Letter Sequence Other |
---|
|
|
MONTHYEARML0720600142007-08-0202 August 2007 Conforming License Amendment to Incorporate the Mitigation Strategies Required by Section B.5.b. of Commission Order EA-02-026 (Tac Nos. MD4530 and MD4531) Project stage: Other ML0721408862007-08-0202 August 2007 Revised Pages of Facility Operating License Nos. NPF-2 and NPF-8 Project stage: Other 2007-08-02
[Table View] |
|
---|
Category:License-Operating (New/Renewal/Amendments) DKT 50
MONTHYEARML23228A1432023-11-22022 November 2023 Issuance of Amendment Nos. 249 and 246 to Revise TS 3.6.3, Surveillance Requirement 3.6.3.5 to Eliminate Event-Based Testing of Containment Purge Valves with Resilient Seals ML23240A0012023-08-30030 August 2023 Correction to Issuance of Amendment Nos. 241, 242, 243, and 244 ML23235A2962023-08-24024 August 2023 Issuance of Amendment Nos. 247 and 244, Regarding License Amendment Request to Revise Technical Specification 3.6.5, Containment Air Temperature, (EPID L-2023-LLA-0116) (Emergency Circumstances) ML23136B1542023-07-0303 July 2023 Issuance of Amendment Nos. 246 & 243, Regarding License Amendment Request to Revise Technical Specification 4.3, Fuel Storage, to Correct Tabulated Values from the Associated Spent Fuel Pool (SFP) Criticality Analysis ML23076A0502023-03-21021 March 2023 Correction of Amendment Nos. 244 and 241 Issuance of Amendments Regarding Revision to Technical Specifications to Relocate Augmented Piping Inspection Program Details to a License Controlled Document ML23054A4552023-03-16016 March 2023 Issuance of Amendment Nos. 245 and 242, Regarding LAR to Revise Technical Specification 3.4.10, Pressurizer Safety Valves, to Decrease Low Side Setpoint Tolerance LCO Value ML22308A0592022-11-0808 November 2022 Issuance of Amendments Regarding Revision to Technical Specifications to Relocate Augmented Piping Inspection Program Details to a Licensee-Controlled Document ML22286A0742022-11-0808 November 2022 Issuance of Amendments Regarding Revision to Technical Specifications to Relocate Augmented Piping Inspection Program Details to a Licensee-Controlled Document ML22263A2252022-11-0101 November 2022 Issuance of Amendment Nos. 243 and 240 to Revise Technical Specification 5.5.17, Containment Leakage Rate Testing Program to Increase Calculated Peak Containment Pressure ML22069A0042022-04-27027 April 2022 Issuance of Amendments Revision to TSs to Adopt TSTF-269-A, Rev. 2, Allow Administrative Means of Position Verification for Locked or Sealed Valves ML22060A1892022-03-15015 March 2022 Correction to TS Pg 3.6.6-4 During Issuance of Amendment Nos. 225 and 222 ML22032A2432022-03-0707 March 2022 Issuance of Amendment Nos. 241 and 238 to Eliminate the Encapsulation Vessels Around the First Containment Spray and Residual Heat Removal / Low Head Safety Injection Recirculation Suction Isolation Valves ML21349A5182022-02-0202 February 2022 Issuance of Amendments Regarding Revision to Technical Specifications to Adopt TSTF-554, Revise RCS Leakage ML21344A0032022-01-26026 January 2022 Issuance of Amendments Regarding Revision to Use Beacon Power Distribution Monitoring System ML22004A1322022-01-24024 January 2022 Correction of Amendment Nos. 227 and 224 Issuance of Amendments Regarding Application to Revise Technical Specifications to Adopt TSTF-569, Revise Response Time Testing Definition (EPID L-2019-LLA-027 ML21316A0552022-01-0505 January 2022 1 & 2, and Vogtle Electric Generating Plant, 1 & 2 - Issuance of Amendments Regarding Revision to Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections (EPID L-2021-LLA-0163 ML21270A0862021-11-18018 November 2021 Issuance of Amendments Regarding Revision to Technical Specifications 5.7, High Radiation, Administrative Controls ML21217A0912021-09-21021 September 2021 SNC Fleet, Issuance of Amendments Regarding Revision to Emergency Plan to Change Staffing and Extend Staff Augmentation Times for Emergency Response Organization Positions ML21167A3152021-07-30030 July 2021 Issuance of Amendments Regarding Revision to Technical Specifications to Adopt TSTF-541, Rev.2, Add Exceptions