Revised Pages for the Facility Operating License DPR-49
ML072180120
Person / Time
Site: Duane Arnold NextEra Energy icon.png
Issue date: 08/09/2007
From: Feintuch K
NRC/NRR/ADRO/DORL/LPLIII-1
To:
Feintuch K, NRR/DORL/LPL3-1, 415-3079
Shared Package
ML072180022 List:
References
TAC MD4529
Download: ML072180120 (3)


Text

ATTACHMENT TO LICENSE AMENDMENT FACILITY OPERATING LICENSE NO. DPR-49 DOCKET NO. 50-331 Replace the following pages of the Facility Operating License No. DPR-49 with the attached revised pages. The revised page is identified by reference to the transmittal letter and contains a marginal line indicating the area of change.

REMOVE INSERT Page 4a Page 5 Page 6

2.C.(6) Deleted 2.C.(7) Additional Conditions The Additional Conditions contained in Appendix B, as revised through Amendment No. 260, are hereby incorporated into this license. FPL Energy Duane Arnold, LLC shall operate the facility in accordance with the Additional Conditions.

2.C.(8) The licensee is authorized to revise the Updated Final Safety Analysis Report by deleting the footnote for Section 9.1.4.4.5 which states: "*The NRC has not endorsed the reactor building crane as single-failure proof (Reference 9)," and by deleting Reference 9 of the references for Section 9.1.

2.C.(9) Mitigation Strategy License Condition Develop and maintain strategies for addressing large fires and explosions and that include the following key areas:

(a) Fire fighting response strategy with the following elements:

1. Pre-defined coordinated fire response strategy and guidance
2. Assessment of mutual aid fire.fighting assets
3. Designated staging areas for equipment and materials
4. Command and control
5. Training of response personnel (b) Operations to mitigate fuel damage considering the following:
1. Protection and use of personnel assets
2. Communications
3. Minimizing fire spread
4. Procedures for implementing integrated fire response strategy
5. Identification of readily-available pre-staged equipment
6. Training on integrated fire response strategy
7. Spent fuel pool mitigation measures (c) Actions to minimize release to include consideration of:
1. Water spray scrubbing
2. Dose to onsite responders 2.C.(10)The licensee shall implement and maintain all Actions required by Attachment 2 to NRC Order EA-06-137, issued June 20, 2006, except the last action that requires incorporation of the strategies into the site security plan, contingency plan, emergency plan and/or guard training and qualification plan, as appropriate.

D. This license is effective as of the date of issuance and shall expire at midnight February 21, 2014.

Revised by letter dated August 9, 2007

I FOR THE ATOMIC ENERGY COMMISSION Originalsigned by Roger Boyd for A. Giambuso, Deputy Director for Reactor Projects Directorate of Licensing

Enclosures:

Appendix A Technical Specifications Appendix B Additional Conditions Date of Issuance: February 22, 1974 Revised by letter dated August 9, 2007