ML072060003

From kanterella
Jump to navigation Jump to search

Revised Pages of Facility Operating License No. NPF-38
ML072060003
Person / Time
Site: Waterford Entergy icon.png
Issue date: 07/26/2007
From: Harold Denton
Office of Nuclear Reactor Regulation
To:
vaidya B, NRR/DLPM, 415-3308
Shared Package
ML072050002 List:
References
TAC MD4569
Download: ML072060003 (3)


Text

Enclosure 1 REVISED PAGES OF FACILITY OPERATING LICENSE NO. NPF-38 DOCKET NO. 50-382 WATERFORD STEAM ELECTRIC STATION, UNIT 3 Replace the following pages of the Facility Operating License. The revised pages are identified by the date of the letter issuing these pages and contain marginal lines indicating the areas of change.

REMOVE INSERT Page 8 Page 8 Page 9 Page 9 d.

Prior to completion of Phase IIl of the Waterford 3 startup test program, the licensee shall complete corrective actions related to the 23 NRC issues as identified in the LP&L responses.

17.

Basemat The licensee shall comply with its commitments to perform a basemat cracking surveillance program and additional confirmatory analyses of basemat structural strength as described in its letter of February 25, 1985. Any significant change to this program shall be reviewed and approved by the NRC staff prior to its implementation.

18.

Mitigation Strategy License Condition l

l Develop and maintain strategies for addressing large fires and explosions and l

that include the following key areas:

l l

(a)

Fire fighting response strategy with the following elements:

l

1.

Pre-defined coordinated fire response strategy and l

guidance l

2.

Assessment of mutual aid fire fighting assets l

3.

Designated staging areas for equipment and materials l

4.

Command and control l

5.

Training of response personnel l

l (b)

Operations to mitigate fuel damage considering the following:

l

1.

Protection and use of personnel assets l

2.

Communications l

3.

Minimizing fire spread l

4.

Procedures for implementing integrated fire response l

strategy l

5.

Identification of readily-available pre-staged equipment l

6.

Training on integrated fire response strategy l

7.

Spent fuel pool mitigation measures l

l (c)

Actions to minimize release to include consideration of:

l

1.

Water spray scrubbing l

2.

Dose to onsite responders l

D.

The facility requires an exemption from certain requirements of Appendices E and J to 10 CFR Part 50. These exemptions are described in the Office of Nuclear Reactor Regulation's Safety Evaluation Report, Supplement No. 10 (Section 6.1.2) and Supplement No. 8 (Section 6.2.6), respectively. These exemptions are authorized by law and will not endanger life or property or the common defense and security and are otherwise in the public interest. These exemptions are, therefore, hereby granted pursuant to 10 CFR 50.12. With the granting of these exemptions, AMENDMENT NO.

Revised by letter dated July 26, 2007 l

the facility will operate, to the extent authorized herein, in conformity with the application, as amended, the provisions of the Act, and the rules and regulations of the Commission.

E.

EOI shall fully implement and maintain in effect all provisions of the Commission-approved physical security, training and qualification, and safeguards contingency plans including amendments made pursuant to provisions of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (51 FR 27817 and 27822) and to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The plan, which contains Safeguards Information protected under 10 CFR 73.21, is entitled:

"Physical Security, Safeguards Contingency and Training & Qualification Plan, Revision 1," and was submitted on May 16, 2006.

F.

Except as otherwise provided in the Technical Specifications or the Environmental Protection Plan, EOI shall report any violations of the requirements contained in Section 2.C of this license in the following manner. Initial notification shall be made within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> to the NRC Operations Center via the Emergency Notification System with written follow-up within 30 days in accordance with the procedures described in 10 CFR 50.73(b), (c) and (e).

G.

Entergy Louisiana, LLC shall have and maintain financial protection of such type and in such amounts as the Commission shall require in accordance with Section 170 of the Atomic Energy Act of 1954, as amended, to cover public liability claims.

H.

This license is effective as the date of Issuance and shall expire at midnight on December 18, 2024.

FOR THE NUCLEAR REGULATORY COMMISSION original signed by H.R. Denton Harold R. Denton, Director Office of Nuclear Reactor Regulation

Enclosures:

1.

(DELETED)

2.

3.

Appendix A (Technical Specifications) (NUREG-1117) 4.

Appendix B (Environmental Protection Plan) 5.

Appendix C (Antitrust Conditions)

Date of Issuance: March 16, 1985 AMENDMENT NO. 134,171, 203 Revised by letter dated October 23, 2004 Revised by letter dated February 1, 2007 Revised by letter dated July 26, 2007