ENCLOSURE 1 REVISED PAGES OF RENEWED FACILITY OPERATING LICENSE NOS. DPR-58 & DPR-74 DOCKET NOS. 50-315 AND 50-316 DONALD C. COOK NUCLEAR PLANT, UNITS 1 AND 2 Replace the following pages of the Renewed Facility Operating Licenses DPR-58. The revised pages are identified by the date of the letter issuing these pages and contain marginal lines indicating the areas of change.

REMOVE INSERT Page 4A Page 4A Page 4B Replace the following pages of the Renewed Facility Operating Licenses DPR-74. The revised pages are identified by the date of the letter issuing these pages and contain marginal lines indicating the areas of change.

REMOVE INSERT Page 5A Page 5A Page 5B

- 4A -

For SRs that are new in this amendment, the first performance is due at the end of the first surveillance interval, which begins on the date of implementation of this amendment.

For SRs that existed prior to this amendment whose intervals of performance are being reduced, the first reduced surveillance interval begins upon completion of the first surveillance performed after implementation of this amendment.

For SRs that existed prior to this amendment that have modified acceptance criteria, the first performance is due at the end of the first surveillance interval that began on the date the surveillance was last performed prior to the implementation of this amendment, except as noted below for SRs that have modified acceptance criteria as a result of revised allowable values.

For SRs that have modified acceptance criteria as a result of revised allowable values, the current allowable Values and current channel calibration frequencies are required to be met until the trip setpoints are changed to reflect the new allowable values and channel calibration frequencies. The trip setpoints are required to be changed no later than the unit startup after the first planned outage of sufficient duration to change all of the trip setpoints for the unit following implementation of this amendment.

For SRs that existed prior to this amendment whose intervals of performance are being extended, the first extended surveillance interval begins upon completion of the last surveillance performed prior to implementation of this amendment, except as noted above for SRs that have modified acceptance criteria as a result of revised allowable values.

(15) Mitigation Strategy License Condition l

l Develop and maintain strategies for addressing large fires and explosions and l

that include the following key areas:

l l

(a)

Fire fighting response strategy with the following elements:

l

1.

Pre-defined coordinated fire response strategy and guidance l

2.

Assessment of mutual aid fire fighting assets l

3.

Designated staging areas for equipment and materials l

4.

Command and control l

5.

Training of response personnel l

l (b)

Operations to mitigate fuel damage considering the following:

l

1.

Protection and use of personnel assets l

2.

Communications l

3.

Minimizing fire spread l

4.

Procedures for implementing integrated fire response strategy l

5.

Identification of readily-available pre-staged equipment l

6.

Training on integrated fire response strategy l

7.

Spent fuel pool mitigation measures l

Renewed License No. DPR-58 Revised by letter dated August 9, 2007

- 4B -

l (c)

Actions to minimize release to include consideration of:

l

1.

Water spray scrubbing l

2.

Dose to onsite responders l

l (16) The licensee shall implement and maintain all Actions required by Attachment 2 l

to NRC Order EA-06-137, issued June 20, 2006, except the last action that l

requires incorporation of the strategies into the site security plan, contingency l

plan, emergency plan and/or guard training and qualification plan, as l

appropriate.

l D.

Physical Protection The Indiana Michigan Power Company shall fully implement and maintain in effect all provisions of the Commission-approved physical security, training and qualification, and safeguards contingency plans including amendments made pursuant to provisions of the Miscellaneous Amendments and Search Requirements revision to 10 CFR 73.55 (51 FR 27817 and 27822), and the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The combined set of plans1, which contain Safeguards Information protected under 10 CFR 73.21, is entitled: "Donald C. Cook Nuclear Plant Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, Revision 1,"

submitted by letter dated May 10, 2006.

E.

Deleted by Amendment No. 80 F.

Deleted by Amendment No. 80 G.

In all places of this renewed operating license, the reference to the Indiana and Michigan Electric Company is amended to read Indiana Michigan Power Company.

1The Training and Qualification Plan and Safeguards Contingency Plan are Appendices to the Security Plan.

Renewed License No. DPR-58 Corrected by letter dated 4/21/06 12/14/06 Revised by letter dated August 9, 2007

- 5A -

The schedule for the performance of new and revised Surveillance Requirements (SRs) shall be as follows:

For SRs that are new in this amendment, the first performance is due at the end of the first surveillance interval, which begins on the date of implementation of this amendment.

For SRs that existed prior to this amendment whose intervals of performance are being reduced, the first reduced surveillance interval begins upon completion of the first surveillance performed after implementation of this amendment.

For SRs that existed prior to this amendment that have modified acceptance criteria, the first performance is due at the end of the first surveillance interval that began on the date the surveillance was last performed prior to the implementation of this amendment, except as noted below for SRs that have modified acceptance criteria as a result of revised allowable values.

For SRs that have modified acceptance criteria as a result of revised allowable values, the current allowable Values and current channel calibration frequencies are required to be met until the trip setpoints are changed to reflect the new allowable values and channel calibration frequencies. The trip setpoints are required to be changed no later than the unit startup after the first planned outage of sufficient duration to change all of the trip setpoints for the unit following implementation of this amendment.

For SRs that existed prior to this amendment whose intervals of performance are being extended, the first extended surveillance interval begins upon completion of the last surveillance performed prior to implementation of this amendment, except as noted above for SRs that have modified acceptance criteria as a result of revised allowable values.

(cc) Mitigation Strategy License Condition l

l Develop and maintain strategies for addressing large fires and explosions and l

that include the following key areas:

l l

(I)

Fire fighting response strategy with the following elements:

l

1.

Pre-defined coordinated fire response strategy and guidance l

2.

Assessment of mutual aid fire fighting assets l

3.

Designated staging areas for equipment and materials l

4.

Command and control l

5.

Training of response personnel l

l (II)

Operations to mitigate fuel damage considering the following:

l

1.

Protection and use of personnel assets l

2.

Communications l

3.

Minimizing fire spread l

4.

Procedures for implementing integrated fire response strategy l

5.

Identification of readily-available pre-staged equipment l

l Renewed License No. DPR-74 Revised by letter dated August 9, 2007

- 5B -

l

6.

Training on integrated fire response strategy l

7.

Spent fuel pool mitigation measures l

l (III)

Actions to minimize release to include consideration of:

l

1.

Water spray scrubbing l

2.

Dose to onsite responders l

(dd) The licensee shall implement and maintain all Actions required by Attachment 2 l

to NRC Order EA-06-137, issued June 20, 2006, except the last action that l

requires incorporation of the strategies into the site security plan, contingency l

plan, emergency plan and/or guard training and qualification plan, as l

appropriate.

l D.

Physical Protection The Indiana Michigan Power Company shall fully implement and maintain in effect all provisions of the Commission-approved physical security, training and qualification, and safeguards contingency plans including amendments made pursuant to provisions of the Miscellaneous Amendments and Search Requirements revision to 10 CFR 73.55 (51 FR 27817 and 27822), and the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The combined set of plans1, which contain Safeguards Information protected under 10 CFR 73.21, is entitled: "Donald C. Cook Nuclear Plant Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, Revision 1,"

submitted by letter dated May 10, 2006.

1The Training and Qualification Plan and Safeguards Contingency Plan are Appendices to the Security Plan.

Renewed License No. DPR-74 Corrected by letter dated 4/21/06 12/14/06 Revised by letter dated August 9, 2007