to Surveillance Requirements for Valves & Dampers Locked in Actuated Position ML21137A2472021-06-30030 June 2021 Issuance of Amendment Nos. 233 and 230, Regarding Risk-Informed Categorization and Treatment of Structures, Systems, and Components NL-21-0379, Southern Nuclear Operating Company - Supplement to License Amendment Request to Revise the Emergency Plan to Change Staffing and Extend Staff Augmentation Times for Emergency Response Organization Positions2021-04-27027 April 2021 Southern Nuclear Operating Company - Supplement to License Amendment Request to Revise the Emergency Plan to Change Staffing and Extend Staff Augmentation Times for Emergency Response Organization Positions ML21095A0872021-04-19019 April 2021 Non-Acceptance of Requested Licensing Action License Amendment Request to Revise Technical Specification Surveillance Requirement 3.3.5.2 Allowable Values ML20303A1192020-12-11011 December 2020 Issuance of Amendment Nos. 232 and 229 Regarding Adoption of TSTF-567, Revision 1, Add Containment Sump TS to Address GSI-191 Issues ML20224A2852020-10-13013 October 2020 Issuance of Amendment Nos. 231 and 228 to Revise Technical Specifications 3.3.1 and 3.3.7 ML20121A2832020-10-0909 October 2020 Issuance of Amendments 230 and 227 Measurement Uncertainty Recapture Power Uprate ML20196L9292020-10-0606 October 2020 Issuance of Amendment Nos. 229 and 226 Regarding Spent Fuel Pool Criticality Safety Analysis ML19337C3222020-01-29029 January 2020 Issuance of Amendments Revision to Technical Specifications to Adopt TSTF-563 ML19175A2432019-08-23023 August 2019 Issuance of Amendments 225 and 222 Implementation of NEI 06-09, Risk-Informed Technical Specifications Initiative 4B, Risk-Managed Technical Specification (Rmts) Guidelines, Revision 0-A ML19156A2622019-07-30030 July 2019 Issuance of Amendments 224 and 221 Performance-Based Fire Protection Alternative for Thermal Insulation Material ML19071A1382019-07-16016 July 2019 Issuance of Amendments 223 and 220 Revise Technical Specification Requirements During Handling Irradiated Fuel and Core Alterations TSTF-51 and TSTF-471 ML19064A7742019-04-26026 April 2019 Issuance of Amendments Regarding License Amendment Request to Revise Technical Specification 5.2.2.g and Update Emergency Plan Minimum on Shift Staff Tables ML18271A2072018-11-0707 November 2018 Issuance of Amendments 221 and 218 Technical Specification 3.3.2 Regarding Steam Flow Isolation on High Steam Flow ML18183A0732018-07-26026 July 2018 Unites 1, 2, 3, and 4; and Edwin I. Hatch Nuclear Plant, Unit Nos. 1 and 2(CAC Nos. MG0188, MG0189, MG0191, MG0192, MG0193, MG0194, and MG0195; EPID L-2017-LLA-0293) ML18151A1742018-06-27027 June 2018 Issuance of Amendment Nos. 219 and 216, Adopt Technical Specification Task Force Traveler TSTF-412, Revision 3, Provide Actions for One Steam Supply to Turbine Driven Afw/Efw Pump Inoperable ML17291A7812018-03-0101 March 2018 Issuance of Amendments to Correct Non-Conservative Technical Specification 3.7.1 (CAC Nos. MF9465 and MF9466; EPID L-2017-LLA-0181) ML17261A0872018-02-28028 February 2018 Issuance of Amendments to Revise Actions of TS 5.5.17, Containment Leakage Rate Testing Program (CAC Nos. MF8844 and MF8845; EPID No. L-2016-LLA-0015) ML17271A2652017-12-20020 December 2017 Issuance of Amendments Adopting Alternative Source Term, TSTF-448, and TSTF-312 (CAC Nos. MF8861, MF8862, MF8916, MF8917, MF8918, MF8919; Epids Nos. L-2016-LLA-0017,L-2016-LLA-0018, L-2016-LLA-0019) ML17269A1662017-11-0101 November 2017 Issuance of Amendments Related to NFPA 805 Supplement (CAC Nos. MG0094 and MG0095; EPID L-2017-LLA-0261) ML17214A5462017-10-0202 October 2017 Issuance of Amendments Regarding the Adoption of TSTF-547, Revision 1, Clarification of Rod Position Requirements ML17205A0202017-09-15015 September 2017 Issuance of Amendments to Revise TS 3.8.9, Distribution Systems - Operating ML17152A2182017-06-30030 June 2017 Southern Nuclear Fleet - Issuance of Amendments Regarding the Adoption of TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing (CAC Nos. MF8176 - MF8181) ML17137A0412017-06-27027 