MONTHYEARML23271A1612023-09-28028 September 2023 PSEG Non-Proprietary Presentation for Pre-submittal Meeting on September 28, 2023 ML23157A0352023-06-0606 June 2023 Annual Assessment Meeting for Pa/Md/Ny/Nj Nuclear Power Plants - NRC Presentation Slides ML23144A0072023-05-24024 May 2023 PSEG Slides: NRC Pre-Submittal Meeting, May 25, 2023 ML22319A2432022-11-17017 November 2022 Stations - Nuclear Regulatory Commission: Threshold Determination Pre-submittal Meeting on November 17, 2022 (EPID L-2022-LRM-0090) (Slides) ML22132A0042022-05-26026 May 2022 PSEG Pre-submittal Meeting Slides - May 26, 2022 ML21165A2882021-06-16016 June 2021 Joint Annual Assessment for Pa/Md/Nj/Ny Nuclear Power Plants - Webinar Presentation (Updated) ML21165A1942021-06-16016 June 2021 Joint Annual Assessment Meeting for Pa/Md/Nj/Ny Nuclear Power Plants - Webinar Presentation ML21057A0012021-03-0404 March 2021 PSEG Slides - NRC Pre Submittal Meeting, March 4, 2021 ML20195A3962020-07-13013 July 2020 Pseg/Nrc Pre-Submittal Meeting - Salem Pressurizer Weld Interval Extension Request for Alternative (Presentation Slides) - July 20, 2020 ML20104C0352020-04-15015 April 2020 Pseg/Nrc Pre-Submittal Meeting, Salem Expanded Scope Leak-Before-Break Amendment Request - April 15, 2020 ML19101A3982019-04-10010 April 2019 Annual Assessment Presentation Slides 2019 ML18156A0172018-05-30030 May 2018 Annual Assessment Meeting Slides 05-30-2018 ML18032A3312018-02-0101 February 2018 Presubmittal Meeting Regarding Inverters AOT Slides - February 1, 2018 ML17291B0822017-10-18018 October 2017 Supplemental Inspection Results ML17199S2902017-07-19019 July 2017 TSTF-411 and TSTF-418 Pre-submittal Meeting Slides ML17097A1762017-04-0707 April 2017 PSEG Annual Assessment Meeting Handout Presentation ML16089A0702016-03-30030 March 2016 Public Meeting Slide Presentation ML14162A4402014-06-12012 June 2014 Salem Generating Station, Near-term Task Force Recommendation 2.1 Seismic Hazard Evaluation, Public Meeting Presentation Slides ML14162A4322014-06-11011 June 2014 PSEG Slides for Seismic Reevaluation Public Meeting ML13064A3232013-02-28028 February 2013 NRC Presentation on Bypass Testing ML1129700652011-10-21021 October 2011 Summary of PSEG Drop-in Visit, 9-28-2011 and Slides ML1125200382011-09-19019 September 2011 Summary of, Meeting with PSEG Nuclear LLC to Discuss Proposed License Amendment Regarding Reactor Coolant System Activity for Salem Nuclear Generating Station, Unit Nos. 1 and 2 ML1113601722011-05-10010 May 2011 NRC Slides for 2011 Aam, Salem/Hope Creek ML1107605812011-03-11011 March 2011 Slides- Audit of Salem'S Use of Westems Fatigue Software ML1032805762010-11-17017 November 2010 Summary of Public Meetings Conducted to Discuss the Draft Supplemental Environmental Impact Statement Related to the Review of the Hope Creek Generating Station and Salem Nuclear Generating Station, Units 1 and 2, LRA - Meeting Slides ML1014605102010-05-27027 May 2010 Pseg'S NRC ISFSI Presentation May 27, 2010 ML1014701832010-05-26026 May 2010 PSEG Drop-in May 26, 2010 - NRC Slides ML1011004372010-04-19019 April 2010 NRC Slides for Salem and Hope Creek Annual Assessment Meeting, April 6, 2010 ML1011004322010-04-19019 April 2010 PSEG Slides for Salem and Hope Creek Annual Assessment Meeting, April 6, 2010 ML0933801182009-11-0505 November 2009 Public Meeting Slides from November 5, 2009 ML1029505812009-10-21021 October 2009 Bne Presentation, Buried Pipe Program by Jim Melchionna ML0917003212009-06-18018 June 2009 PSEG Slides from Drop-in Meeting, 6-18-2009 ML0910604822009-05-0505 May 2009 NRC Slides, for 5/5/09 Public Meeting ML0912605532009-05-0505 May 2009 PSEG Nuclear Slides, Salem/Hope Creek Aam, 5/5/09 ML0912702392009-05-0404 May 2009 Calvert County Sheriff- Special Operations Team ML0912406092009-04-23023 April 2009 Meeting, Slides, New Jersey State Police Response to Hostile Action at Nuclear Power Plants, National Radiological Emergency Preparedness Conference ML0902600612009-01-26026 January 2009 Slides from PSEG, Salem Public Mtg 01-21-09 ML0811903682008-04-30030 April 2008 MSPI - How It Works ML0812605262008-04-30030 April 2008 Slides from NRC Annual Assessment Meeting 2007 Reactor Oversight Process for Salem Units 1 and 2, and Hope Creek ML0729806642007-10-24024 October 2007 Meeting Presentation on Update on Generic Safety Issue 191 Plant Audits ML0721103842007-07-25025 July 2007 USNRC Presentation Titled SRA Update. ML0615902582006-06-0101 June 2006 Slides for Meeting Salem Service Water Simplification Project ML0615106012006-05-23023 May 2006 EPRI HRA Users Group Review of Draft NUREG-1842 ML0613805762006-05-17017 May 2006 NRC Slides for the Public Meeting with PSEG to Discuss Annual Assessment of Salem and Hope Creek Stations for CY2005 ML0613805882006-05-17017 May 2006 Licensee (PSEG) Slides from Public Meeting with NRC to Discuss CY2005 Performance of Salem and Hope Creek Stations ML0606005342006-02-0101 February 2006 Salem/Hc SCWE Presentation Handouts ML0601700752005-12-13013 December 2005 CO2 System Review, December 13, 2005 ML0533303322005-11-17017 November 2005 NRC Slide Presentation for SCWE Update Public Meeting ML0533303232005-11-17017 November 2005 PSEG Slide Presentation for Public Meeting Updating SCWE Initiatives ML0526302192005-06-29029 June 2005 NRC Oversight Status of Salem & Hope Creek Organizational Effectiveness & Work Environment Presentation 2023-09-28
