Extension of Schedule for the Conduct of Review of the Vermont Yankee Nuclear Power Station License Renewal Application
ML072120050
Person / Time
Site: Vermont Yankee Entergy icon.png
Issue date: 07/31/2007
From: Kuo P
NRC/NRR/ADRO/DLR
To: Balduzzi M
Entergy Nuclear Operations
Rogers, Bill, NRR, (301)415-2945
References
Download: ML072120050 (7)


Text

July 31, 2007Mr. Michael A. BalduzziSr. Vice President & COO Regional Operations, NE Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601

SUBJECT:

EXTENSION OF SCHEDULE FOR THE CONDUCT OF REVIEW OF THEVERMONT YANKEE NUCLEAR POWER STATION LICENSE RENEWAL APPLICATION

Dear Mr. Balduzzi:

The safety evaluation report (SER) with confirmatory items, in support of the staff's review ofthe Entergy Nuclear Vermont Yankee, LLC, license renewal application for the Vermont Yankee Nuclear Power Station (VYNPS), was issued on March 30, 2007. The staff identified six confirmatory items related to the identification of the nonsafety-related portions of the service water, circulating water, and reactor water cleanup systems to be included within the scope of license renewal.In February 2007, U.S. Nuclear Regulatory Commission (NRC) Region I performed a licenserenewal scoping inspection and reviewed the information related to these confirmatory items.

The inspection team determined that VYNPS had not identified all boundaries of nonsafety-related systems, attached to safety-related systems to be included within the scope of license renewal, as documented in the June 5, 2007, inspection report. Subsequently, the applicant reviewed the boundaries of nonsafety-related systems, attached to safety-related systems, to be included within the scope of license renewal to address the issues identified during the inspection. During a telephone conversation on June 1, 2007, the staff requested that VYNPS address the completeness of scoping activities for nonsafety-related systems, attached to safety-related systems as a supplemental response to an earlier request for additional information (RAI 2.1-2).By letter dated July 3, 2007, VYNPS provided additional information, as a supplementalresponse to the RAI 2.1-2, to address the confirmatory items, and to address the issues identified during the NRC inspection. The letter included the scoping boundaries for certain nonsafety-related systems within the scope of license renewal and discussed new component types. However, the letter did not provide sufficient information to allow the staff to complete its review. During a telephone conversation on July 5, 2007, the staff requested that VYNPS indicate any new component types which were brought within the scope of license renewal due to the identification of the scoping boundaries identified in the July 3, 2007, letter to the NRC.

By letter dated July 30, 2007, VYNPS provided additional information which included sixteen new systems to be added to the scope of license renewal, changes to thirty six systems related to nonsafety-related system components, and addition or revision to thirty two aging management review (AMR) tables.

M. Balduzzi-2-The staff has performed an initial review of the information that VYNPS provided by letter datedJuly 30, 2007, and has determined that substantial changes have been included in the areas of scoping and AMR. In addition, the information that was provided does not incorporate certain commitments made to the NRC as a result of the staff's audit and review activities. Therefore, the staff requests that VYNPS review the information contained in the July 30, 2007, letter for accuracy and submit the revised information.Due to the volume and complexity of the information, the final SER will not be issued on August 1, 2007, as originally scheduled. Upon receipt of satisfactory information which allows us to complete our review, the NRC staff will issue a revised review schedule. The staff will extend the overall schedule beyond the nominal thirty months (with hearing) by a minimum of two months plus the length of time required by VYNPS to submit the revised information.This letter can be accessed in the Agency Documents Access and Management System, under(Accession No. ML072120050). If you have any questions, please contact Jonathan Rowley of my staff by telephone at 301-415-4053 or via e-mail at JGR@nrc.gov