June 2017 Issuance of Amendments Regarding the Adoption of TSTF-529, Revision 4, Clarify Use and Application Rules (CAC Nos. MF8897, MF8898, MF8900-MF8902, and MF8921) ML17023A2372017-03-16016 March 2017 Issuance of Amendments Regarding the Adoption of NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors(Cac Nos. MF7460-MF7465) ML16141A1252017-03-14014 March 2017 Issuance of Amendments to Incorporate Southern Nuclear Operating Company Fleet Emergency Plan ML17034A1932017-02-16016 February 2017 Issuance of Amendments to Adopt TSTF-427 Allowance for Non Technical Specification Barrier Degradation on Supported System Operability ML16291A0302017-01-13013 January 2017 Issuance of Amendments the Adoption of TSTF-65-A, Rev. 1, Use of Generic Titles for Utility Positions (CAC Nos. MF7466, MF7467, MF7468, MF7469, MF7470, & MF7471) NL-16-0388, Alternative Source Term License Amendment Request2016-11-22022 November 2016 Alternative Source Term License Amendment Request ML16196A1612016-11-17017 November 2016 Issuance of Amendments Related to Technical Specification 3.3.5 ML16232A0002016-10-17017 October 2016 Issuance of Amendments Related to NFPA-805 Supplement NL-16-0388, Draft License Amendment Request Regarding Alternative Source Team2016-10-15015 October 2016 Draft License Amendment Request Regarding Alternative Source Team 2023-08-30
[Table view] |
Text
ATTACHMENT TO LICENSE AMENDMENT NO.
TO RENEWED FACILITY OPERATING LICENSE NO. NPF-2 DOCKET NO. 50-348 Replace the following pages of the Appendix A Technical Specifications with the attached revised pages. The revised pages are identified by amendment number and contain marginal lines indicating the areas of change.
Remove Insert 9 9 10
(9) The foregoing conditions shall be implemented in a manner consistent with the provisions of the Federal Power Act and the Alabama Public Utility laws and regulations thereunder and all rates, charges, services or practices in connection therewith are to be subject to the approval of regulatory agencies having jurisdiction over them.
Southern Nuclear shall not market or broker power or energy from Joseph M. Farley Nuclear Plant, Units 1 and 2. Alabama Power Company shall continue to be responsible for compliance with the obligations imposed on it by the antitrust conditions contained in this paragraph 2.F. of the renewed license. Alabama Power Company shall be responsible and accountable for the actions of its agent, Southern Nuclear, to the extent said agent's actions may, in any way, contravene the antitrust conditions of this paragraph 2.F.
2 "Entitlement" includes, but is not limited to, power made available to an entity pursuant to an exchange agreement.
Revised by letter dated August 2, 2007 Farley - Unit 1 Renewed License No. NPF-2
G. Mitigation Strategy License Condition The licensee shall develop and maintain strategies for addressing large fires and explosions and that include the following key areas:
(a) Fire fighting response strategy with the following elements:
- 1. Pre-defined coordinated fire response strategy and guidance
- 2. Assessment of mutual aid fire fighting assets
- 3. Designated staging areas for equipment and materials
- 4. Command and control
- 5. Training of response personnel (b) Operating to mitigate fuel damage considering the following:
- 1. Protection and use of personnel assets
- 2. Communications
- 3. Minimizing fire spread
- 4. Procedures for implementing integrated fire response strategy
- 5. Identification of readily-available pre-staged equipment
- 6. Training on integrated fire response strategy H. In accordance with the requirement imposed by the October 8, 1976 order of the United States Court of Appeals for the District of Columbia Circuit in Natural Resources Defense Council vs. Nuclear Regulatory Commission, No. 74-1385 and 74-1586, that the Nuclear Regulatory Commission "shall make any licenses granted between July 21, 1976 and such time when the mandate is issued subject to the outcome of such proceeding herein," this renewed license shall be subject to the outcome of such proceedings.
