Letter Sequence Request |
---|
|
|
MONTHYEARML0723400062007-08-23023 August 2007 Conforming License Amendment to Incorporate the Mitigation Strategies Required by Section B.5.b. of Commission Order EA-02-026 (Tac Nos. MD4538 and MD4539) Project stage: Other ML0722000952007-08-23023 August 2007 Revised Pages of Facility Operating License DPR-57 and NPF-5 B.5.b Project stage: Request 2007-08-23
[Table View] |
Similar Documents at Hatch |
---|
Category:License-Operating (New/Renewal/Amendments) DKT 50
MONTHYEARML23032A3322024-04-24024 April 2024 Issuance of Amendments Nos. 322 and 267, Regarding LAR to Relax Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs in TS Table 1.1-1, Modes ML23053A2182023-03-0303 March 2023 Correction of Amendment Nos. 321 and 266 Regarding License Amendment Request to Revise the (National Fire Protection Association) NFPA-805 Fire Protection Program ML23034A2462023-02-21021 February 2023 Audit Summary for License Amendment Request to Relax Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs ML22363A3932023-02-15015 February 2023 Issuance of Amendments Nos. 321 and 266, Regarding License Amendment Request to Revise the (National Fire Protection Association) NFPA-805 Fire Protection Program ML22346A1482023-02-0909 February 2023 Issuance of Amendments 320 and 265, Regarding LAR to Revise Technical Specifications to Adopt TSTF-208 and Administrative Correction for Duplicate Technical Specifications 3.4.10 ML23018A0042023-01-24024 January 2023 – Correction of Amendment Nos. 319 and 264 Regarding Revision to Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times – RITSTF ML22297A1462022-12-22022 December 2022 Issuance of Amendments Nos. 319 and 264, Regarding Revision to Technical Specifications to Adopt Risk-Informed Completion Times TSTF 505, Revision 2, Provide Risk-Informed Extended Completion Times – RITS ML22325A3472022-11-23023 November 2022 Correction of Amendment Nos. 318 and 263 Issuance of Amendment Nos. 318 and 263, Regarding LAR to Revise TSTF-227 and TSTF-297 ML22293A0302022-11-0707 November 2022 Amendments 318 & 263 Issuance, Regarding LAR to Adopt TSTF-227, Revision to EOC-RPT Pump Actions, and TSTF-297, ATWS-RPT (EPID L-2021-LLA- 0227) ML22192A1172022-09-0202 September 2022 Issuance of Amendments Nos. 317 & 262, Regarding License Amendment Request to Revise Technical Specifications to Adopt TSTF-207-A, Completion Time for Restoration of Various Excessive Leakage Rates ML22192A1992022-08-19019 August 2022 Issuance of Amendments Nos. 316 and 261, Regarding Request to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling ML22101A0942022-05-20020 May 2022 Issuance of Amendments Nos. 315 and 260, Regarding Request to Eliminate Automatic Main Steam Line Isolation on High Turbine Building Area Temperature ML21349A5182022-02-0202 February 2022 Issuance of Amendments Regarding Revision to Technical Specifications to Adopt TSTF-554, Revise RCS Leakage ML21270A0862021-11-18018 November 2021 Issuance of Amendments Regarding Revision to Technical Specifications 5.7, High Radiation, Administrative Controls ML21264A6442021-09-24024 September 2021 Issuance of Amendment to Revise Technical Specification 3.7.2, Plant Service Water (Psw) System and Ultimate Heat Sink (UHS) (EPID L-2021-LLA-0164) (Emergency Circumstances) ML21217A0912021-09-21021 September 2021 SNC Fleet, Issuance of Amendments Regarding Revision to Emergency Plan to Change Staffing and Extend Staff Augmentation Times for Emergency Response Organization Positions ML21167A3152021-07-30030 July 2021 Issuance of Amendments Regarding Revision to Technical Specifications to Adopt TSTF-541, Rev.2, Add Exceptions to Surveillance Requirements for Valves & Dampers Locked in Actuated Position ML21159A1782021-06-15015 June 2021 Correction of Amendment Nos. 277 and 221 Application to Relocate the Pressure-Temperature Limit Curves Following TSTF-419 NL-21-0379, Southern Nuclear Operating Company - Supplement to License Amendment Request to Revise the Emergency Plan to Change Staffing and Extend Staff Augmentation Times for Emergency Response Organization Positions2021-04-27027 