Closeout of Generic Letter 2006-03, Potentially Nonconforming Hemyc and MT Fire Barrier Configurations
ML072010149
Person / Time
Site: Seabrook 
Issue date: 08/31/2007
From: Geoffrey Miller
NRC/NRR/ADRO/DORL/LPLI-2
To: Peschel J, St.Pierre G
Florida Power & Light Energy Seabrook
Miller G, NRR/DORL, 415-2481
References
GL-06-003, TAC MD1631
Download: ML072010149 (4)


Text

August 31, 2007 Mr. Gene F. St. Pierre, Site Vice President c/o James M. Peschel Seabrook Station FPL Energy Seabrook, LLC P.O. Box 300 Seabrook, NH 03874

SUBJECT:

SEABROOK STATION, UNIT NO. 1 - CLOSEOUT OF GENERIC LETTER 2006-03, "POTENTIALLY NONCONFORMING HEMYC AND MT FIRE BARRIER CONFIGURATIONS (TAC NO. MD1631)

Dear Mr. St. Pierre:

The Nuclear Regulatory Commission (NRC) acknowledges the receipt of your June 9, 2006, response (Agencywide Documents Access and Management System (ADAMS) Accession No. ML061640269) to Generic Letter (GL) 2006-03, "Potentially Nonconforming Hemyc and MT Fire Barrier Configurations." This letter was supplemented by letter dated July 10, 2007 (ADAMS Accession No. ML071990101) in response to NRC staff questions. Under oath or affirmation, you have submitted documentation that Seabrook Station, Unit No. 1 does not rely on either the Hemyc or MT fire barrier system. You have submitted documentation under oath or affirmation that other 1-or 3-hour fire barriers that separate redundant safe shutdown trains located within the same fire area have been designed and installed in accordance with current NRC guidance.

Therefore, the NRC staff finds your "L-2006-118, 60-Day Response to NRC Generic Letter 2006-03, Potentially Nonconforming Hemyc and MT [[Topic" contains a listed "[" character as part of the property label and has therefore been classified as invalid. Configurations.|June 9, 2006, letter]] and July 10, 2007, supplement to be responsive to GL 2006-03. The basis for stating that this other fire barrier has been designed and installed in accordance with NRC guidance should be maintained on site and will be subject to inspection during the normal NRC inspection process.

If you have any questions regarding this response, please contact me at (301) 415-2481.

Sincerely,

/ra/

G. Edward Miller, Project Manager Plant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-443 cc: See next page

August 31, 2007 Mr. Gene F. St. Pierre, Site Vice President c/o James M. Peschel Seabrook Station FPL Energy Seabrook, LLC PO Box 300 Seabrook, NH 03874

SUBJECT:

SEABROOK STATION, UNIT NO. 1 - CLOSEOUT OF GENERIC LETTER 2006-03, "POTENTIALLY NONCONFORMING HEMYC AND MT FIRE BARRIER CONFIGURATIONS (TAC NO. MD1631)

Dear Mr. St. Pierre:

The Nuclear Regulatory Commission (NRC) acknowledges the receipt of your June 9, 2006, response (Agencywide Documents Access and Management System (ADAMS) Accession No. ML061640269) to Generic Letter (GL) 2006-03, "Potentially Nonconforming Hemyc and MT Fire Barrier Configurations." This letter was supplemented by letter dated July 10, 2007 (ADAMS Accession No. ML071990101) in response to NRC staff questions. Under oath or affirmation, you have submitted documentation that Seabrook Station, Unit No. 1 does not rely on either the Hemyc or MT fire barrier system. You have submitted documentation under oath or affirmation that other 1-or 3-hour fire barriers that separate redundant safe shutdown trains located within the same fire area have been designed and installed in accordance with current NRC guidance.

Therefore, the NRC staff finds your "L-2006-118, 60-Day Response to NRC Generic Letter 2006-03, Potentially Nonconforming Hemyc and MT [[Topic" contains a listed "[" character as part of the property label and has therefore been classified as invalid. Configurations.|June 9, 2006, letter]] and July 10, 2007, supplement to be responsive to GL 2006-03. The basis for stating that this other fire barrier has been designed and installed in accordance with NRC guidance should be maintained on site and will be subject to inspection during the normal NRC inspection process.