.Sincerely,/RA/Pao-Tsin Kuo, DirectorDivision of License Renewal Office of Nuclear Reactor RegulationDocket No. 50-271 cc: See next page M. Balduzzi-2-The staff has performed an initial review of the information that VYNPS provided by letter datedJuly 30, 2007, and has determined that substantial changes have been included in the areas of scoping and AMR. In addition, the information that was provided does not incorporate certain commitments made to the NRC as a result of the staff's audit and review activities. Therefore, the staff requests that VYNPS review the information contained in the July 30, 2007, letter for accuracy and submit the revised information.Due to the volume and complexity of the information, the final SER will not be issued on August 1, 2007, as originally scheduled. Upon receipt of satisfactory information which allows us to complete our review, the NRC staff will issue a revised review schedule. The staff will extend the overall schedule beyond the nominal thirty months (with hearing) by a minimum of two months plus the length of time required by VYNPS to submit the revised information.This letter can be accessed in the Agency Documents Access and Management System, under(Accession No. ML072120050). If you have any questions, please contact Jonathan Rowley of my staff by telephone at 301-415-4053 or via e-mail at JGR@nrc.gov

.Sincerely,/RA/Pao-Tsin Kuo, DirectorDivision of License Renewal Office of Nuclear Reactor RegulationDocket No. 50-271 cc: See next pageADAMS Accession No.: ML072120050OFFICEPM:RLRB:DLRLA:DLRPM:RLRB:DLRBC:RLRB:DLROGCD:DLRNAMEBRogersIKingJRowleyRAuluckLSubinPTKuo DATE07/31/0707/31/0707/31/0707/31/0707/31/0707/31/07OFFICIAL FILE COPY Letter to M. Balduzzi, from PTKuo, dated July 31, 2007

SUBJECT:

EXTENSION OF SCHEDULE FOR THE CONDUCT OF REVIEW OF THEVERMONT YANKEE NUCLEAR POWER STATION LICENSE RENEWAL APPLICATIONDISTRIBUTION

HARD COPY: DLR RFE-MAIL:PUBLICSSmith (srs3)

SDuraiswamy RidsNrrDlr RidsNrrDlrRlra RidsNrrDlrRlrb RidsNrrDlrRlrc RidsNrrDlrReba RidsNrrDlrRebb

RidsNrrDci RidsNrrDra RidsNrrDe RidsNrrDeEemb RidsNrrDeEeeb

RidsNrrDss RidsOgcMailCenter RidsNrrAdes


JRowley RLaufer JShea CAnderson, RI RPowell, RI DScrenci, RI MModes, RI DPelton, SRI MYoung RidsOpaMail Vermont Yankee Nuclear Power Station cc:Regional Administrator, Region IU. S. Nuclear Regulatory Commission

475 Allendale Road King of Prussia, PA 19406-1415Mr. David R. LewisPillsbury Winthrop Shaw Pittman, LLP 2300 N Street, N.W.

Washington, DC 20037-1128Mr. David O'Brien, CommissionerVermont Department of Public Service 112 State Street Montpelier, VT 05620-2601Mr. James Volz, ChairmanPublic Service Board State of Vermont 112 State Street Montpelier, VT 05620-2701Chairman, Board of Selectmen Town of Vernon P.O. Box 116 Vernon, VT 05354-0116Operating Experience CoordinatorVermont Yankee Nuclear Power Station 320 Governor Hunt Road Vernon, VT 05354G. Dana Bisbee, Esq.Deputy Attorney General 33 Capitol Street Concord, NH 03301-6937Chief, Safety Unit Office of the Attorney General One Ashburton Place, 19th Floor Boston, MA 02108Ms. Carla A. White, RRPT, CHPRadiological Health Vermont Department of Health P.O. Box 70, Drawer #43 108 Cherry Street Burlington, VT 05402-0070Mr. David MannaiManager, Licensing Vermont Yankee Nuclear Power Station P.O. Box 0500 185 Old Ferry Road Brattleboro, VT 05302-0500Resident InspectorVermont Yankee Nuclear Power Station U. S. Nuclear Regulatory Commission P.O. Box 176 Vernon, VT 05354Director, Massachusetts Emergency Management Agency ATTN: James Muckerheide 400 Worcester Rd.

Framingham, MA 01702-5399Jonathan M. Block, Esq.Main Street P.O. Box 566 Putney, VT 05346-0566Mr. John F. McCannDirector, Licensing Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601Mr. Gary J. TaylorChief Executive Officer Entergy Operations 1340 Echelon Parkway Jackson, MS 39213Mr. John T. Herron Sr. Vice President Entergy Nuclear Operations, Inc.