April 2021 Southern Nuclear Operating Company - Supplement to License Amendment Request to Revise the Emergency Plan to Change Staffing and Extend Staff Augmentation Times for Emergency Response Organization Positions ML21109A3592021-04-22022 April 2021 Issuance of Amendment No. 254, Regarding Revision to Technical Specifications for One-Time Extension of Completion Times Related to Residual Heat Removal System (Emergency Circumstances) ML21095A0872021-04-19019 April 2021 Non-Acceptance of Requested Licensing Action License Amendment Request to Revise Technical Specification Surveillance Requirement 3.3.5.2 Allowable Values ML21028A3882021-02-0101 February 2021 Revised Correction of Amendment Nos. 308 and 253 Application to Revise Technical Specifications to Adopt Technical Specifications Task Force Traveler TSTF-582, RPV WIC Enhancements ML21014A3752021-01-26026 January 2021 Correction of Amendment Nos. 308 and 253 Application to Revise Technical Specifications to Adopt Technical Specifications Task Force Traveler TSTF-582, RPV WIC Enhancements ML20294A0762020-12-0707 December 2020 Issuance of Amendments Nos. 308 and 253, Regarding Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control Enhancements ML20254A0572020-09-18018 September 2020 Issuance of Amendments Nos. 307 and 252, Regarding License Amendment Request to Revise the Required Actions of Technical Specifications 3.8.1, AC (Alternating Current) Sources - Operating, ML20202A0052020-09-15015 September 2020 Issuance of Amendments Nos. 306 and 251, Regarding the Application to Revise Technical Specifications to Adopt TSTF-568, Revise Appliciability of BWR/4 TS 3.6.2.5 and TS 3.6.3.2 ML20077J7042020-06-26026 June 2020 Issuance of Amendment Nos. 305 and 250, Regarding Adoption of 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors ML20167A0132020-06-17017 June 2020 Correction of Amendments Nos. 304 & 249 License Amendment Request to Adopt NFPA-805 Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants, 2001 EPID L-2018-LLA-0107 ML20066F5922020-06-11011 June 2020 Issuance of Amendments Nos. 304 and 249, Regarding License Amendment Request to Adopt NFPA-805 Performance Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants (2001 Edition) ML19337C3222020-01-29029 January 2020 Issuance of Amendments Revision to Technical Specifications to Adopt TSTF-563 ML19239A2442019-11-19019 November 2019 Issuance of Amendments Regarding Revision to Technical Specification Requirements During Handling Irradiated Fuel and Core Alterations ML19267A0232019-11-13013 November 2019 Issuance of Amendments the Revision to Technical Specifications to Adopt TSTF-566, Revise Actions for Inoperable (Residual Heat Removal) RHR Shutdown Cooling Subsystems, Using Consolidated Line Item Improvement Process ML19212A0542019-09-20020 September 2019 Issuance of Amendments 299 and 244 Regarding Revision to Technical Specifications to Adopt Tstf-564, Safety Limit (Minimum Critical Power Ratio) MCPR ML19198A1042019-09-0404 September 2019 Issuance of Amendments Regarding Revision to Technical Specification 3.6.4.1 - Secondary Containment ML19177A1662019-07-0808 July 2019 Edwin Hatch Unit Nos. 1 and 2, Issuance of Amendments Regarding License Amendment Request to Correct Non-Conservative Technical Specification Allowable Values for the Condensate Storage Tank Low Level Transfer Function ML19091A2912019-04-30030 April 2019 Issuance of Amendments 296 and 241 to Revise Technical Specifications 3.6.2.5, Condition C, Residual Heat Removal Drywell Spray End State ML19064A7742019-04-26026 April 2019 Issuance of Amendments Regarding License Amendment Request to Revise Technical Specification 5.2.2.g and Update Emergency Plan Minimum on Shift Staff Tables ML19053A0932019-02-22022 February 2019 Issuance of Amendments to Revise Technical Specification 3.8.1, AC Sources - Operating (EPID L-2019-LLA-0026) (Emergency Circumstances) ML19010A0092019-01-28028 January 2019 Issuance of Amendments to Revise Technical Specification 3.3.8.1, Loss of Power (LOP) Instrumentation ML18302A2562018-11-0202 November 2018 Correction of Amendment No. 