Revised Pages of Facility Operating License DPR-57 and NPF-5 B.5.b
ML072200095
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 08/23/2007
From: Martin R
NRC/NRR/ADRO/DORL/LPLII-1
To:
Martin R, NRR/DORL, 415-1493
Shared Package
ML072340005 List:
References
Download: ML072200095 (5)


Text

ENCLOSURE 1 REVISED PAGES OF RENEWED FACILITY OPERATING LICENSE DPR-57 and NPF-5 DOCKET NOS. 50-321 AND 50-366 EDWIN I. HATCH NUCLEAR PLANT, UNITS 1 AND 2 Replace the following pages of the Renewed Facility Operating Licenses. The revised pages are identified by the date of the letter issuing these pages and contain marginal lines indicating the areas of change.

REMOVE INSERT License DPR-57 License DPR-57 Page 5 Page 5


Page 5a License NPF-5 License NPF-5 Page 5 Page 5


Page 5a

would not adversely affect the ability to achieve and maintain safe shutdown in the event of a fire.

(4.a) Physical Protection Southern Nuclear shall fully implement and maintain in effect all provisions of the Commission-approved physical security, training and qualification, and safeguards contingency plans, including amendments made pursuant to provisions of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (51 FR 27817 and 27822) and to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The plan is entitled:

Southern Nuclear Operating Company Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, with revisions submitted through May 15, 2006.

(4.b) Mitigation Strategy License Condition Develop and maintain strategies for addressing large fires and explosions and that include the following key areas:

(a) Fire fighting response strategy with the following elements:

1. Pre-defined coordinated fire response strategy and guidance
2. Assessment of mutual aid fire fighting assets
3. Designated staging areas for equipment and materials
4. Command and control
5. Training of response personnel (b) Operations to mitigate fuel damage considering the following:
1. Protection and use of personnel assets
2. Communications
3. Minimizing fire spread
4. Procedures for implementing integrated fire response strategy
5. Identification of readily-available pre-staged equipment
6. Training on integrated fire response strategy
7. Spent fuel pool mitigation measures (c) Actions to minimize release to include consideration of:
1. Water spray scrubbing
2. Dose to onsite responders (4.c) The licensee shall implement and maintain all Actions required by Attachment 2 to NRC Order EA-06-137, issued June 20, 2006, except the last action that requires incorporation of the strategies into the site security plan, contingency plan, emergency plan and/or guard training and qualification plan, as appropriate.

Renewed License No. DPR-57 Revised by letter dated October 20, 2006 Revised by letter dated August 23, 2007

- 5a -

(5) FSAR Supplement The licensees Final Safety Analysis Report Supplement, dated September 5, 2001, shall be included in the next Updated Final Safety Evaluation Analysis Report update, required by 10 CFR 50.71(e).

(6) Safety Analysis Report The licensees Final Safety Analysis Report Supplement, dated September 5, 2001, submitted pursuant to 10 CFR 54.21(d), describes certain future inspection activities to be completed before the period of extended operation begins. The licensee shall complete these activities no later than August 6, 2014.

(7) Integrated Surveillance Program The licensee shall implement a staff-approved reactor vessel integrated surveillance program for the extended period of operation which satisfies the requirements of 10 CFR Part 54. Such a program will be implemented through a staff-approved Boiling Water Reactor Vessel and Internals Project program or through a staff-approved plant-specific program. The plant specific program, if needed, will be developed in a manner that is consistent with other aging management programs, will include consideration of the 10 program attributes utilized for other aging management programs, and will provide a technical justification for any Renewed License No. DPR-57 Revised by letter dated August 23, 2007

in the updated Fire Hazards Analysis and Fire Protection Program for the Edwin I. Hatch NucIear Plant Units 1 and 2, which was originally submitted by letter from GPC to the Commission dated July 22, 1986. Southern Nuclear may make changes to the fire protection program without prior Commission approval only if the changes would not adversely affect the ability to achieve and maintain safe shutdown in the event of a fire.

(b.1) Physical Protection Southern Nuclear shall fully implement and maintain in effect all provisions of the Commission-approved physical security, training and qualification, and safeguards contingency plans, including amendments made pursuant to provisions of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (51 FR 27817 and 27822) and the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The plan is entitled Southern Nuclear Operating Company Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, with revisions submitted through May 15, 2006.

(b.2) Mitigation Strategy License Condition Develop and maintain strategies for addressing large fires and explosions and that include the following key areas:

(a) Fire fighting response strategy with the following elements:

1. Pre-defined coordinated fire response strategy and guidance
2. Assessment of mutual aid fire fighting assets
3. Designated staging areas for equipment and materials
4. Command and control
5. Training of response personnel (b) Operations to mitigate fuel damage considering the following:
1. Protection and use of personnel assets
2. Communications
3. Minimizing fire spread
4. Procedures for implementing integrated fire response strategy
5. Identification of readily-available pre-staged equipment
6. Training on integrated fire response strategy
7. Spent fuel pool mitigation measures Renewed License No. NPF-5 Revised by letter dated October 20, 2006 Revised by letter dated August 23, 2007

- 5a -

(c) Actions to minimize release to include consideration of:

1. Water spray scrubbing
2. Dose to onsite responders (b.3) The licensee shall implement and maintain all Actions required by Attachment 2 to NRC Order EA-06-137, issued June 20, 2006, except the last action that requires incorporation of the strategies into the site security plan, contingency plan, emergency plan and/or guard training and qualification plan, as appropriate.

(c) FSAR Supplement The licensee's Final Safety Analysis Report Supplement dated September 5, 2001, shall be included in the next Updated Final Safety Analysis Report update, required by 10 CFR 50.71(e).

(d) Safety Analysis Report The licensee's Final Safety Analysis Report Supplement dated September 5, 2001, submitted pursuant to 10 CFR 54.21(d),

describes certain future inspection activities to be completed before the period of extended operation begins. The licensee shall complete those activities no later than June 13, 2018.

(e) Integrated Surveillance Program The licensee shall implement a staff-approved reactor vessel integrated surveillance program for the extended period of operation which satisfies the requirements of 10 CFR Part 54.

Such a program will be implemented through a staff-approved Renewed License No. NPF-5 Revised by letter dated October 20, 2006 Revised by letter dated August 23, 2007