I. This renewed operating license is effective as of the date of issuance and shall expire at midnight on June 25, 2037.
FOR THE NUCLEAR REGULATORY COMMISSION J. E. Dyer, Director Office of Nuclear Reactor Regulation Attachments:
- 1. Appendix A - Technical Specifications
- 2. Preoperational Tests, Startup Tests and Other Items Which Must Be Completed Prior to Proceeding to Succeeding Operational Modes
- 3. Appendix B - Environmental Protection Plan
- 4. Appendix C - Additional conditions Date of Issuance: May 12, 2005 Revised by letter dated August 2, 2007 Farley - Unit 1 Renewed License No. NPF-2
ATTACHMENT TO LICENSE AMENDMENT NO.
TO RENEWED FACILITY OPERATING LICENSE NO. NPF-8 DOCKET NO. 50-364 Replace the following pages of the Appendix A Technical Specifications with the attached revised pages. The revised pages are identified by amendment number and contain vertical lines indicating the areas of change.
Remove Insert 8 8 9 9
determined in accordance with the principles set forth in Condition (3) herein.
Alabama Power Company shall make reasonable provisions for disclosed transmission requirements of any distribution system(s) in planning future transmission. "Disclosed" means the giving of reasonable advance notification of future requirements by said distribution system(s) utilizing wheeling services to be made available by Alabama Power Company.
(8) Additional Conditions The Additional Conditions contained in Appendix C, as revised through Amendment No. 278, are hereby incorporated into this license. FENOC shall operate the facility in accordance with the Additional Conditions.
(9) The foregoing conditions shall be implemented in a manner consistent with the provisions of the Federal Power Act and the Alabama Public Utility laws and regulations thereunder and all rates, charges, services or practices in connection therewith are to be subject to the approval of regulatory agencies having jurisdiction over them.
Southern Nuclear shall not market or broker power or energy from Joseph M.
Farley Nuclear Plant, Units 1 and 2. Alabama Power Company shall continue to be responsible for compliance with the obligations imposed on it by the antitrust conditions contained in this paragraph 2.F. of the renewed license. Alabama Power Company shall be responsible and accountable for the actions of its agent, Southern Nuclear, to the extent said agent's actions may, in any way, contravene the antitrust conditions of this paragraph 2.F.
G. The facility requires relief from certain requirements of 10 CFR 50.55a(g) and exemptions from Appendices G, H and J to 10 CFR Part 50. The relief and exemptions are described in the Office of Nuclear Reactor Regulation's Safety Evaluation Report, Supplement No. 5. They are authorized by law and will not endanger life or property or the common defense and security and are otherwise in the public interest. Therefore, the relief and exemptions are hereby granted. With the granting of these relief and exemptions, the facility will operate, to the extent authorized herein, in conformity with the application, as amended, the provisions of the Act, and the rules and regulations of the Commission.
H. Southern Nuclear shall immediately notify the NRC of any accident at this facility which could result in an unplanned release of quantities of fission products in excess of allowable limits for normal operation established by the Commission.
I. Mitigation Strategy License Condition The licensee shall develop and maintain strategies for addressing large fires and explosions and that include the following key areas:
Revised by letter dated August 2, 2007 Farley - Unit 2 Renewed License No. NPF-8 (a) Fire fighting response strategy with the following elements:
- 1. Pre-defined coordinated fire response strategy and guidance
- 2. Assessment of mutual aid fire fighting assets
- 3. Designated staging areas for equipment and materials
- 4. Command and control
- 5. Training of response personnel (b) Operating to mitigate fuel damage considering the following:
- 1. Protection and use of personnel assets
- 2. Communications
- 3. Minimizing fire spread
- 4. Procedures for implementing integrated fire response strategy
- 5. Identification of readily-available pre-staged equipment
- 6. Training on integrated fire response strategy (c) Actions to minimize release to include consideration of:
- 1. Water spray scrubbing
- 2. Dose to onsite responders J. Alabama Power Company shall have and maintain financial protection of such type and in such amounts as the Commission shall require in accordance with Section 170 of the Atomic Energy Act of 1954, as amended, to cover public liability claims.
K. This renewed operating license is effective as of the date of issuance and shall expire at midnight on March 31, 2041.
FOR THE NUCLEAR REGULATORY COMMISSION J. E. Dyer, Director Office of Nuclear Reactor Regulation
Attachment:
- 1. Appendix A - Technical Specifications (NUREG-0697, as revised)
- 2. Appendix B - Environmental Protection Plan
- 3. Appendix C - Additional conditions Date of Issuance: May 12, 2005 Revised by letter dated August 2, 2007 Farley - Unit 2 Renewed License No. NPF-8