OFFICE OF THE SECRETARY CORRESPONDENCE CONTROL TICKET Date Printed: Jul 10, 2007 16:11 PAPER NUMBER:
ACTION OFFICE:
AUTHOR:
AFFILIATION:
ADDRESSEE:
SUBJECT:
LTR-07-0457 LOGGING DATE: 07/09/2007 DED C
01s.
EDO DEDMRS Susan Shapiro DEDR DEDIA NY AO Dale Klein Request for documents prior to the commencement of the 60 day intervener clock, as part of the relicensing review process ACTION:
DISTRIBUTION:
LETTER DATE:
ACKNOWLEDGED SPECIAL HANDLING:
Appropriate Chairman, Comrs 06/29/2007 No Made publicly available in ADAMS via EDO/DPC NOTES:
FILE LOCATION:
ADAMS DATE DUE:
DATE SIGNED:
FUSE (FRIENDS UNITED FOR SUSTAINABLE ENERGY) 21 PERLMAN DRIVE SPRING VALLEY, NY 10977 (845) 371-2100 TEL (845) 371-3721 FAX 6/29/07 Dr. Pao-Tsin Kuo, PE Director, Division of License Renewal Mail Stop Q-11 F1 Washington, DC 20555 Richard Barkley Nuclear Regulatory Commission ("NRC")
475 Allendale Road King of Prussia, PA 19406 Chairman's Office Nuclear Regulatory Commission ("NRC")
Washington, DC 20555-0001 RE: Documents requested.
Dear Dr. Pao-Tsin Kuo:
I represent a large group of Stakeholders and am requesting the following documents from the NRC prior to the commencement of the 60 day intervener clock, as part of the relicensing review process.
- 1.
All documents referred to and incorporated by reference in the relicense application must be made available by the Applicant, Entergy, for inspection in a public place in Westchester County, prior to the NRC starting the 60 day intervener clock.
- 2.
A complete list of what systems and components are specifically within the scope of relicensing.
- 3.
A complete list of all deviations and exemptions, extensions and dates for IP 1, IP2 and IP3
- 4.
A complete list of all the underground, inaccessible piping, how many feet, composition, and what is running through them.
- 5.
A list of any and all criteria by which a new license can be denied.
- 6.
A list of any and all criteria by which a new superceding license can be denied.
- 7.
A cost analysis as to the actual cost of decommissioning IP 1, IP2 and IP3 respectively, in light of the known and unknown leaks.
- 8.
Electrical separation repair/mitigating documents and a walk down of the repairs.
- 9. Seek a mathematical/engineering determination if there is enough room in the spent fuel pools and dry cask field to store the nuclear waste that will be produced during the proposed license extension, with cooling towers.'
- 10. The financials for the past 6 years of the lobbying group, the NEI (Nuclear Energy Institute).
In addition we request ANY and ALL meetings, regarding the relicensing application, ASLAB or others, take place within Westchester County in proximity of the plant.
Thank you for your assistance.
Sincerely yours, cc: Sen. Hillary Clinton