ML072010004
| ML072010004 | |
| Person / Time | |
|---|---|
| Site: | Saint Lucie |
| Issue date: | 07/19/2007 |
| From: | Haag R Division of Reactor Safety II |
| To: | Stall J Florida Power & Light Co |
| References | |
| Download: ML072010004 (6) | |
Text
July 19, 2007 Florida Power and Light Company ATTN: Mr. J. A. Stall, Senior Vice President Nuclear and Chief Nuclear Officer P. O. Box 14000 Juno Beach, FL 33408-0420
SUBJECT:
REQUALIFICATION PROGRAM INSPECTION - ST. LUCIE NUCLEAR PLANT
Dear Mr. Stall:
In a telephone conversation on July 19, 2007, Mr. Gerry Laska, NRC Senior Operations Examiner, and William Smith, Operator Training Supervisor LOCT, made arrangements for the NRC to inspect the licensed operator requalification program at the St. Lucie Nuclear Plant.
The inspection is planned for the week of August 27, 2007, which coincides with your regularly scheduled requalification examination cycle. The staff at your facility should prepare and conduct the requalification examinations in accordance with your NRC-approved requalification program. It is our understanding that your simulator is committed to ANSI/ANS-3.5-1998, American National Standard for Nuclear Power Plant Simulators for use in Operator Training and Examination.
In accordance with 10 CFR 55.59(c), the NRC has requested that you submit (one week prior to the inspection/make ready upon arrival), the material as specified in the Enclosure, in order to support the NRC's inspection program needs. Mr. Smith has been advised of this request and provided with the name and address of the NRC lead inspector assigned to this inspection.
This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number Part 55 (3150-0018), which expires on June 30, 2009.
The public reporting burden for this collection of information is estimated to average 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the Information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail at SLF@NRC.GOV; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0101), Office of Management and Budget, Washington, DC 20503.
The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB approval number.
FP&L 2
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Thank you for your cooperation in this matter. If you have any questions regarding this inspection, please contact Mr. Gerry Laska at (404) 562-4626 or myself at (404) 562-4607.
Sincerely,
\\\\RA\\\\
Robert C. Haag, Chief Operations Branch Division of Reactor Safety Docket No. 50-335, 50-389 License No. DPR-67, NPF-16
Enclosure:
Materials Request List cc w/encl:
William E. Webster Vice President, Nuclear Operations South Region Florida Power & Light Company Electronic Mail Distribution Gordon L. Johnston Site Vice President St. Lucie Nuclear Plant Florida Power & Light Company Electronic Mail Distribution Christopher R. Costanzo Plant General Manager St. Lucie Nuclear Plant Electronic Mail Distribution Bill Parks Operations Manager St. Lucie Nuclear Plant Electronic Mail Distribution
FP&L 3
Terry L. Patterson Licensing Manager St. Lucie Nuclear Plant Electronic Mail Distribution Rajiv S. Kundalkar Vice President - Nuclear Technical Services Florida Power & Light Company Electronic Mail Distribution Don E. Grissette Vice President, Nuclear Training and Performance Improvement Florida Power & Light Company Electronic Mail Distribution Seth B. Duston Training Manager St. Lucie Ocean Drive Florida Power & Light Company Electronic Mail Distribution M. S. Ross, Managing Attorney Florida Power & Light Company Electronic Mail Distribution Marjan Mashhadi, Senior Attorney Florida Power & Light Company Electronic Mail Distribution William A. Passetti Bureau of Radiation Control Department of Health Electronic Mail Distribution Craig Fugate, Director Division of Emergency Preparedness Department of Community Affairs Electronic Mail Distribution J. Kammel Radiological Emergency Planning Administrator Department of Public Safety Electronic Mail Distribution Douglas Anderson County Administrator St. Lucie County 2300 Virginia Avenue Ft. Pierce, FL 34982
__ML072010004_____________
OFFICE RII:DRS RII:DRS SIGNATURE GWL1 RCH NAME GLaska BHaag DATE 7/19/2007 7/19/2007 7/ /2007 7/ /2007 7/ /2007 E-MAIL COPY?
YES NO YES NO YES NO YES NO YES NO YES NO YES NO
Materials Request List The items listed below are being requested per telephone conversation on July 19, 2007, to support the upcoming IP-71111.11 inspection in August 2007 at the St. Lucie Nuclear Plant.
Items in paragraph "A" are to be sent prior to the inspection. They must be received in our office by August 16, 2007. Please have the items listed in paragraph "B" ready for our review upon arrival on August 27, 2007.
A.
In-office inspection material:
1.
Exam results since last requal inspection, copies of exam that had pass/failure rates significantly outside the average.
2.
A copy of the last biennial requal written examination (2RO/SRO exams) and all biennial re-takes.
3.
List of personnel scheduled for requal testing the week of 08/27/07.
4.
Copies of simulator scenarios for this exam (when available).
5.
Program evaluation for the previous 2 years training cycle.
- 6. A list of all personnel that reactivated their licenses since the last requal inspection.
7.
Simulator:
List of all open simulator discrepancies (SSRs).
Copy of the Simulator Management and Configuration Procedures.
List of all closed simulator SSRs for last 12 months.
List of Simulator Performance tests.
B.
On-site inspection material:
1.
Condition Reports and LERs resulting from human performance errors since the last requal inspection.
2.
All training feedback forms since the last requal inspection.
3.
All remedial training packages since the last requal inspection.
4.
Security badge and HP printouts for all (selected) personnel that reactivated their licenses since the last requal inspection.
Enclosure
2 5.
Copies of the reference list for all administrative procedures which direct the training process, including development of training and test materials, remedial training, modifications, plant and industry experience.
6.
Records for maintenance of active licenses - time on shift 56/60 hrs/qtr since the last requal inspection.
7.
All Medical Exam Records with a copy of the individuals licence attached.
8.
Simulator JPMs and in-plant JPMs that have been administered for this requal exam.
9.
Copy of an Organizational Chart for the training department including the simulator group.
10.
Complete list of all Licensed individuals complete with license restrictions.
11.
Security procedures for the simulator.
Enclosure