If you have any questions regarding this response, please contact me at (301) 415-2481.

Sincerely,

/ra/

G. Edward Miller, Project Manager Plant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-443 cc: See next page DISTRIBUTION:

PUBLIC CJackson, NRR RidsOgcRp LPLI-2 R/F RidsNrrDorlLpl1-2(HChernoff)

RidsNrrPMGMiller RidsNrrLAABaxter RidsAcrsAcnwMailCenter RidsRgn1MailCenter(GMatakas)

TDinh, NRR SWeerakkody, NRR Accession Number: ML072010149 OFFICE LPLI-2/PM LPL1-2/LAit LPLI-2/LA DRA/AFPB/BC LPLI-2/BC NAME GEMiller ABaxter MOBrien AKlein Hchernoff (JLamb for)

DATE 8/22/07 8/22/07 8/30/07 8/27/07 8/31/07 OFFICIAL RECORD COPY

Seabrook Station, Unit No. 1 cc:

Mr. J. A. Stall Senior Vice President, Nuclear and Chief Nuclear Officer Florida Power & Light Company P.O. Box 14000 Juno Beach, FL 33408-0420 Mr. Peter Brann Assistant Attorney General State House, Station #6 Augusta, ME 04333 Resident Inspector U.S. Nuclear Regulatory Commission Seabrook Nuclear Power Station P.O. Box 1149 Seabrook, NH 03874 Town of Exeter 10 Front Street Exeter, NH 03823 Regional Administrator, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Office of the Attorney General One Ashburton Place, 20th Floor Boston, MA 02108 Board of Selectmen Town of Amesbury Town Hall Amesbury, MA 01913 Mr. Robert Poole Federal Emergency Management Agency Region I 99 High Street, 6th Floor Boston, MA 02110 Mr. Tom Crimmins Polestar Applied Technology One First Street, Suite 4 Los Altos, CA 94019 John Giarrusso Massachusetts Emergency Management Agency 400 Worcester Road Framingham, MA 01702-5399 Ms. Kelly Ayotte, Attorney General Mr. Orvil Fitch, Deputy Attorney General 33 Capitol Street Concord, NH 03301 Mr. Christopher M. Pope, Director Homeland Security & Emergency Mgmt.

New Hampshire Department of Safety Bureau of Emergency Management 33 Hazen Drive Concord, NH 03301 Mr. M. S. Ross, Managing Attorney Florida Power & Light Company P.O. Box 14000 Juno Beach, FL 33408-0420 Mr. Rajiv S. Kundalkar Vice President - Nuclear Technical Services Florida Power & Light Company P.O. Box 14000 Juno Beach, FL 33408-0420 James M. Peschel Regulatory Programs Manager FPL Energy Seabrook, LLC PO Box 300 Seabrook, NH 03874 Ms. Marjan Mashhadi Senior Attorney Florida Power & Light Company 801 Pennsylvania Ave., NW Suite 220 Washington, DC 20004

Updated 7.16.07 Seabrook Station, Unit No. 1 cc:

Mr. Mark E. Warner Vice President, Nuclear Operations, North Region (Seabrook & Duane Arnold Plants)

Florida Power & Light Company P.O. Box 14000 Juno Beach, FL 33408-0420 Mr. Gene F. St. Pierre Site Vice President FPL Energy Seabrook, LLC P.O. Box 300 Seabrook, NH 03874 Mr. Joseph Roy Director of Operations Massachusetts Municipal Wholesale Electric Company Moody Street Ludlow, MA 01056 Mr. Don E. Grissette Vice President, Nuclear Training and Performance Improvement Florida Power & Light Company P.O. Box 14000 Juno Beach, FL 3340 Mr. Michael W. Kiley Plant General Manager FPL Energy Seabrook, LLC P.O. Box 300 Seabrook, NH 03874