227 Adoption of TSTF-65-A, Revision 1 ML18222A2962018-08-29029 August 2018 Issuance of Amendments to Revise Technical Specification 3.7.7, ECCS - Operating (CAC Nos. MF9997 and MF9998; EPID L-2017-LLA-0263) ML18183A0732018-07-26026 July 2018 Unites 1, 2, 3, and 4; and Edwin I. Hatch Nuclear Plant, Unit Nos. 1 and 2(CAC Nos. MG0188, MG0189, MG0191, MG0192, MG0193, MG0194, and MG0195; EPID L-2017-LLA-0293) ML18123A3682018-05-31031 May 2018 Issuance of Amendments to Adopt TSTF-542, RPV Water Inventory Control (CAC Nos. MF9662 and MF9663; EPID L-2017-LLA-0215) ML17355A4402018-01-22022 January 2018 Issuance of Amendments to Revise TS 3.6.4.1, Secondary Containment (CAC Nos. MF9590 and MF9591; EPID L-2017-LLA-0216) ML17271A3072017-11-30030 November 2017 Issuance of Amendments to Revise Actions of TS 5.5.12, Primary Containment Leakage Rate Testing Program ML17208A2312017-08-29029 August 2017 Issuance of Amendments Regarding the Adoption of TSTF 500, DC Electrical Rewrite - Update to TSTF 360 ML17152A2182017-06-30030 June 2017 Southern Nuclear Fleet - Issuance of Amendments Regarding the Adoption of TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing (CAC Nos. MF8176 - MF8181) ML17137A0412017-06-27027 June 2017 Issuance of Amendments Regarding the Adoption of TSTF-529, Revision 4, Clarify Use and Application Rules (CAC Nos. MF8897, MF8898, MF8900-MF8902, and MF8921) ML17023A2372017-03-16016 March 2017 Issuance of Amendments Regarding the Adoption of NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors(Cac Nos. MF7460-MF7465) ML16141A1472017-03-14014 March 2017 Issuance of Amendments to Incorporate Southern Nuclear Company Fleet Emergency Plan 2024-04-24
[Table view] |
Text
ENCLOSURE 1 REVISED PAGES OF RENEWED FACILITY OPERATING LICENSE DPR-57 and NPF-5 DOCKET NOS. 50-321 AND 50-366 EDWIN I. HATCH NUCLEAR PLANT, UNITS 1 AND 2 Replace the following pages of the Renewed Facility Operating Licenses. The revised pages are identified by the date of the letter issuing these pages and contain marginal lines indicating the areas of change.
REMOVE INSERT License DPR-57 License DPR-57 Page 5 Page 5
Page 5a License NPF-5 License NPF-5 Page 5 Page 5
Page 5a
would not adversely affect the ability to achieve and maintain safe shutdown in the event of a fire.
(4.a) Physical Protection Southern Nuclear shall fully implement and maintain in effect all provisions of the Commission-approved physical security, training and qualification, and safeguards contingency plans, including amendments made pursuant to provisions of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (51 FR 27817 and 27822) and to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The plan is entitled:
Southern Nuclear Operating Company Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, with revisions submitted through May 15, 2006.
(4.b) Mitigation Strategy License Condition Develop and maintain strategies for addressing large fires and explosions and that include the following key areas:
(a) Fire fighting response strategy with the following elements:
- 1. Pre-defined coordinated fire response strategy and guidance
- 2. Assessment of mutual aid fire fighting assets
- 3. Designated staging areas for equipment and materials
- 4. Command and control
- 5. Training of response personnel (b) Operations to mitigate fuel damage considering the following:
- 1. Protection and use of personnel assets
- 2. Communications
- 3. Minimizing fire spread
- 4. Procedures for implementing integrated fire response strategy
- 5. Identification of readily-available pre-staged equipment
- 6. Training on integrated fire response strategy
- 7. Spent fuel pool mitigation measures (c) Actions to minimize release to include consideration of:
- 1. Water spray scrubbing
- 2. Dose to onsite responders (4.c) The licensee shall implement and maintain all Actions required by Attachment 2 to NRC Order EA-06-137, issued June 20, 2006, except the last action that requires incorporation of the strategies into the site security plan, contingency plan, emergency plan and/or guard training and qualification plan, as appropriate.