[Table view] |
Text
SRA UDATE
" SDP Timeliness
" Phase 2 Pre-solved Tables
- Changing Missed TS Surveillance Requirements (TS SR 3.0.4)
" Knowledge Transfer 1
Process Map - Existing Process Per Manual Chapter 0609, The Agency's goal for SDP timeliness is that all final significance determinations be completed within 90 days from the issue date of the first official correspondence that described the finding and documented the need for further review to determine significa e.
To II cueI Approximated milestone Do STo + 30 DAYS - Choice letter for meeting 90 DAY issued based on the SERP goalperMC0609 To + 40 DAYS- Licensee
': responds to choice letter I I To + 70 DAYS - Regulatory Conference is held I I I
I I
I.
I I
To+90 FINAL ILETTER ISSUED To 30 40 70 90 2
The SDP Process Map - Existing Rt~les*
Per Manual Chapter 0609, The Agency's g all final significance determinations be completed within 90 days from the issue date of the first official correspondence that described the finding and documented the need for further review to determine significance. To maximize the available time the KEY is to get the SDP completed prior to issuance of the JR at To.
Cn To - Issue Documentedroximated milestone To + 30 DAYS - Choice letter
- r meeting 906DAY9 issued based on the SERP STo + 40 DAYS-Licensee
_____ responds to choice letter
_~__To + 70 DAYS - Regulatory Conference is held S" -- --- , .- LE-/T .ER ISSUED ordon! W illiams ,ik, ,, ,e....
To - 45 To 30 Sckt Sparks Wlat Rog9ers 3
The SDP Process Process Map - Existing Process Bas ic Flowchart of typical >GREEN SDP 4
item.
Salem Gas Turbine
- Credit given in PRA and SDP as an almost immediately available AC source.
" Actually could not be lined-up to safety busses for 2-4 hours.
- Team completed detailed procedure reviews, interviews and observed a timed plant walkdown.
- Good interaction between the team, the SRA, DRS staff, licensee.
5
TS Risk Initiatives Eight initiatives for fundamental improvements to the STS are being developed by the industry and discussed with the NRC staff in public meetings:
" Initiative 1, TS Actions End States Modifications: This initiative would permit, for some systems, entry into hot shutdown rather than cold shutdown to repair equipment;
" Initiative 2, Missed Surveillances, Surveillance Requirement (SR) 3.0.3:
This initiative permits the extension of up to one surveillance interval of an inadvertently missed surveillance, after assessing and managing the risk (approved September 2001);
" Initiative 3, Modification of Mode Restraint Requirements of Limiting.
Condition for Operation (LCO) 3.0.4 and SR 3.0.4: This initiative permits, for most systems, transitioning up in mode with inoperable equipment, relying on compliance with the technical specification actions of the higher mode, after assessing and managing the risk (approved April 2003);
" Initiative 4b, Flexible Completion Times: This initiative would permit, contingent upon the results of a plant configuration risk assessment, temporary extension of the existing completion time within an LCO using a quantitative implementation of 50.65(a)(4);
6
- Initiative 5b, Relocation of all SR Frequency Requirements out of TS:
This initiative would permit SR frequencies to be determined in and relocated to a licensee-controlled TS program;
" Initiative 6, Modification of LCO 3.0.3 Actions and Completion Times:
This initiative would convert default or explicit entry into the LCO 3.0.3 shutdown track into a completion time for corrective action before beginning shutdown;
" Initiative 7, Non-TS Support System Impact on TS Operability Determinations: This initiative would permit a risk-informed delay time before entering LCO actions for inoperability due to loss of support function provided by equipment outside of technical specifications;
- Initiative 8a and 8b, Remove/Relocate Non-safety and Non-risk Significant Systems from TS that do not meet the four criteria of 10 CFR 50.36: Initiative 8a would review technical specifications to remove systems that were included solely because they were judged risk significant at one time and have now been shown by analysis not to be. Initiative 8b would make the scope of technical specifications depend only on risk significance.