and guidance l
2. Assessment of mutual aid fire fighting assets l
3. Designated staging areas for equipment and materials l
4. Command and control l
5. Training of response personnel l l

(b) Operations to mitigate fuel damage considering the following: l

1. Protection and use of personnel assets l
2. Communications l
3. Minimizing fire spread l
4. Procedures for implementing integrated fire response strategy l
5. Identification of readily-available pre-staged equipment l
6. Training on integrated fire response strategy l
7. Spent fuel pool mitigation measures l l

(c) Actions to minimize release to include consideration of: l

1. Water spray scrubbing l
2. Dose to onsite responders l Renewed License No. DPR-30 Revised by letter dated August 9, 2007 l

Y. The licensee shall implement and maintain all Actions required by l Attachment 2 to NRC Order EA-06-137, issued June 20, 2006, except the l last action that requires incorporation of the strategies into the site l security plan, contingency plan, emergency plan and/or guard training l and qualification plan, as appropriate. l

4. This renewed operating license is effective as of the date of issuance and shall expire at midnight on December 14, 2032.

FOR THE NUCLEAR REGULATORY COMMISSION

/RA/

J. E. Dyer, Director Office of Nuclear Reactor Regulation Attachments:

1. Appendix A - Technical Specifications
2. Appendix B - Environmental Protection Plan Date of Issuance: October 28, 2004 Renewed License No. DPR-30 Revised by letter dated August 9, 2007 l