Renewed License No. DPR-57 Revised by letter dated October 20, 2006 Revised by letter dated August 23, 2007
- 5a -
(5) FSAR Supplement The licensees Final Safety Analysis Report Supplement, dated September 5, 2001, shall be included in the next Updated Final Safety Evaluation Analysis Report update, required by 10 CFR 50.71(e).
(6) Safety Analysis Report The licensees Final Safety Analysis Report Supplement, dated September 5, 2001, submitted pursuant to 10 CFR 54.21(d), describes certain future inspection activities to be completed before the period of extended operation begins. The licensee shall complete these activities no later than August 6, 2014.
(7) Integrated Surveillance Program The licensee shall implement a staff-approved reactor vessel integrated surveillance program for the extended period of operation which satisfies the requirements of 10 CFR Part 54. Such a program will be implemented through a staff-approved Boiling Water Reactor Vessel and Internals Project program or through a staff-approved plant-specific program. The plant specific program, if needed, will be developed in a manner that is consistent with other aging management programs, will include consideration of the 10 program attributes utilized for other aging management programs, and will provide a technical justification for any Renewed License No. DPR-57 Revised by letter dated August 23, 2007
in the updated Fire Hazards Analysis and Fire Protection Program for the Edwin I. Hatch NucIear Plant Units 1 and 2, which was originally submitted by letter from GPC to the Commission dated July 22, 1986. Southern Nuclear may make changes to the fire protection program without prior Commission approval only if the changes would not adversely affect the ability to achieve and maintain safe shutdown in the event of a fire.
(b.1) Physical Protection Southern Nuclear shall fully implement and maintain in effect all provisions of the Commission-approved physical security, training and qualification, and safeguards contingency plans, including amendments made pursuant to provisions of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (51 FR 27817 and 27822) and the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The plan is entitled Southern Nuclear Operating Company Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, with revisions submitted through May 15, 2006.
(b.2) Mitigation Strategy License Condition Develop and maintain strategies for addressing large fires and explosions and that include the following key areas:
(a) Fire fighting response strategy with the following elements:
- 1. Pre-defined coordinated fire response strategy and guidance
- 2. Assessment of mutual aid fire fighting assets
- 3. Designated staging areas for equipment and materials
- 4. Command and control
- 5. Training of response personnel (b) Operations to mitigate fuel damage considering the following:
- 1. Protection and use of personnel assets
- 2. Communications
- 3. Minimizing fire spread
- 4. Procedures for implementing integrated fire response strategy
- 5. Identification of readily-available pre-staged equipment
- 6. Training on integrated fire response strategy
- 7. Spent fuel pool mitigation measures Renewed License No. NPF-5 Revised by letter dated October 20, 2006 Revised by letter dated August 23, 2007
- 5a -
(c) Actions to minimize release to include consideration of:
- 1. Water spray scrubbing
- 2. Dose to onsite responders (b.3) The licensee shall implement and maintain all Actions required by Attachment 2 to NRC Order EA-06-137, issued June 20, 2006, except the last action that requires incorporation of the strategies into the site security plan, contingency plan, emergency plan and/or guard training and qualification plan, as appropriate.
(c) FSAR Supplement The licensee's Final Safety Analysis Report Supplement dated September 5, 2001, shall be included in the next Updated Final Safety Analysis Report update, required by 10 CFR 50.71(e).
(d) Safety Analysis Report The licensee's Final Safety Analysis Report Supplement dated September 5, 2001, submitted pursuant to 10 CFR 54.21(d),
describes certain future inspection activities to be completed before the period of extended operation begins. The licensee shall complete those activities no later than June 13, 2018.
(e) Integrated Surveillance Program The licensee shall implement a staff-approved reactor vessel integrated surveillance program for the extended period of operation which satisfies the requirements of 10 CFR Part 54.
Such a program will be implemented through a staff-approved Renewed License No. NPF-5 Revised by letter dated October 20, 2006 Revised by letter dated August 23, 2007