ML072060210
| ML072060210 | |
| Person / Time | |
|---|---|
| Site: | Ginna |
| Issue date: | 07/26/2007 |
| From: | Plant Licensing Branch III-2 |
| To: | |
| Pickett, DV, NRR, DLPM, 415-1364 | |
| Shared Package | |
| ML072040401 | List: |
| References | |
| EA-02-026, TAC MD4535 | |
| Download: ML072060210 (6) | |
Text
ENCLOSURE 1 REVISED PAGES OF RENEWED FACILITY OPERATING LICENSE NO. DPR-18 DOCKET NO. 50-244 R. E. GINNA NUCLEAR POWER PLANT Replace the following pages of the Renewed Facility Operating License. The revised pages are identified by the date of the letter issuing these pages and contain marginal lines indicating the areas of change.
REMOVE INSERT 4
4 5
5 6
6 Revised by letter dated July 26, 2007 SE supplements dated December 17, 1980, February 6, 1981, June 22, 1981, February 27, 1985, and March 21, 1985 or configurations subsequently approved by the NRC, subject to provision (b) below.
(b)
The licensee may make changes to the approved fire protection program without prior approval of the Commission only if those changes would not adversely affect the ability to achieve and maintain safe shutdown in the event of a fire.
(c)
Deleted (4)
Deleted (5)
Deleted (6)
Deleted (7)
License Transfer (a)
On the closing date of the transfer of the facility, Ginna LLC shall obtain from RG&E the greater of (1) $200,791,928 or (2) the amount necessary to meet the minimum formula amount under 10 CFR 50.75 calculated as of the date of closing for decommissioning funding assurance for the facility, and ensure the deposit of such funds into a decommissioning trust for the facility established by Ginna LLC.
(b)
The decommissioning trust agreement must be in a form acceptable to the NRC.
(c)
The licensee shall take all necessary steps to ensure that the decommissioning trust is maintained in accordance with the application and the requirements of the Order approving license transfer, and shall be consistent with the Safety Evaluation supporting that Order.
(8)
Mitigation Strategy Ginna LLC shall develop and maintain strategies for addressing large fires and explosions and that include the following key areas:
(a)
Fire fighting response strategy with the following elements:
- 1.
Pre-defined coordinated fire response strategy and guidance
- 2.
Assessment of mutual aid fire fighting assets Revised by letter dated July 26, 2007
- 3.
Designated staging areas for equipment and materials
- 4.
Command and control
- 5.
Training of response personnel (b)
Operations to mitigate fuel damage considering the following:
- 1.
Protection and use of personnel assets
- 2.
Communications
- 3.
Minimizing fire spread
- 4.
Procedures for implementing integrated fire response strategy
- 5.
Identification of readily-available pre-staged equipment
- 6.
Training on integrated fire response strategy
- 7.
Spent fuel pool mitigation measures (c)
Actions to minimize release to include consideration of:
- 1.
Water spray scrubbing
- 2.
Dose to onsite responders D.
The facility requires an exemption from certain requirements of 10 CFR 50.46(a)(1). This includes an exemption from 50.46(a)(1), that emergency core cooling system (ECCS) performance be calculated in accordance with an acceptable calculational model which conforms to the provisions in Appendix K (SER dated April 18, 1978). The exemption will expire upon receipt and approval of revised ECCS calculations. The aforementioned exemption is authorized by law and will not endanger life property or the common defense and security and is otherwise in the public interest. Therefore, the exemption is hereby granted pursuant to 10 CFR 50.12.
E.
The licensee shall fully implement and maintain in effect all provisions of the Commission-approved physical security, training and qualification, and safeguards contingency plans including amendments made pursuant to provisions of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (51 FR 27827 and 27822) and to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The combined set of plans, which contains Safeguards Information protected under 10 CFR 73.21, is entitled: R. E. Ginna Nuclear Power Plant Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, submitted by letter dated May 15, 2006.
F.
The Updated Final Safety Analysis Report supplement, submitted pursuant to 10 CFR 54.21(d), describes certain future activities to be completed prior to the period of extended operation. Ginna LLC shall complete these activities no later than September 18, 2009, and shall notify the Commission in writing when implementation of these activities is complete and can be verified by NRC inspection.
Revised by letter dated July 26, 2007 The Updated Final Safety Analysis Report supplement, as revised, shall be included in the next scheduled update to the Updated Final Safety Analysis Report required by 10 CFR 50.71(e)(4) following issuance of this renewed license. Until that update is complete, Ginna LLC may make changes to the programs and activities described in the supplement without prior Commission approval, provided that Ginna LLC evaluates each such change pursuant to the criteria set forth in 10 CFR 50.59 and otherwise complies with the requirements in that section.
G.
All capsules in the reactor vessel that are removed and tested must meet the test procedures and reporting requirements of ASTM E 185-82 to the extent practicable for the configuration of the specimens in the capsule. Any changes to the capsule withdrawal schedule, including spare capsules, must be approved by the NRC prior to implementation. Any capsules placed in storage must be maintained for future insertion, unless approved by the NRC.
H.
This renewed license is effective as of the date of issuance and shall expire at midnight on September 18, 2029.
FOR THE NUCLEAR REGULATORY COMMISSION Original signed by J. E. Dyer, Director Office of Nuclear Reactor Regulation
Attachment:
Appendix A - Technical Specifications Date of Issuance: May 19, 2004