1340 Echelon Parkway Jackson, MS 39213Mr. Oscar LimpiasVice President, Engineering Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601 Vermont Yankee Nuclear Power Station cc:-2-Mr. Christopher SchwartzVice President, Operations Support Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601Mr. Michael J. ColombDirector of Oversight Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601Mr. Travis C. McCulloughAssistant General Counsel Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601Mr. Theodore SullivanSite Vice President Entergy Nuclear Operations, Inc.

Vermont Yankee Nuclear Power Station P.O. Box 0500 185 Old Ferry Road Brattleboro, VT 05302-0500Mr. James H. Sniezek5486 Nithsdale Drive Salisbury, MD 21801Mr. Garrett D. Edwards814 Waverly Road Kennett Square, PA 19348Ms. Stacey M. LousteauTreasury Department Entergy Services, Inc.

639 Loyola Avenue New Orleans, LA 70113Mr. Norman L. RademacherDirector, NSA Vermont Yankee Nuclear Power Station P.O. Box 0500 185 Old Ferry Road Brattleboro, VT 05302-0500Mr. Raymond ShadisNew England Coalition Post Office Box 98 Edgecomb, ME 04556Mr. James P. MatteauExecutive Director Windham Regional Commission 139 Main Street, Suite 505 Brattleboro, VT 05301Mr. William K. ShermanVermont Department of Public Service 112 State Street Drawer 20 Montpelier, VT 05620-2601Mr. Michael D. Lyster5931 Barclay Lane Naples, FL 34110-7306Ms. Charlene D. FaisonManager, Licensing 440 Hamilton Avenue White Plains, NY 10601Ms. Julie KeysNuclear Energy Institute 1776 I Street, NW, Suite 400 Washington, DC 20006-3708Diane Curran, Esq.Harmon, Curran, Spielberg &

Eisenberg, L.L.P 1726 M Street, NW, Suite 600 Washington, DC 20036Ronald A. Shems, Esq.Shems, Dunkiel, Kassel & Saunders, PLLC 91 College Street Burlington, VT 05401Karen Tyler, Esq.Shems, Dunkiel, Kassel & Saunders, PLLC 91 College Street Burlington, VT 05401 Vermont Yankee Nuclear Power Station cc:-3-Sarah Hofmann, Esq.Director of Public Advocacy Department of Public Service 112 State Street - Drawer 20 Montpelier, VT 05620-2601Jennifer J. Patterson, Esq.Office of the New Hampshire Attorney General 33 Capitol Street Concord, NH 03301Matias F. Travieso-Diaz, Esq.Pillsbury Winthrop Shaw Pittman LLP 2300 N Street, NW Washington, DC 20037-1128Matthew Brock, Esq.Assistant Attorney General Office of the Massachusetts Attorney General Environmental Protection Division One Ashburton Place, Room 1813 Boston, MA 02108-1598Anthony Z. Roisman, Esq.National Legal Scholars Law Firm 84 East Thetford Rd.

Lyme, NH 03768Mr. Michael R. KanslerPresident & CEO / CNO Entergy Nuclear Operations 1340 Echelon Parkway Jackson, MS 39213Mr. Williams F. MaguireGeneral Manager, Plant Operations Entergy Nuclear Operations Vermont Yankee Nuclear Power Station 320 Governor Hunt Road Vernon, VT 05354Mr. John A. VentosaGM, Engineering Entergy Nuclear Operations 440 Hamilton Avenue White Plains, NY 10601Mr. Joseph P. DeRoyVP, Operations Support Entergy Operations, Inc.

1340 Echelon Parkway Jackson, MS 39213Mr. John R. DreyfussDirector, NSA Entergy Nuclear Operations Vermont Yankee Nuclear Power Station 320 Governor Hunt Road Vernon, VT 05354Mr. David J. MannaiManager, Licensing Entergy Nuclear Operations Vermont Yankee Nuclear Power Station P.O. Box 500 185 Old Ferry Road Brattleboro, VT 05302-0500Mr. William C. DennisAssistant General Counsel Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601